Assignment Section A: Introduction: UEME4253 Project Management MAY 2020

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

UEME4253 Project Management MAY 2020

Assignment
Section A: Introduction
The project management assignment topic should be conducted in ONE of the
following themes:
1. Event Management
2. Business
3. Construction
4. Smart Cities
5. Transportation
6. Product Development
7. Health Care
8. Environment

The project should be done in a group 6. A group leader/project manager must be


appointed. The minutes of the group meeting must be recorded and compiled as part
of the appendix.

Please include a table of content.


For referencing please follow the final year project guideline.
Typical Report Length – 25 ~ 35 pages.

Assignment Due – (Week 9, Wednesday)

Section B: Outcome based Education (OBE)

The project management assignment will measure the student’s ability on the
following course outcomes:

CO2 - Explain scheduling of resources and budgets in a project.


CO3 - Compare the different types of organization and its application.
CO4 - Choose and recommend appropriate risk assessment procedures for
managing risk in projects.
CO5 - Evaluate quality, time and cost in the project triangle.

The above course outcomes are linked to the following programme outcomes (PO):

No. CO Programme Domain & Assignment


Outcomes (PO) Taxonomy Level#
(e.g. A2 / C3 / P5)
2 CO2 PO3 C3 - Cognitive √
3 CO3 PO1 C4 - Cognitive √
4 CO4 PO7 A3 - Affective √
5 CO5 PO12 A4 - Affective √
#
Domain – Affective (A), Cognitive (C), Psychomotor(P); Taxonomy Level – A (Level
1 – 5), C (Level 1 – 6), P (Level 1 – 7)

UEME4253: PROJECT MANAGEMENT 1/2


UEME4253 Project Management MAY 2020

Programme Outcomes:

PO1 – Acquire and apply fundamental knowledge of science, engineering and


mathematics, with an engineering focus in solving complex engineering problems
PO2 –Apply first principles of mathematics, natural and engineering sciences to
identify, study, formulate and evaluate complex engineering problems based on
systematic approach and leading to authenticated conclusions
PO7 – Recognise the significance of sustainable development when devising
professional solutions to engineering problems with a clear understanding and pro-
active considerations of environmental concerns as well as needs for eco-friendly
continual growth for local and global community;
PO12 – Show capability to comprehend and apply engineering and management
philosophy to manage projects of in cross disciplinary content, as a member or a
leader in a team realising the importance of cost-effective design and solution for
sustainable development.

Assignment Due – (Week 9, Wednesday)


Softcopy submission for Report

UEME4253: PROJECT MANAGEMENT 2/2

You might also like