PLTP Dieng Unit 1: Weekly Report #1
PLTP Dieng Unit 1: Weekly Report #1
PLTP Dieng Unit 1: Weekly Report #1
WEEKLY REPORT #1
DOCUMENT NO :
001/WR/WJA/GEO-PRJ2/020
WEEKLY PROGRESS REPORT
Pekerjaan Jasa Sewa Alt Berat Dan Pengadaan Material Persiapan Work Over Pad#10 Unit Dieng
B. Wasqitho
Site Manager
PT. Wirana Jayatama Abadi PT. Geodipa Energy (Persero) PT. Geodipa Energy (Persero) PT. Geodipa Energy (Persero)
DAILY PROGRESS REPORT
Pekerjaan Jasa Sewa Alt Berat Dan Pengadaan Material Persiapan Work Over Pad#10 Unit Dieng
Duration Progress
Week no.
Sect. Description (week) Plan Actual Variance
Plan Actual % % %
1 Base Line work 6 1 24,08 25,62 1,54
Reference : S-Curve and schedule approval
Progress
Sect. Description Plan Actual Variance
% % %
1 Mobilisasi & Demob 1,63 1,63 0,00
2 Sewa Excavator PC. 75 4,49 5,04 0,55
3 Sewa Excavator Pc. 200 6,57 7,56 0,99
4 Sewa Dump Truck 11,39 11,39 0,00
5
3. Highligths
No Description Remark
1 Pekerjaan sudah dimulai dr tgl. 3/7/2020
2
3
4
Progress
No Description
Last week This week Total
5. Weather Report
Time
No Date
8-9 AM 9-10 AM 10-11 AM 11-12 AM 12-1 PM 1-2 PM 2-3 PM 3-4 PM 4-5 PM
1 03 Juli 2020 C C C C C C C C C
2 04 Juli 2020 C C C C C C C C C
3 05 Juli 2020 C C C C C C C C C
4 06 Juli 2020 C C C C C C C C CL
5 07 Juli 2020 C C C C C C C C CL
6 08 Juli 2020 C C C C C C C C CL
7 09 Juli 2020 C C C C C C C C CL
Legend:
C = Clear
CL = Cloudy
R = Rainy
F = Fog
Weekly Report
Progress Picture
Project Activity