Quantity List and Pricing Table of Partitioned & Subdivisional Projects and Unit Rate Preliminaries
Quantity List and Pricing Table of Partitioned & Subdivisional Projects and Unit Rate Preliminaries
Name of
No.
Project
Mechanical
51
connection
Mechanical
52
connection
Mechanical
53
connection
)
Inaccessible
61 roof (for the
roof of
elevator and
plant room)
Eaves-(Refer
to the
62 inaccessible
roofing
practice)
Planting roof
(two
63 waterproof
layers,
waterproof
level: class 1)
Quantity list and pricing table of partitioned & subdivisional proje
2. Dry-laid polyester fiber non-woven fabric (200g/m^U2^U) with a lap width of not less than 150
4. 30 thick 1:3 cement mortar leveling course (including composite anti-crack fiber)
5. 1:8 weight ratio cement hydrophobic expanded perlite slope course 3% with the thinnest part of 30 thick, sloping
to the drain according to the drawings.
7. 3 thick synthetic polymer waterproof coating, turn up along the wall in the case of buildings with 300 height
calculated from the highest point of the roof finished faceed face, and use 150 high galvanized steel plate to
compact and seal at the junction along the wall.
9. Take reinforcing concrete structural slab as base course, coated with base course treatment agent.
1. Protective course: 50 thick C25 fine stone concrete protective course (with φ6 grade I steel two way@150
reinforced wire mesh fixed by binding or spot welding, with dividing joint), @4000 expansion joint, bottom 20 and
surface 25, steel frame disconnected, caulked with silicone sealing paste.
2. Dry-laid polyester fiber non-woven fabric (200g/m^U2^U) with a lap width of not less than 150
3. 65 thick foam glass insulation board (combustion performance: class A). (calculated separately)
4. 30 thick 1:3 cement mortar leveling course (including composite anti-crack fiber)
5. 1:8 weight ratio cement hydrophobic expanded perlite slope course 3% with the thinnest part of 30 thick, sloping
to the drain according to the drawings.
7. 3 thick synthetic polymer waterproof coating, turn up along the wall in the case of buildings with 300 height
calculated from the highest point of the roof finished faceed face, and use 150 high galvanized steel plate to
compact and seal at the junction along the wall (calculated separately)
9. Take reinforcing concrete structural slab as base course, coated with base course treatment agent.
1、300厚种植土
1. 300 thick planting soil
2、过滤布
2. Filter fabric
4. 50 thick C25 fine stone concrete protective course (with φ6 grade I steel two way@150 reinforced wire mesh
fixed by binding or spot welding, with dividing joint), @4000 expansion joint,bottom20 and surface 25, steel frame
disconnected, caulked with silicone sealing paste.
3. 1.5 thick synthetic polymer root puncture resistant self-adhesive waterproof membrane, turn up 300 along the
wall in case of building. (calculated separately)
6. Dry-laid polyester fiber non-woven fabric (200g/m^U2^U) with a lap width of not less than 150
8. 30 thick 1:3 cement mortar leveling course (including composite anti-crack fiber)
9. 1:8 weight ratio cement hydrophobic expanded perlite slope course 3% with the thinnest part of 30 thick, sloping
to the drain according to the drawings.
10. 2.5 thick self-adhesive polymer waterproof membrane, turn up along the wall in the case of buildings with 300
height calculated from the highest point of the roof finished face, and use 150 high galvanized steel plate to
compact and seal at the junction along the wall (calculated separately)
11. 3 thick synthetic polymer waterproof coating, turn up along the wall in the case of buildings with 300 height
calculated from the highest point of the roof finished faceed face, and use 150 high galvanized steel plate to
compact and seal at the junction along the wall (calculated separately)
13. Take reinforcing concrete structural slab as base course, coated with base course treatment agent.
** TAX & VAT are not included with the rate mentioned above **
** These rate will be same up to 1st floor and 3% rate will be increased for every one floor lifting **
Amount (yuan)
Unit of
Engineerin
measure
g quantity Among them:
ment Comprehensive unit Comprehensive
provisional
price total price
valuation
个 2768 -
Piece
个 904 -
Piece
个 393 -
Piece
m2 209.83 -
m2 183.63 -
m2 2210.11 -
-
\08