Non-Conformity Report: Date NCR No.: Sheet: 1/1 Client: Project: Job No: Item

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

NEGEMCO For Engineering and Contracting

Processing Equipment

Date :
Non-Conformity Report NCR No. :
Sheet : 1/1

Client: Project: Job No:


Item :
Description of Non - Conformance:

Quality Control Inspector: Date:

Disposition Recommended:

QCM AI
Sign & Date: Sign & Date:

Disposition Verified:

Use Repair/Rework Scrap/Return to vendor

Inspected By: Date:

TOM QCM AI
Signature

Exhibit (13.01) REV 0


Date

Exhibit (13.01) REV 0

You might also like