Brief Rate Analysis
Brief Rate Analysis
Brief Rate Analysis
M
Rate in Rs. 850 1300 1800 17.0 4.8
1.0 Earthwork
1.1 Earthwork in excavation cum
1.2 Gravel mixed earth excava. cum
1.3 Earthwork in filling cum
2.0 Brickwork
2.1 Brick on edge soling sqm 0.07 75.00
2.2 One layer flat brick soling sqm 0.07 42.00
M
Rate in Rs. 850 1300 900 1250 45
R. D.
S.N Cement Sand C. paint
Particulars Unit Stone Stone
o. Bag Cum Kg
Cum Cum
6.0 Stone Work
6.1 Stone/boulder soling cum 0.70 1.20
6.2 Stonework in found. 1:6 cum 2.12 0.47 1.10
6.3 Stonework in superstr 1:4 cum 3.18 0.45 1.10
M
Rate in Rs. 37086 8.86 1.50 210 30
Holdf Screw/ 4mm
S.N Salwoo T. bolts
Particulars Unit ast nail ply
o. d Cum Nos
Nos Nos sqm
9.0 Wood Works
9.1 Door & Window Frame cum 1.10 92.00 184.00
(taking door size 0.90x2.1m)
B. Gravel
Reinfr Sal Wood Mat amt. Skill Unskill Lbr. amt. Mat &
Wire fill
Kg Cum Rs Day Day Rs Lbr Rs
Kg Cum
Primer Block Enamel S. pa Mat amt. Skill Unskill Lbr. amt. Mat &
Ltr Nos Ltr Nos Rs Day Day Rs Lbr Rs
Glass Handle Wiremes Hinge Mat amt. Skill Unskill Lbr. amt. Mat &
sqm Nos h sqm Nos Rs Day Day Rs Lbr Rs
Overhead
Total Cost analysis of Tile work without tile
15%
1212.45 9295.45
1159.50 8889.50
1325.25 10160.25
287.63 2205.13
1725.30 13227.30
246.53 1890.03
82.05 629.05
50.03 383.53
2051.55 15728.55
2243.55 17200.55
334.40 2563.70
16.18 124.03
Amt.
Overhead
Total
15%
467.25 3582.25
1207.95 9260.95
1528.58 11719.08
102.21 783.61
66.57 510.37
73.97 567.12
13.43 102.98
29.94 229.54
Amt.
Overhead
Total
15%
11765.36 90201.08
872.04 6685.62
501.15 3842.12
1067.52 8184.32
706.65 5417.67
1230.29 9432.23
1017.87 7803.65
125.75 964.11
8731.55 66941.85
8731.55 66941.85
RATE ANALYSIS
2007
Material
Rate in Rs. 850 2700 3880.8 13.0 18 82 110 55000 5000 2000 3500 45 140 55
B.
S.N Cement Sand Aggre Local Bk Chin. Reinfr Sal Wood B. Bts R. Stone D. Stone C. paint Primer Block
Particulars Unit Qty Wire
o. Bag Cum Cum Nos Bk Nos Kg Cum Cum Cum Cum Kg Ltr Nos
Kg
1.0 Earthwork
1.1 Earthwork in excavation cum 1
1.2 Gravel mixed earth excava. cum 1
1.3 Earthwork in filling cum 1
2.0 Brickwork
2.1 Brick on edge soling sqm 1 0.07 75.00
2.2 One layer flat brick soling sqm 1 0.07 42.00
2.3 Brickwork in foundation 1:6 cum 1 1.40 0.30 560.00
2.4 Chimney brickwork in supstr 1:6 cum 1 1.40 0.30 560.00
2.5 Chinese brkwk in supstr 1:6 cum 1 1.40 0.30 530.00
2.6 Chimney brkwk in supstr 1:4 cum 1 2.00 0.28 560.00
2.7 Chinese brkwk in supstr 1:4 cum 1 2.00 0.28 530.00
RATE ANALYSIS
2007
Material
Rate in Rs. 51000 15 1.50 210 30 400 20 65 20
Holdf Screw/
S.N Salwoo 4mm ply T. bolts Glass Handle Wiremes Hinge
Particulars Unit ast nail
o. d Cum sqm Nos sqm Nos h sqm Nos
Nos Nos
9.0 Wood Works
9.1 Door & Window Frame cum 1.10 92.00 184.00
(taking door size 0.90x2.1m)
9.2 Shutter for doors & windows
a) Glazed shutter sqm 0.03 10.00 2.00 0.49 1.00 4.00
b) Wiremesh shutter sqm 0.02 10.00 2.00 1.00 0.95 2.00
c) panelled door shutter sqm 0.05 15.00 2.00 1.00 3.00
d) Flushed door shutter sqm 0.02 15.00 2.08 2.00 1.00 3.00
e) Glazed panelled shutter sqm 0.04 15.00 2.00 0.49 1.00 3.00
f) Glazed flushed shutter sqm 0.03 15.00 1.07 2.00 0.49 1.00 3.00
Enamel Mat amt. Skill Unskill Lbr. amt. Mat & Overhea
S. pa Nos Total
Ltr Rs Day Day Rs Lbr Rs d 15%