Assignment OT
Assignment OT
Depot
Centres A B C D E tons
P 4 1 3 4 4 60
Q 2 3 2 2 3 35
R 3 5 2 4 4 40
Tons 22 45 20 18 30
What should be distribution program that minimize the transportation cost?
Q.8. Solve the following assignment problem:
I II III IV V
A 1 3 2 3 6
B 2 4 3 1 5
C 5 6 3 4 6
D 3 1 4 2 2
E 1 5 6 5 4
Q.9. A firm is considering the replacement of a machine, whose cost price is Rs 12,200, and
its scrap value is Rs 200. From experience the running (maintenance and operating)
costs are found to be as follows:
Year 1 2 3 4 5 6 7 8
Running Cost(Rs): 200 500 800 1,200 1,800 2,500 3,200 4,000
What should the machine be replaced?
Q.10. Four jobs 1, 2, 3 and 4 are to be processed on each of the four machines A, B, C and D
in the order ABCD. The processing time in minutes are given the following table. Find
the minimum total elapsed time when passing is not allowed. Also, find the idle time
for each machine.
Job : 1 2 3 4
Machine A : 58 30 28 64
Machine B : 14 10 12 16
Machine C : 14 18 16 12
Machine D : 48 32 44 42