CALCULATION SHEET

Designed By: NR JOB No: C110


Checked: SVD Contract:
Conn.No: Rev: R0
Date: Code: Euro

Calculation for shear transfer through bond stress and shear studs
Length of Composite column = 1200
Breadth of Composite column = 900 mm
Top Flange Width (B) = 600 mm
Top Flange Thickneess (tf) = 50 mm
Web Depth (h) = 600 mm
Web Thickness (tw) = 30 mm
Bottom Flange Width (B) = 600 mm
Bottom Flange Thickneess (tf) = 50 mm
Height of the column H = 3400 mm
Modulus of elasticity of steel E = 210000 N/mm2
Yield stress Fy = 450 N/mm2
Charactristic concrete strength Fc = 60 N/mm2
Elasticity of concrete Ec = 4700*sqrt(Fc') Ec = 32562.56
Introduction length Lint = 1800 mm
Shear stud dia hd = 19 mm
Ultimate stress of studs Fu = 450.00 N/mm2
No. of shear studs per section n = 6 No.
Spacing of studs along member length s = 300 mm
Bond stress Tbd = 0.3 N/mm2 Eurocode 4
Rebar Dia = 25
Rebar No = 24
Total Axial Load transfered at floor level = 2182 C7 at 3rd

Force distributed based on Rigidity


P=Psteel+Prcc
Steel Section Rigidity EsAs = 16380000000 N
Concrete Rigidity 0.6EcAc = 26102144234 N
Rebar Rigidity ErAr = 2474010000 N
Total Rigidity (EA)eff = 44956154234 N

Load on Steel Ps = 795.0226306 Kn


Load on RCC Pc = 1386.977369 Kn

Nominal Axial Comp strength Po = 92092500 Kn As*Fy + Asr*Fyr + 0.85*Ac*Fc


Shear Force to be transfred Vr = -36.62164013 Kn

Transfer of Force to RCC

Introduction length Lint = 1800 mm


Force transferred though bond Fb = 2019.6 Kn
Capacity of 1 stud Qn = 81.60 Kn Euro 4
No of studs in Introduction length n = 36
Force transferred though studs Fs = 2937.6 Kn
Force(Bond+Studs)>Force(Transfer from steel to concrete) Fs+Fb>Pc+Vr
Total capacity of Studs and Bond is greater than load to be transferred