0% found this document useful (1 vote)
1K views2 pages

Combined Gradation of DBM Grade II

Plonjhyg. . gfxzswqfc. Bj k m.. hvcfrugfx. Bj m. Jb h cdv jhhfdgyu bb vcxsadsfg. K knk..kopnbi vvxsghv bjj. Hg hg???gh. I

Uploaded by

manish upadhyay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
1K views2 pages

Combined Gradation of DBM Grade II

Plonjhyg. . gfxzswqfc. Bj k m.. hvcfrugfx. Bj m. Jb h cdv jhhfdgyu bb vcxsadsfg. K knk..kopnbi vvxsghv bjj. Hg hg???gh. I

Uploaded by

manish upadhyay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

National Highways Authority of India

Project : "4 Lanning of Saoner - Dhapewada - Kalmeshwar - Gondkhairi, NH-547E, Package-II from
Km 4.700 to Km 33.575 in the state of Maharashtra on EPC Mode"

Client National Highways Authority of India

Authority Engineer Theme Engineering Pvt.Ltd.

EPC Contractor M/S Dilip Buildcon ltd.

COMBINED GRADATION OF DBM (GRADE - II)


(AS PER MORT&H TABLE 500-10)

Source of Material Date of sampling

Type of material Date of testing

Location (km) Proposed use

Total weight (gm) Tested by

Weight Cum. Weight


Specification
IS Sieve Retained Retained % Retained % of Passing JMF Limit
limit
(gm) (gm)

37.5 100

26.5 90-100

19 71-95

13.2 56-80

4.75 38-54

2.36 28-42

0.300 7-21

0.075 2-8

Pan

Remarks :-

EPC Contractor's Representative Authority's Engineer Representative