STAR CEMENT MEGHALAYA LTD.
Equipment – Pyro-Jet Burner HPJ/ 289 KO)
Page 1 of 1
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Volume 1 of 1
Contract Item
: 481 BU 1
No.
HW Comm.
: P-13-0052
No.
State : 06.2020
Technical Machinery Documentation
Edition: 11.2010
Page 1 of 1
Note!
Sprache: englisch
Technical Machinery Documentation State: 02.2011
Contents Page
1. Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2. Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
11.2010
3. Risks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4. Operating instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
BA 822-0004 en
Previous edition:
7. Use as directed. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
9. Safety measures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
10.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
10.2 Welding and torch cutting work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
10.3 Shifting, loading, transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
10.4 Electrical equipment and machines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
10.5 Hydraulic and pneumatic system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
10.6 Working materials and auxiliaries. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
10.7 Lubricants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
10.8 Spare parts and accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
13. Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Alterations in this edition:
BA 822-0004/1 en
1. Preface
The following safety and health regulations must compellingly be considered and observed by
all persons or organisations coming into contact with the works and the operation of the product.
Moreover, the regulations in the respective product-specific operating instructions must be
observed.
2. Introduction
The HUMBOLDT WEDAG supplies machinery and plants for the cement and mineral industry all
over the world.
Without exception, these are declarable investment goods; they must be safely and economically
operated over many years. They comprise many individual components which interact
mechanically, electrically and from the process point of view.
• Also machines and plants (hereinafter referred to as “products”) built according to the
respectively approved technical rules and considered a “safe product” can entail risks for
persons, objects or the environment, in particular, if they are operated improperly and/or
by untrained staff and/or used not as directed and/or started or operated disregarding the
instructions.
• The accompanying documents include e.g. packing and storage regulations, installation
and assembly instructions, commissioning regulations, directions for use, operating
instructions, functional and system descriptions.
The information required in different phases and by different users can be filed in one document
or in different documents depending on their extent. All accompanying documents being part of
the supply are collected in one documentation and supplied in the contractually agreed number
of copies.
• Synonymously, suppliers and various laws, directives and standards also use other
designations such as “Instructions for use”, “User information”, “Operator information”,
“product documentation” and similar.
In place of the different terms, below, exclusively the term Operating Instructions will be used.
Page 2 of 10
BA 822-0004/1 en
3. Risks
Machines and plants entail risks for persons, objects or the environment, e.g.:
• Risks due to dismantling or putting out of function of safety devices and guards
Note!
4. Operating instructions
Operating instructions are written for the respective user. They contain the necessary information
about the product to allow it to be used for the intended purpose, properly effectively and safely
to the full extent.
• Operating instructions are part of the product and must be transferred to the new owner in
case of a resale.
• Operating instructions must always be kept handy at the place of operation of the product
for consultation.
• Among other things, operating instructions deal with residual risks, which cannot be
avoided by design measures.
• Special reference is made to the observation of the pictographs and signal words on the
product and in the instructions.
Note!
The HUMBOLDT WEDAG will not be liable for damage due to the
non-observance of the operating instructions.
Page 3 of 10
BA 822-0004/1 en
Special action-related warning references in the operating instructions draw the attention to risks,
which can occur in a special situation or in connection with a special behaviour. These
references are found directly before the dangerous actions.
Note!
Safety references are part of a package of measures for protecting the user of the product
against risks, which can occur by the use. For example, they point out
Safety references in the operating instructions are highlighted against the residual text by special
warnings, signal words (e.g. “DANGER”, “WARNING”, “CAUTION” and/or by their typographic
appearance).
Note!
Actions on the supplied product may only be performed by qualified users. This particularly
applies to repair works on electrical, mechanical, hydaulic and pneumatic systems.
Note!
Page 4 of 10
BA 822-0004/1 en
Duly considering the laws, regulations, directives and national regulations for the prevention of
accidents in force at the respective place of installation as well as internally applicable working,
operating and safety regulations, if any, the operator of the plant is obliged to prepare working
place descriptions and special internal operating instructions/regulations for his staff and the
operating personnel (user).
Note!
Like references directly installed on the machine such as a sense-of-rotation arrow, warnings
and safety references must be observed and, therefore, be kept in completely legible condition.
7. Use as directed
The conception of the product assumes a special kind of use. Therefore, it may only be used as
directed. The use as directed is described in the respective operating instructions. In this respect,
the technical specifications with information on the admissible field of application must be
particularly considered, e.g. the admissible environmental and operating conditions.
Note!
Deviating local conditions or applications, which were not expressly notified to the manufacturer,
cannot be considered for the manufacture of the product and, thus, cannot be included in the
operating instructions. If cases of that type become known, this urgently requires an agreement
with the manufacturer.
• Depending on the extent of the deviation, it may become necessary that the user has to
operate the plant under his own responsibility or to shut it down, if required.
A further operation of the plant can only be decided on, when the manufacturer and other
competent parties, if any, have been notified of the special changed conditions and measures for
a safe operation have been agreed and realised.
Conversions and changes of the operating mode deviating from the original conception, can
affect the safety and must not be performed without examination by and approval of the
manufacturer.
Page 5 of 10
BA 822-0004/1 en
9. Safety measures
• the product is in proper condition and has been prepared for commissioning duly
considering the operating instructions,
• all signal, warning, protective and safety devices are mounted and properly functioning
(e.g. emergency-off systems, protective linings, light barriers, protective doors, separating
and not-separating guards, acoustic warning systems, optical warning systems),
• the trial run with all required setting works has been successfully terminated,
• risks of any kind, e.g. by explosive gases, inflammable dust and electrical lines are
excluded,
• and similar
During operation of the plant, the operator must make sure that
• authorized persons can enter the plant only after consulting with the operator,
• all components are only operated in technically proper condition and as required for
operation,
• no inspection doors or covers can be opened, which can entail hazards during operation,
• no persons are transported with material conveying systems (e.g. belt conveyors),
• the plant sections with hazard potential are not left without supervision during operation,
• work on live parts may only be performed by persons charged and trained in this respect,
• lines and sets may not be touched, if the temperature of their outer walls could
exceed 70°,
• cleanliness and clearness of the working place and on and around the machines is
ensured,
• the location and the operation of fire extinguishers is known to the operating staff,
Page 6 of 10
BA 822-0004/1 en
• for the case of emergency, first-aid measures to a sufficient extent must be ensured,
• and similar
• The plant may only be operated with all guards and safety systems. This includes e.g.
mechanical and electrical contact guards, safety valves, contact thermometers, contact
switches, emergency-off switches etc.
• Generally, no guards and safety systems may be dismantled or put out of operation or
modified. This also applies to trial operation.
• The operating staff must be instructed by the operator to wear the personal, well-fitting
protective clothing.
10.1 General
• Assembly, inspection, maintenance work and repairs may only be performed by qualified
and experienced persons, who have been informed on the proper use of tools, lifting- and
transport facilities, who are accordingly trained and also make use of their knowledge.
• The indicated check and inspection intervals must be observed. Irrespective of the above,
the plant must be checked every day for oil leakages and damage.
• All work on the plant is permitted only during a standstill. The procedures for shutting down
described in the operating instructions must be observed.
• Prior to starting the work, the plant must be secured against unintended or unauthorized
connection. (Close main command unit, withdraw key and/or mount warning at the main
switch).
• Prior to the new connection, all guards and safety systems must be mounted or rendered
properly functioning again. Then, a function check of the safety systems must be made.
• Loosened screw unions must be strongly tightened again after the completion of the works
duly considering the specified tightening torques.
• The safe accessibility and working on the working levels must be ensured by climbing
aids, runways and working platforms.
Caution!
• All handles, steps, railings, pedestals, platforms, ladders, runways and working platforms
must be kept free from contamination, snow and ice.
Page 7 of 10
BA 822-0004/1 en
Caution!
Risk of intoxication and/or burns.
• Prior to welding- or torch-cutting works, the machine/the plant and its environment must be
cleaned from dust and inflammable matter.
• For shifting, loading and transport, the respective safety measures must be taken and the
applicable local accident prevention regulations be observed.
• Depending on the instructions given in the operating instructions, prior to the transport, a
suitable and environmental-friendly packing should be ensured, if necessary.
• Machine parts and larger sub-assemblies may only be loaded or transported with
approved, suitable and technically proper loading systems, auxiliary equipment, lifting
facilities, vehicles as well as load carrying means having a sufficient carrying capacity.
• The slinging points for load carrying means may be taken from the respective operating
instructions.
• Shifting, loading and transport of loads may only be performed by experienced and
qualified persons.
• It must be made sure that only qualified persons perform works on electrically operated
machines and systems or that they are supervised by responsible expert staff able to
recognize possible hazards and to avoid them.
• Electrically operated machines and systems are provided with touching guards, which
must by no means be removed during operation.
• The removal of guards can cause serious risks to health or material damage.
• Electrical equipments must regularly be inspected and checked. Defects such as loose
cable connection must be eliminated without delay and in a workmanlike manner.
• Works on motors and generators may only be performed, if these are standing still and the
plant is voltageless and secured against re-starting. During works on voltage-carrying
parts, a second person must be present who, in an emergency case, can activate the
emergency-off switch or the main switch with disconnection of thevoltage. The working
area must be cordoned off with a red-white locking chain and a warning. Only voltage-
insulated tools may be used.
Page 8 of 10
BA 822-0004/1 en
• During works on high-voltage sub-assemblies, after having released the voltage, the
supply cable must be connected to the ground and the components be short-circuited with
a grounding rod.
• Lines, hoses and screw unions must regularly be checked for leakages and externally
visible damage.
• Prior to starting the repair works, the affected system section must be rendered
pressureless.
• When handling oils, greases and other chemical substances, observe the specific safety
regulations.
• When handling hot working materials and auxiliaries, there is the risk of scalding or
burning.
• The operator must make sure a safe and environmentally friendly disposal of working
materials and auxiliaries.
10.7 Lubricants
• For a proper operation, observe the correct selection of the lubricants and observe the
lubricating intervals.
• The lubricants and intervals indicated in the operating instructions must be observed.
• The operator is informed of the use of spare parts meeting the technical requirements
specified by the manufacturer. This is ensured when using genuine spare parts.
• The liability of the HUMBOLDT WEDAG is excluded in case of damage due to the use of
unsuitable spare parts.
Page 9 of 10
BA 822-0004/1 en
• Before leaving the control stand or the plant, the operator must convince himself that the
plant is controlled by a suitable representative or is shut down.
• In case danger, it must be possible to shut down the plant after the activation of the (easily
accessible!) emergency-off switches.
• After an emergency shutdown, the plant may only be connected again, if the reason for
the emergency shutdown has been eliminated.
• If a direct risk for persons and plant sections is recognized, the next emergency-off switch
must be activated without delay and/or the competent operating and maintenance staff be
informed.
13. Storage
• In case of an extended storage time, please bear in mind that the storage time and/or the
storage conditions can affect e.g. the efficiency period of the lubricants and seals.
Page 10 of 10
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Section – 0
State : 06.2020
Technical Machinery Documentation State: 06.2020
VG P-13-0052 en
Preface Page 1 of 2
This Technical Machine Documentation serves as user information and is meant to facilitate get-
ting familiar with the machine and making optimum use of its possible applications as provided.
The Technical Machine Documentation - here in particular operating manual Chapter „Safety“-
must be read and observed by any person in charge of work such as transport, erection, com-
missioning, operation, maintenance and disposal of utilities and auxiliary materials. It includes
important instructions on how to operate the machine in a proper and economical manner.
Due to existing national regulations the Technical Machine Documentation has to be supplemen-
ted by directives concerning the prevention of accidents and environmental protection.
Moreover, also the approved technical rules on safe and proper operation must be observed.
Copyright
Copyright existing on this Technical Machinery Documentation remains the property of the KHD
Humboldt Wedag.
They contain regulations and drawings of technical nature which must not - nor in whole nor
partly - be distributed or used without authorization for competition purposes or disclosed to
others unless this has not been expressedly approved. A non-observance will entail damages
Mailing address
Telephone: + 91-11-42101100/1200
Fax: +91-11-42101104/1105
Website: www.khd.com
Technical Machinery Documentation State: 06.2020
Technical Machinery
Documentation
Pyrojet Burner
Section – I
State : 06.2020
Technical Machinery Documentation State: 06.2020
Contents: Page
Previous edition:
Page 2 of 2
working place
CERTIFICATE
Order-No. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : P-13-0052
Previous edition:
The working places of the operating staff for the PYRO-JET-Burner are not determined.
Due to the plant-specific arrangement of the PYRO-JET-Burner including its individual sets within the
thermal plant, noise emissions are generated which can only be measured during plant operation.
The operator must make sure that directly after commissioning, the acoustic power level is measured
during normal operation at all operating positions (e.g. control stand, maintenance and control positi-
ons).
If the measurements indicate that the admissible limit value is exceeded, the staff must wear personal
protective equipment (ear protection).
The operating condition of the PYRO-JET-Burner for the measured values must be designated "normal
operation".
Alterations in this edition:
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Section – II
Technical data
State : 06.2020
Technical Machinery Documentation State: 06.2020
Contents Page
1. Characteristic data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.1 General data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.2 Field of application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.3 Fuels. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.4 Identification code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.5 Dimensions, space requirement, weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.5.1 Burner. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.5.2 Burner carriage, Roof Mounted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Previoud edition:
2. Technical data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.1 Burner data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.2 Burner Outflow Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.3 Primary air values Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2.4 Burner carriage, Roof Mounted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2.4.1 Setting device (movement of Burner). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2.4.2 Drive Existing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.5 Rating plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.6 Burner Record . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2.7 Log for burner adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2.8 Diagram primary air- Optimum (Low Nox Operation) & Diagram primary air (Design)
10
2.9 Adjustments on the PYRO-JET Burner during commissioning . . . . . . . . . . . . . . . 11
1. Characteristic data
Installation data:
Altitude . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : Approx. 427 m above sea level
Ambient temperature . . . . . . . . . . . . . . . . . . . . . . : Min 7.1°C/ Max.40.2°C
Rel. Humidity . . . . . . . . . . . . . . . . . . . . . . . . . . . . : Min. 31 / Max. 98.1
Max. Wind Velocity. . . . . . . . . . . . . . . . . . . . . . . . : 17.8 Km/hr
1.3 Fuels
Volatiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : n.a. %
Moisture. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : n.a. %
HPJ/ 289 KO
Coal / Oil
Heating efficiency
Pyro-Jet
High pressure
1.5.1 Burner
Dimensions:
Total length . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : 12810 mm
Rated width . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : Ø 406.4 excluding refractory
Length refractory lining . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : 8000 mm
Weight:
Burner excluding refractory lining . . . . . . . . . . . . . . . . . . . . . . : 5031 kg
Burner including refractory lining . . . . . . . . . . . . . . . . . . . . . . : 8385 kg
Dimensions:
Total length . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : Existing
Width B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : n.a.
Height H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : n.a.
Weight:
Burner carriage with drive . . . . . . . . . . . . . . . . . . : n.a
2. Technical data
2.1 Burner data
Primary air
Stat.
Quantity portion
Systems Pressure
(m3/h) Coal/ Pet coke
(mbar)
(%)
Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .: Existing
Angular direction: . . . . . . . . . . . . . . . . . . . . . . . . . . . . --
HPJ/289
21771 -- --
13.287/ -- --
10:1
10
289
2020
P-13-0052
In this record shall be noted measures carried out on the burner, such as reconstructions, design
changes (if required, by stating the order no. of the firm in charge of this work). Exchanges of spare
parts etc., as well as operating problems. The manufacture should duly be informed..
After the alignment of the burner, we generally recommend to mark on the kiln axis (abt. 3% incli-
nation) the zero position of the burner prior to commissioning.
Every further change during operation shall be documented without delay and can be read from
according scales mounted for that purpose.
A scale at the rear suspension is meant for the height adjustment, the second scale for the lateral
adjustment.
For moving the burner further into or off the kiln, the customer must mount a scale besides the
burner carriage.
Note!
Coal-Transport- Con.
Oil Coal Swirl air Jet air Bypass Blow off Remarks
Air Swirl-Jet
Burner carriage
Geared motor
see point 3.1 1 1 Geared motor 7.3 l 350 1 year 6 month CLP 220
Technical Machinery
Documentation
Pyrojet Burner
Section-III
Operating Instructions:
a) General part Pyroject Burner - BA 407-0797_R2 en
State : 06.2020
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Section – III A
Operating Instructions –
State : 06.2020
Technical Machinery Documentation State: 09.2016
* Proper use
BA 407-0797-01 en
General
Page 1 of 3
Contents Page
1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3 Field of application. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
BA 407-0797-01 en
4 Copyright . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Previous edition:
1 Introduction
These information are meant to be read and observed in all items by those being respon-
sible for the Humboldt Wedag-PYRO-JET-Burner.
The complete technical documentation must always be kept near the PYRO-JET-Burner.
Details of particular importance for the use of the PYRO-JET-Burner are pointed out in the
operating instructions.
Only the knowledge of the present operating instructions (BA) may ensure a trouble-free
operation of the PYRO-JET-Burner. Therefore, it is very important that these operating
instructions are really known to the persons in charge.
We recommend to carefully study the present instructions as the manufacturer will not be
liable for damage and operational failures resulting from the non-observance of these
instructions.
The firing plant must only be assembled, serviced and operated by suitably trained and
qualified staff.
If, nevertheless, problems should occur during operation, please contact our after sales
service or the spare parts department or one of our agencies. They will be readily pre-
pared to assist you (refer to chapter " Spare parts keeping and after-sales service").
The present operating instructions exclusively refer to the PYRO-JET-Burner with the
auxiliary equipment included in the supply.
The illustrations are binding, however not true to scale.
We reserve the right to make technical changes necessary for improving the butt
stripping machine which are deviating from the descriptions and data given in these
operating instructions.
Note!
Alterations in this edition:
General
Caution!
2.3 Information
Note!
This symbol will appear near all safety information in the present
operating instructions (BA), where due to the influence of noise,
hearing defects may occur. Observe this information and absolu-
tely wear your personal protection aids, e.g. ear protection.
Page 2 of 3; BA 407-0797-01 en
BA 407-0797-01 enPage 3 of 3
General
3 Field of application
Caution!
The PYRO-JET-Burner has only been designed for the field of application
indicated in section "Customer-specific characteristic and technical data/
Field of application".
Prior to using the PYRO-JET-Burner beyond the contractually stipulated
field of application (see secton "Customer-specific characteristic and
technical data/Field of application"), consult the after-sales service of the
Humboldt Wedag (address as per section "Spare parts keeping and after-
sales service" as, otherwise, a warranty will not be given
4 Copyright
The copyright to the present operating instructions (BA) remains with the Humboldt Wedag. The
instructions are meant for the installation, operating and supervision staff. They contain regulati-
ons and drawings of technical nature which must not - nor in whole nor partly - be distributed or
used without authorization for competition purposes or disclosed to others unless this has not
been expressedly approved. A non-observance will entail damages.
Humboldt Wedag
http:/www.khd.com
Page 1 of 7
Contents Page
2. Safety information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.1 General safety information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.2 Person-related safety references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Previous edition:
3. Proper use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Caution!
1.3 Information
Note!
This symbol will appear near all safety information in the present
operating instructions (BA), where due to the influence of noise,
hearing defects may occur. Observe this information and absolu-
tely wear your personal protection aids, e.g. ear protection.
2. Safety information
• The PYRO-JET burner has been constructed according to the approved technical rules and
regulations and is operationally safe. However, this machine can entail risks, if it is impro-
perly operated by unskilled staff or is used in another way than directed or commissioned or
operated not observing the instructions given.
• No working method is permitted which could affect the safety of the PYRO-JET burner or
jeopardise the staff.
• By suitable instructions and checks, the user must ensure cleanliness and clearness of the
working place at the PYRO-JET burner.
• Unauthorised conversions and changes affecting the safety of the PYRO-JET burner are not
permitted.
• All repair works at the PYRO-JET burner must generally be made with the system standing
still and cooled down.
• Generally, for the installation and operation of the PYRO-JET burner, the applicable legal
regulations and directives must be observed, in particular the accident prevention regulati-
ons for firing systems.
• Hazardous areas must be marked and their access blocked. It is not permitted to enter such
areas.
Prior to first starting up, safety and monitoring facilities must absolutely
be installed. They must by no means become out of order or put out of
functioning.
Page 2 of 7; BA 407-0797-02 en
BA 407-0797-02 en; Page 3 of 7
• The removal or putting out of functioning of safety devices, e.g. for repair works is only per-
mitted during a standstill of the PYRO JET burner. After the completion of the works, the
safety devices must be mounted again or put into operation.
• Works and repairs at the PYRO JET burner are only permitted to be performed upon agree-
ment with the shift leader in charge.
• The mentioned regulations reduce the risk of hazards, if the activities are performed with the
necessary and directed care.
The access to the rotary kiln plant is only permitted with the required pro-
tective clothing.
• The PYRO JET burner must be operated, maintained and repaired exclusively by authori-
sed, trained and skilled staff. This staff must have been given a special training by the
respective person in charge as regards possible dangers.
• Every person who, on the premises of the user, is in charge of assembly, dismantling, re-
assembly, operation and maintenance (inspection, maintenance, repairs) of the PYRO JET
burner must have read and understood the complete operating instructions and, in particu-
lar, the chapter "Safety".
Caution!
• The operating staff is obliged to notify without delay any changes noticed at the PYRO JET
burner affecting the safety.
• The operator must oblige himself to always keep the PYRO JET burner in a proper condition
and to operate it under safe circumstances.
• The person responsible in the sense of this description is the person charged by the opera-
tor with the management of and the responsibility for the PYRO JET burner.
• To permit the safe performance of maintenance and/or repair works, the operator has to
nominate a responsible shift leader who will co-ordinate these works and determine the
competences between operating- and maintenance staff.
• The access to and inspection of the PYRO JET burner is only permitted, if:
– the PYRO JET burner has been moved out and cooled down
With the rotary kiln plant running, it is prohibited to stay in the dangerous
zone!
• In the burner area, working places in the sense of the working place regulations are the par-
ticularly specified, closed rooms such as switching- and operating stands as well as other
rooms for masters, offices or workshops which must not be assigned to the area influenced
by the burner, i.e. which must be protected against radiation heat, noise and dust.
• The environment of the PYRO JET burner with platforms, runways etc. is subjected to high
temperatures and dust loads and is no working place. The access to the specified areas
with suitable protective clothing is only meant for the purpose of inspections as well as main-
tenance and repair measures or, if required, for determining measured values.
• The PYRO JET burner can entail the following risks for the staff due to improper operation,
maintenance, assembly or conversion:
– Risk of slipping, tumbling, falling due to residues of oil, dust, coal dust or insufficient
lighting.
– Risk of squeezing or hitting on machine parts or when moving out the burner or due to
lacking protective or warning devices.
Page 4 of 7; BA 407-0797-02 en
BA 407-0797-02 en; Page 5 of 7
• Prior to starting the works, the drives and auxiliary devices must be secured against uninten-
ded connection. This is possible with a lockable local switch.
• The working instructions for isolating or closing the main fuse must be given in writing and
must be signed by the responsible electrician after the completion of the works.
• Prior to starting after repair works, check, whether all protective devices have been mounted
again.
• The carrying capacity of the lifting facilities must at least correspond to the weight of the bur-
ner.
• Only suitable and properly functioning lifting facilities are permitted to be used.
• After the electric installation or repairs to the electric system, the protective measures
applied must be tested (e.g. grounding resistance).
• All warnings at the PYRO JET burner must completely be kept in a legible condition.
• Only use genuine spare parts as these meet the requirements of the manufacturer. When
using other spare parts, there will be no liability from our side.
• All works on the PYRO JET burner must generally be performed upon a standstill in cold
and secured state.
• During operation, protective devices of the machine must be in the protecting position as
directed.
Note!
• For cooling the burner, the primary air blower must always be ready for operation. To that
end, the blower must be interlocked with the emergency power supply of the overall plant.
If an emergency power supply should not exist, the burner must be withdrawn from the hot
kiln system within 20 minutes.
The safety regulations for the coal dust firing systems in the area of the burner platform are the
same as for the entire residual coal dust firing systems, e.g. mill, bins, dosing.
Generally, for handling of coal dust, the respective official rules and regulations or the accident
prevention regulations will apply. In particular, the following safety references must be observed:
– Coal dust whirled up in the air entails the risk of fire and explosion. Therefore, never whirl up
coal dust.
– Keep the plant absolutely clean. Motors and switches must be kept free from coal dust
deposits.
– During operation, do not open manholes and inspection flaps in the grinding and bin system
as, by the entrance of air, the system being under negative pressure can generate an explo-
sive dust-air mixture. For the same reasons, possible leakages at containers and pipelines
must be eliminated without delay. Coal dust emerging from the system must be removed
with a vacuum cleaner.
– Open flames and smoking in rooms where works with coal dust take place are generally
prohibited.
– Welding at coal dust bearing parts is only permitted with the system shut down after tho-
rough cleaning and observing the strictest precautionary measures. (Written approval of the
plant management required).
– In case of an acute risk of fire or explosion, immediately interrupt the supply of coal dust and
avoid the entrance of fresh air and prevent the coal dust from being whirled up.
– If possible, endangered bins must be run empty into the firing system. If this should not be
possible, quench the fire. An indicator for a risk is, e.g., the rise of the temperature or of the
CO-content in the bin.
– Fires in bin-stored or stockpiled coal dust must not be fighted with a water jet but only with
an extinguishing method suitable for coal dust (e.g. steam, foam, carbon dioxide, nitrogen
etc.).
– Spread, smouldering or burning coal dust can also be extinguished with wet bags which
must permanently be kept wet.
– Extinguishing systems, pressure relieving facilities such as explosion flaps etc. and shut-off
gates must be regularly checked.
– Do not enter a bin filled with coal dust. Enter emptied bins only with the approval of the plant
management after sufficient ventilation and in the presence of a second person. Secure the
entering person with a rope. Secure the rope and keep oxygen breathing systems available.
– Prior to entering the mill, it must be made sure that the mill cannot start by removing the
main fuse of the mill motor.
– When starting the firing system after an operational failure, e.g. upon a current supply fai-
lure, the coal dust volumes deposited in the transport system can enter the burner or the
firing compartment without control. Measures must be taken to avoid a deflagration or
explosion. For example, reduce the set fuel oil volume (if this is not automatically set to "0"
upon an operation failure) or increase the O2- or combustion air volume or empty the
system by inching operation at smallest speeds and then start coal dosing again at the
smallest volume.
– Prior to every start of the burner, the required blowers/compactors must be connected and a
normal pressure drop must exist before starting the coal dust dosing system (increased
pressure indicates cloggings).
– Make sure that the burner carrier tube and all coal dust carrying lines etc. are always groun-
ded to avoid electrostatic charging.
Page 6 of 7; BA 407-0797-02 en
BA 407-0797-02 en; Page 7 of 7
The firing system is constructed according to the general DVGW-regulations (German Associa-
tion of the Gas- and Water Industry), TRD 412 (Technical Regulations for Pressure Vessels) as
well as the DIN-, VDE-, VDI- and the accident prevention regulations (VBG-regulations) and
must be operated observing all of them.
In case of danger due to emerging gas resulting from leakages, fire, flame blow-off etc., the local
emergency-off switch near the burner platform must be activated. If this should not be possible,
the emergency-off switch in the not endangered area of the escape way must be activated.
Moreover, particularly observe the enclosed operating instructions for auxiliary equipment and
fittings, see chapter "List of the separate documentations".
The gas-bearing lines must regularly be checked with a gas detection instrument.
Possible welding works to the pipeline after the operation of the burner system must only be per-
formed, after the pipeline has been cleaned from the gas residues (blown off). The pipeline must
be secured against following up gas which can be realised with a plug-on disc or a blind flange at
the manual shut-off cock in front of the respective fitting path. Furthermore, an inertisation with
CO2 or N2 is recommended.
Smoking and open flames are prohibited during all works on gas-bearing lines.
3. Proper use
• The PYRO JET burner is only permitted to be operated under the conditions laid down in the
"Technical data/Field of application". Any use beyond this is considered not as directed. The
manufacturer will not be liable for resulting damage, the risk will be borne by the user alone.
• The proper use also includes the observation of the conditions for assembly, dismantling
and re-assembly, commissioning, operation and repairs as well as of further regulations of
the Technical Documentation.
BA 407-0797-03_R1 en
Design and functioning
Page 1 of 11
Contents Page
1 Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
BA 407-0797-03 en State: 12.2007
1.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
1.2 Burner with three inslide burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
1.3 Identification of burner components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
2 Functioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
2.2 Function principle of PYRO-JET-burner. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
2.3 Burner functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Previous edition:
1 Design
1.1 General
Depending on specific design, the PYRO-JET-burner enables firing of coal, oil, gas or a
mixture of these fuels. The burner is supported on the burner carrier in that manner that it
can be swivelled and displaced. Coal dust is pneumatically supplied via telescopic pipes.
Fuel oil and gas are fed via hose connections. Swirl- and Jet-air are connected to the pri-
mary air distributor via flexible hose connections.
Note!
For illustration see documentation drawing “Coal dust burner “ in the section “List of documenta-
tion and spare parts drawings“.
The burner essentially consists of concentrically arranged tubes which form ducts and which are
identified by numbers from the inside towards the outside.
Duct 1 is formed by 3 supporting tubes (12.5), i.e. a supporting tube for the gas lance, oil
nozzle assembly and a supporting tube for the ignition burner. The supporting tubes
are guided or centred in the internal burner pipe (12.4).
Duct 2 conveys the swirl air and ends at the burner mouth with the swirl body (12.8) which is
tack-welded onto the supporting tubes for the slide-in burners (12.5).
Duct 3 conveys the carrier air laden with coal dust and ends at the burner mouth in an annu-
lar gap which is conically opening outwards. For reasons of wear, the conus angle of
the coal dust nozzle has been kept small.
To the coal dust pipe (12.3) separating the coal dust and jet air duct, the outer nozzle
disc (12.6) is welded. The inner coal dust nozzle (12.7) is screwed into the inner
nozzle pipe (12.4.1) which separates ducts 2 and 3 - combined with the inner burner
pipe (124). The inner burner pipe (12.4) is guided or centred with supporting ribs in the
coal dust pipe (12.3).
The coal dust is directed to duct 3 via the coal dust socket mounted with an inclination.
This connection socket is provided with an inspection opening with cover from where
the coal dust inlet area can be inspected.
The walls of duct 3 are protected against wear by a ceramic lining in the area of the
coal dust feed. The lining comprises small glued on wear-resistant ceramic plates.
The ceramic war protection of the outer area of duct 3 is glued onto the inner sides of
pipe half shells which are slid into the coal dust pipe (12.3). At the end flange of duct
3, the pipe half shells are secured against swirling and slipping by weld points. The
ceramic wear protection of the inner area of duct 3 is glued onto the surface of the
inner burner tube (12.4).The ceramic lining can be inspected through the inspection
opening of the coal dust socket. The surfaces of the parts of the coal dust outlet
system subject to wear are especially treated.
Duct 4 conveys the jet air and ends at the burner mouth with the nozzle disc (12.6), which is
welded to the coal dust pipe (12.3) and the burner supporting pipe (12.1). The nozzle
disc is provided with jet nozzle bores.
The burner tubes expand during operation to different degrees. The thermal expansions are
balanced by the axial compensator (12.2) which is accordingly pre-stressed, i.e. depending on
the burner design and size, it is extended by 10 to 30 mm.
All parts of the burner outlet system, except for the oil inslide burner, are ending flush in cold con-
dition. Tolerances of + 1 mm are admissible. The oil inslide burner is protruding by 10 + 1 mm
over the burner mouth to balance the thermal expansion during operation.
All flanged connections are bridged with copper wire to safely ground electrostatic charges.
Note!
The bolts, nuts and washers of the grounding bridging are corrosion-pro-
tected.
The outer cooling shell (12.60) must be locally provided with a refractory lining.
Duct 2 (swirl air) and duct 4 (jet air) are flanged via supports to the primary air distributor. Bet-
ween supports and primary air distributor, always one throttle flap and connection socket for
pressure measuring instruments are provided for.
Prior to feeding coal dust, a short connection line between primary air line and coal dust duct are
arranged. This bypass comprises a throttle flap and a blow-back valve.
For illustration see documentation drawing “Coal dust burner “ in the section “List of documenta-
tion and spare parts drawings“.
Item
12.1 Burner carrier tube
12.2 Axial expansion joint
12.3 Coal dust tube V
12.4 Inner burner tube V
12.5 Carrier tube for additional/insertion burner
12.6 Outer ring V
12.6.1 Burner carrier tube section replaced during repairs V*)
12.7 Nozzle plate V*)
12.8 Outer nozzle tube V 1)
12.9 Inner coal dust nozzle V
12.10 Inner nozzle tube V 1)
12.11 Swirl element V
12.12 Insertion burner/additional burner
12.13 Seal V*)
12.14 Seal V*)
12.15 Seal V*)
12.16 Grounding wire
12.17 Washer(corrosion-resistant)
12.18 Bolt (corrosion-resistant)
12.19 Protective ceramic wear lining V
12.19.1 Protective ceramic wear lining for repair V*)
12.20 Adhesive f. protective ceramic wear lining V
12.20.1 Adhesive f. protective ceramic wear lining for repair V*)
12.21 Heat-resistant lubricant (e.g. Anti Seize AS 2000)
12.22 Heat resistant sealing agent (e.g. WEVOPAT)
12.23 Refractory lining
12.24 Coal dust connection socket
12.25 Half tube shells (with protective ceramic wear lining)
12.30 Special repair welding electrode DIN8556 E2520 B20+ V*)
V: wear part/consumables/auxiliaries.
*): these parts resp. materials must be kept available during commissioning
1): for order placing, specify the length
2 Functioning
2.1 General
The design of the PYRO-JET combination burner is based on the practical experience of many
years considering the results of extensive studies of research and development.
The Humboldt Wedag developed the PYRO-JET burner for the economic firing of coal dust in the
rotary kiln. During the development, the findings of the proven Humboldt high-pressure gas bur-
ner were utilised for the rotary kiln which can be operated without primary air.
The PYRO-JET burner is a combination burner. Depending on its design, solid, liquid and
gaseous fuels can be fired at the same time or alternatively at different portions.
– Primary air portion and flame shape can be varied without influencing the pneumatic coal
dust transport
– High availability
The PYRO-JET burner is meant for introducing the processed fuel into the kiln such that it is
intensely mixed with the combustion air, rapidly ignited and completely combusted. The correct
design and setting of the firing system is decisive for the uniform, continuous and economic ope-
ration of the rotary kiln.
The course of the heat transition via convection and radiation depends on the burner conditions
and the respective kiln plant. The most favourable flame shape must be set during commissio-
ning. Here, it must be made sure that rotary kiln components such as the inlet and outlet seg-
ments as well as the refractory bricklining are not overheated. For a low heat consumption, a
short flame is favourable. This requires the rapid mixture of fuel and combustion air which shall
be available as about 1000°C hot secondary air at sufficient volumes.
The secondary air flows into the kiln only at low velocity. The desired rapid mixture of fuel and
combustion air requires an acceleration of the secondary air velocity. This is achieved by blowing
in part of the primary air through nozzles. The jet effect of the nozzles is such strong that hot
secondary air is sucked into the burner mouth. In this way, the fuel is strongly whirled with the
secondary air, resulting in a rapid ignition and a good combustion at short flame. Swirling of the
coal particles in the burner must be renounced in view of the connected wear and clogging. The
flame length is also essentially determined by the fuel type and the size of the fuel particles, the
grain distribution, the moisture and the dosing constancy. Generally, with increasing portion of
volatiles, the burning time is reduced. Other influences such as the agglomeration of the coal
particles can be counter-acted.
The combustion time is a function of the coal grain size. It increases at a square ratio with the
particle edge length. The optimal grain fineness is best determined via tests in the respective
plant considering the coal grinding costs. An approximate guideline for the grinding fineness can
be that the screen residues at 0.09 mm in % by volume should be 0.5 to 1 time the content of
volatiles in percent of the water-free coal.
To reduce the risk of self-ignition, the coal dust moisture must not fall below the following values:
for hardcoal: 1-2%
for lignite: 10-12%
A further pre-condition for an optimal combustion course is the uniform and continuous fuel sup-
ply. Deviations from the dosing constancy of + can be tolerated.
Deviations in the calorific value of coal dust and of the chemical composition are disadvan-
tageous. Disturbing components such as sulphur, chlorides and similar must be limited in their
portions. Where this is not possible, e.g. different coal types can be blended.
The required portion of primary air is about 10-14 % by volume of the entire combustion air
volume and is made up as follows:
A smaller volume of primary air is flowing via bores from duct 2 into duct 1 to form the oil spraying
cone and to cool the inner part of the burner mouth as well as the inner part of the inslide burner.
The air pressures in front of the nozzles (see section "Customer-specific characteristic and tech-
nical data / Primary air volumes") determine the velocities in the individual duct outlets. The
dependences are represented in the diagram of the primary air outlet speeds ("Performance dia-
gram primary air", see section "Customer-specific characteristic and technical data"). They are
approximately the following:
Due to the special arrangement of the burner outlet system, the fuel mixture is introduced into the
burning compartment such that, due to turbulences, re-circulation and the free jet effect, a good
mixture, a rapid ignition and a good combustion result.
The effect of the swirl air is that the coal dust, which is entering the burning compartment in a fun-
nel-shaped flow, is coming into contact with oxygen on the shortest possible way.
The negative pressure of up to 12 mbar in the whirl core generates a re-circulation. Hot gases
are flowing back to the flame starting point and stabilise the flame.
The flame shape in the rotary kiln can be influences by changing of the primary air volumes for
swirl air and jet air or of the pressures at the throttle flaps.
The flame shape can also be influenced by a variation of the nozzle outlet speed of the fuel mix-
ture (mostly coal dust). One option is to admix conveying air to the fuel transport air (coal dust
transport air) prior to entering the annular duct 3. The statical pressure of the additional convey-
ing air must always be higher than the statical pressure in the coal dust conveying line. If the sta-
tical pressure in the coal dust conveying line is higher than in the air supply line, the shut-off flap
between air line and coal dust conveying line must not be opened. When adjusting the throttle
flap, make sure that the velocity limits (for coal dust min. about 25 m/s and max. about 30 m/s)
are observed. Excessively low speeds will entail clogging by deposited coal dust or pulsations by
the "dune effect". Higher velocities favour the wear in the burner.
For major variations of oufflow velocities, order suitable nozzle plates or Jet nozzle inserts resp.
as special accessories.
During normal operation at a secondary air temperature of at least 800 C, the following inter-
relations are generally applicable.:
With a view to flame formation, the solid fuel types may have characteristics of their own.depen-
ding on the oufflow velocity.The optimal outflow velocity can be determined by tests during com-
missioning and operation.
For optimizing burner and /or flame shape. Also consider all essential kiln data.
These, in particular, are:
– gas resistances
The flame direction and the immersion depth of the burner in the kiln are adjusted according to
the operation conditions of the respective rotary kiln. The burner carrier to which the burner is
fastened permits the horizontal adjustment and the introduction or retraction, respectively, of the
burner into/from the kiln and turning it to either side by about 3°.
According to the movement possibilities of the burner, the supply lines are designed flexibly or
movable. Normally, the coal dust is pneumatically fed via telescopic pipes. Fuel oil, gas, swirl-
and jet air are supplied via flexible hose connections.
To avoid electrostatic charging of the burner, all coal dust carrying systems and supply lines are
grounded.
All coal dust conveying systems and the burner are of pressure-resistant design without pressure
relief for 10 bar. Hence, in case of an explosion, there is no risk of bursting, as the explosion
pressure in the closed vessel is 9 bar at a maximum
The control system is designed such that the fuel can be released, if previously the rated value
has been set to "0".
Triggering of the fuel distribution is realised such that the fuel supply upon starting is not automa-
tically released and, during normal operation, the fuel supply is automatically interrupted within
about 1 second and during starting within 5 seconds, if:
5. the waste gas blower (preheater blower) fails or the waste gas flap is closed
6. the limit values of O2 and CO, the firing compartment pressure or the waste gas tempera-
ture are exceeded
10. the burner or the burner lance were turned out or extracted
If the causes 1. to 11. have been eliminated, the burner can only be started manually.
Upon starting of the firing system after an operational failure, e.g. upon a power failure, coal dust
deposited in the transport system can enter the burner or the firing compartment without control.
Measures must be taken to avoid a deflagration or explosion, e.g. reducing the fuel oil volume (if
this should not be automatically set to "0" upon an operational failure) or increasing the O2- or
combustion air volume or running the system empty via inching operation at smallest speeds and
then starting the coal dosing system with the smallest volume.
Prior to starting the coal dust firing system, start the inslide burner.
Upon combined operation, only start with oil or gas. Prior to connecting the coal firing system, the
oil or gas volume is accordingly reduced or, depending on the kiln situation, the combustion air
volume increased. Such, the O2 portion of the waste gases is automatically increased.
If a burner failure was due to clogging of the coal dust conveying system, the conveying paths
must be cleaned before re-starting.
To ensure the necessary cooling of the burner by fresh air, in case of a black out or other distur-
bancies, operate the cooling air fan permanently with the emergency power supply.
The PYRO-JET burner is normally operated by hand, i.e. all connection-, ignition- and discon-
nection procedures as well the control of the burner performance are made or initiated manually.
The disconnection of the burner by the response of safety devices such as air lack control, CO-
max. limitation or flame monitoring systems can be considered an automatic procedure.
Requirement see under item 2.7 and information in chapter “Commissioning“, item 3.1.
The cold starting phase must be visually monitored and the fuel supply stopped in case of a
flame blow-off.
According to the experience made, the coal dust is not always free from foreign bodies. These
can cause operational failures, e.g.:
• Explosions by the generation of sparks or running hot of the conveying pump bearings or
seals.
Conveying ducts can clog in particular in the areas of changing cross sections. The increased
resistances cause failures in the dosing- and conveying system as well as damage to the seals.
In the clogged areas, an increased wear at the pipelines occurs due to the increased velocity and
formation of whirlings. The risk of explosion rises by possibly emerging coal dust.
Therefore, we recommend the installation of foreign body separators at the following points:
1. for the coal dust supply, in front of the conveying elements for silo feeding
Designation:
1 Nozzle Plate
2 Swirler
3 Coal dust nozzle
4 Coal dust tube outside
5 Coal dust tube inside
6 Support tube outside
BA 407-0797-04 en
Transport
Page 1 of 3
Contents Page
1 Packing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
3 Degree of decompositon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
BA 407-0797-04 en
4 Sensitivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
5 Paint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Previous edition:
6 Intermediate storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
7 Scope of supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1 Packing
The transport route is a factor in determining the type of packing used. Unless otherwise
specified or agreed in contract, Humboldt Wedag packing standards shall be used..
The symbols on the packing must be observed.
e.g.:
Alterations in this edition:
Page 2 of 3; BA 407-0797-04 en
Transport
2 Transport
For the transport, the burner is bolted to wooden girders and for sea transport packed in a box.
The openings, e.g. burner mouth and pipe connections, must be protected against the ingress of
foreign bodies and dirt with the aid of wooden discs.
Depending on the possibilities or the contractual agreements, loose hardware and pipelines must
be bundled or packed in boxes, special supply parts such as ignition burners, valves, switches,
fittings etc. must be standard-packed by the Humboldt Wedag suppliers; depending on the con-
tractual agreements, they are dispatched, as sea-worthy collective packing.
3 Degree of decompositon
The PYRO-JET burner is dispatched in assembled condition without refractory lining.
The refractory lining with anchoring must be mounted at the place of application prior to commis-
sioning.
4 Sensitivity
Be careful when tansporting the PYRO-JET burner to avoid damage due to the influence of force
or careless loading and unloading.
During transport, avoid the formation of condensed water due to high temperature deviations.
On the site, store the PYRO-JET burner and its accessories such that they are protected against
weather influences.
The PYRO-JET burner proper must be treated with the common care.
5 Paint
For the paintin, the respective order-related special regulations will apply. Otherwise, the burner
is delivered with a shop primer painting. The cover painting is made by the customer or a person
charged by him.
6 Intermediate storage
If the PYRO-JET burner is not mounted directly after its delivery, it must be carefully stored at a
protected place. It must be properly covered to avoid the entrance of dust and moisture.
The PYRO-JET burner is delivered with its blank parts preserved protecting these parts for about
1 year. If the storage should exceed this period, the preservation must be renewed (the preserva-
tion agent can be removed with a solvent)
Page 2 of 3; BA 407-0797-04 en
BA 407-0797-04 en; Page 3 of 3
Transport
7 Scope of supply
The contents of the packages is indicated in the package lists whose completeness must be
checked upon receipt.
Note!
BA 407-0797-05 en
Assembly
Page 1 of 4
Contents Page
1 General instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3 Erection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Previous edition:
1 General instructions
We strongly recommend to have erection and commissioning carried out by Humboldt
Wedag staff, as we shall not be liable for any damage due to improper and unqualified
workmanship.
Dimensions:
For erection and reconditioning of the PYRO-JET-burner, use a crane which can be moved
in all directions
Page 2 of 4; BA 407-0797-05 en
Assembly
3 Erection
Erection (installation) is done in accordance with the arrangement drawing.
The parts of the PYRO-JET-Burner provided with a special marking must be fitted by strictly
observing this marking
The PYRO-JET burner is ready for installation, except for the refractory lining. The connection
flanges and the burner mouth are closed to avoid the ingress of foreign bodies and dirt. The
locks must only be removed directly prior to mounting the connections.
The blank parts at the burner mouth which are accessible from the outside, in particular the air
ducts and nozzles, are freed from preservation agents with solvents.
The refractory lining and the pertaining fastening anchors must be mounted as directed in the
special working regulations and must be carefully treated. The following criteria must be fulfilled
and checked:
• At the front face, the mass must be uniformly compacted and the material thickness must
also be uniform. The edge must be sharp-edged without break-outs and with sufficiently
compacted mass.
• Uniform coloration of the surface (different coloration indicates the existence of moisture, oil
or grease of different qualities).
Caution!
It is recommended to perform the installation at a protected place, e.g. under the roofing of the
burner platform.
For a further storage, the burner must be covered with a PVC-foil or a canvas such that it is pro-
tected against rain, splash water and condensed water.
It must be stored on wooden beams which are cut out according to the round shape of the burner
(see fig. 407-005).
During the installation on the burner carrier, particularly save the refractory lining. It is recommen-
ded to mount near the centre of gravity a pre-shaped, about 3-5 mm thick and about 1 m long
sheet bandage (see Fig. 407-005).
Page 2 of 4; BA 407-0797-05 en
BA 407-0797-05 en; Page 3 of 4
Assembly
For in-plant transportation between workshop and burner plaftorm, it may be advisable to manuf-
acture a transport carriage (Fig. 407-006 refers).
The burner is fastened to the burner carrier by a plug-bolt connection and secured.
The insertion burner(s) is (are) slid into the carrier tube(s) and fastened.
– Measured in cold state, oil insertion burners are protruding by about 10 cm over the front
face of the burner mouth. Deviations of + 1.0 mm are tolerated.
– Gas insertion burners are ending flush with the front face of the burner mouth.
It must be checked, whether all nozzles and pipes in the mouth area are arranged concentrically.
A deviation of the width of the annular gap width of the coal dust nozzle of max. 1.5 mm is admis-
sible.
Note!
Therefore, the ducts of the burner and the pertaining lines must be kept absolutely clean during
the assembly. Upon completion of the assembly, for all lines and their connections, a pressure
check with the 1.5-fold of the operating pressure must be made. Leakages must be sealed.
A trial run with all blowers and compactors for at least 8 hours is recommended at fully opened
throttle flaps. The burner outlet system must be checked again. Possibly existing foreign bodies
must be removed. Here, dismantling of the outlet system may become necessary.
See respective references in chapter "Maintenance"
Assembly
The transport guard of the burner compensator must be removed after the installation and prior
to starting up of the burner (see fig. 407-008).
Fig. 407-007 Securing of axial expansion joints for transport or repair purposes.
Prior to commissioning:
1. Removal of Items 1+2 on site
2. Flange screws, lockwashers, washers and nuts fitted according to
assembly drawing - see Fig. 407-008
Caution!
Page 4 of 4; BA 407-0797-05 en
Technical Machinery Documentation State: 09.2012
BA 407-0797-06_R1 en
Commissioning
Page 1 of 8
Contents: Page
1 Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
BA 407-0797-06 en state: 12.2007
3 Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
3.4 Ignition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
3.5 Preconditions for operational readiness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
3.6 Start-up of burner equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
3.7 Setting data for burner equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
3.8 Adjustment of flame shape. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1 Instructions
The first starting up strongly influences the optimal operation of the PYRO-JET burner.
– the optimal performance and the respective operating data are determined,
– additional advice for the operation of the PYRO-JET burner, its maintenance and
repair is given.
Note!
Commissioning
3 Commissioning
Mainly, the following works must be performed during commissioning:
3. Trial run of all blowers and compactors over 8 hours at completely opened throttle flap.
4. Performance check of the blowers and compactors; measurements of the pressure deve-
lopment at the burner system and recording of the measured values.
5. Setting of the most favourable flame shape and alignment of the burner. The most favou-
rable flame shape and direction must be matched for every individual kiln considering the
respective operating conditions.
2.1 The max. pressure PAS ++ (preliminary rated value" 0.2 bar) must not be exceeded.
If it is exceeded during operation, after 1 second, the fuel supply is interrupted
(pipe clogging).
Page 2 of 8; BA 407-0797-06_R1 en
BA 407-0797-06_R1 en; Page 3 of 8
Commissioning
1. Setting of favourable relative velocities between air and fuel via the throttle flaps.
3. Changing the entering depth of the burner mouth into the rotary kiln.
5. Changing of the primary air temperature (if the respective facilities are existing).
1. Changing of the nozzle cross sections via nozzle change and, hence, changing of the out-
let velocity of air and fuel.
2. Changing of the flowing angle via nozzle change or adjustment of the nozzles and, hence,
influencing of the mixture of fuel and air.
7. Measures for reducing the entrance of dust with the secondary air.
9. Avoiding of serious accretions as well as of rings in the sintering zone by influencing the
physical and chemical properties of the burning material and of the fuels.
Commissioning
3.4 Ignition
With cold kiln, first the ignition burner must be ignited and only then oil or coal shall be fed.
With cold kiln, the flame must be monitored with a flame governor or by an especially charged
person.
In case of a flame blow-off, the fuel supply must immediately be stopped manually via emer-
gency-off keys.
Prior to every new fuel supply, the fire compartment must be sufficiently ventilated. Normally, an
air throughput rate is sufficient which corresponds to the double volume of the burning compart-
ment and of the preheater.
To reduce the risk of deflagration, during the rinsing-/ignition time, the risk of deflagration must
be reduced by disconnecting the high voltage and rapping gears of the electrical waste gas
dedusting systems. The spray electrodes must be grounded.
After a heating up time of at least 4 hours, the ignition burner can be shut down (if the flame does
not blow off).
The temperature of the bricklining and of the burning material shall be higher than 800°C. Pos-
sibly, the kiln must be "tilted" prior to the ignition so that new hot surfaces of bricklining and bur-
ning material are generated.
Caution!
4. The coal dust conveying systems are cleaned, free from coal dust and ready for operation.
5. Fuels are available, the operational safety is ensured, negative pressure in the kiln head is
existing.
Page 4 of 8; BA 407-0797-06_R1 en
BA 407-0797-06_R1 en; Page 5 of 8
Commissioning
Air volume data as per section "Customer-specific characteristic and technical data".
Observe the performance diagrams and characteristic lines of the primary air generator and of
the flowing out speeds, see section "Customer-specific characteristic and technical data".
1. With cold rotary kiln, start with oil/gas. The waste gas fans must be controlled such that
always sufficient combustion air is available. In the kiln head, a pressure must establish
permitting without any problem the electrical ignition or the ignition via slow match wick,
depending on the design. Normally, this is the case at a pressure of about -0.1 to -0.3 bar.
2. Ignition only with twist air at about 10-30 % air (flap position about 1-2) After the ignition,
the twist air is increased to about 50% (flap position about 4) and during heating up, jet air
for cooling the nozzle disc is added, about 10% (flap position about 2).
3. After heating up of the kiln and starting production, the system is converted by steps from
oil/gas to coal dust as fuel. After the reduction of oil-/gas fuel, start with a coal dust feed
volume which meets about 10% of the heat requirement.
4. Prior to connecting the coal dust dosing system, at the kiln inlet, an additional oxygen
excess volume must be available which is by 2-3% higher than normally.
5. Matched to the operating conditions of the kiln system, the coal dust volume is increased
by small steps, the oil volume accordingly reduced, until the desired ratio of coal dust to oil
is reached.
6. During normal operation, a secondary air temperature of 800° to 900° must be maintained
to ensure an optimal combustion.
7. During operation, a minimal jet- and twist air volume of about 10-20%, each, must not be
fallen below to always ensure a sufficient cooling of the burner outlet system.
8. The procedure for re-starting of the burner after an operation interruption depends on the
temperature in the kiln. If the temperature is still high enough and even short heating up is
not necessary, the system can immediately be continued to be run at the desired coal
ratio.
If the kiln temperature is too low, the system must be heated up and the coal dust volume
be increased by steps.
Commissioning
Caution!
Caution!
Starting sequence:
1. Swirl air fan "switch on"
Swirl air damper No. 2 "open" - approx. 10-30 %
Swirl air damper No. 3 "closed"
Emergency cooling damper No. 4 "closed"
2. Conveying air blower "off"
(pneumatic conveyor )
3. Jet-air blower "off"
Jet air damper No. 4.1 "closed"
Jet air damper No. 4.2 “closed"
Stepwise increase the throughput volume of flap 4.2 and simultaneously throttle the throughput
rate of flap 1, until flap 4.2 is loaded by 100%.
Page 6 of 8; BA 407-0797-06_R1 en
BA 407-0797-06_R1 en; Page 7 of 8
Commissioning
The flame shape can also be adjusted by varying the oufflow velocity in the coal dust nozzle. If
required, additional conveying air can be added to the coal dust conveying air prior to entering
the annular duct (see also "Design and Functioning", item 2.5)
Commissioning
The pressure gauges located at various measuring points of firing plant, have been equipped
with cocks. For taking the pressure readings, these must be opened and afterwards closed
again. This will ensure a longer life. This especially applies the pressure gauge of the coal dust-
duct. The shut-off cocks must only be set to two positions (according to the symbols at the stop-
cock). Other positioning results in wrong measurements ( see Fig. 407-010)
In case of incorrect cock positioning, the connection hose at the coal dust duct leading up to the
pressure gauge, is clogged with coal, as in this context, coal dust-laden air will always escape
through the blow-off opening. For cleaning, this connection hose must be withdrawn from the
nipple and blown free with the aid of compressed air.
Caution!
Never inject compressed air at the check cock (in horizontal posi-
tion), as this may imply danger to damage the pressure switch .
Page 8 of 8; BA 407-0797-06_R1 en
Technical Machinery Documentation State: 09.2016
BA 407-0797-07_R1 en
Operation
Page 1 of 3
Contents: Page
1 Normal operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
BA 407-0797-07 en State: 12.2007
3 Operational safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
4 Elimination of failures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Previous edition:
1 Normal operation
There is no difference between normal starting of the PYRO-JET- burner and the proce-
dure described in chapter "Commissioning".
For operation of accessory equipment, please refer to the documentation included in the
section “List of separate documentation“.
4. Swirl air fan should be on DG set when main power fails, it continue to run for coo-
ling purpose.
5. Pneumatic valve which is in primary air distributor should be fully closed when get-
ting power from main supply However, main suply fail, this valve should be open so
that the swirl air can be passed to jet air channel. Again when main power come
back, this valve must be in closed condition without failing.
6. Cool the burner lance with primary air during the shutdown procedures.
a) If the burner lance is not withdrawn from the kiln head, cooling can be stop-
ped as soon as the kiln has cooled down to approx. 500° C.
Alterations in this edition:
b) If the burner lance is withdrawn from the kiln head. cooling has to be stopped
shortly before the burner lance has been completely withdrawn from the kiln
head.
Caution!
When taking out the burner lance, make sure that the bur-
ner lance seal at the kiln head is not damaged, e.g. by coa-
tings on the refractory lining or a distortion in the pipe or
by the positon of the burner lance!
Page 2 of 3; BA 407-0797-07_R1 en
Operation
3 Operational safety
4 Elimination of failures
4.4 Partial burning of flame on 1. Foreign matter in coal Replace foreign matter
one side dust outlet duct or coal
dust nozzle
Page 2 of 3; BA 407-0797-07_R1 en
BA 407-0797-07_R1 en; Page 3 of 3
Operation
4.5 As by 4.1 to 4.4 1. Outer tube of duct 3 Replace or repair for sealing
Wear of Jet-nozzles hole worn out, depending on defective tubes (provisional
pressure conditions,coal remedy by way of pressure
dust enters duct 4 or Jet balancing )
- air duct 3
4.6 As by 4.1 to 4.4 1. Inner tube of duct 3 See 4.5 above
Wear of swirl elements worn-down, dependin-
gon pressure conditions
coal dust enters duct 2
or swirl air duct 3
4.7 Failures in pneumatic coal 1. Ccoal dust too wet See operation manual for
dust conveying coal dust conveying system
In case of total pipe clogging of coal dust-conveying pipes, dismantle pipes and empty clogged
pipe sections.
Also clean the dosing unit and existing connections at dedusting equipment.
At the beginning point of clogging, find out the cause in the relevant pipe section, remove foreign
matter, if any, and replace worn-down parts.
Caution!
Major amounts of coal dust must not be stored in open air, since this
may imply a self-inition danger.
Remove them using a vacuum cleaner.
BA 407-0797-08_R1 en
Maintenance
Page 1 of 13
Contents Page
1.1 Instructions
To avoid production losses which could occur during required maintenance and reconditio-
ning work on the PYRO-JET-burner, we strongly recommend to hold a complete PYRO-
JET-standby burner in reserve.
Due to the varying operating conditions, it cannot be determined in advance, at what inter-
vals a wear check, inspection, maintenance and reconditioning must be carried out. A sui-
table inspection routine should be determined in due consideration of the locally prevailing
operating conditions.
At regular intervals, which are governed by the coal dust's abrasive behaviour, the wall
thicknesses of the coal dust conveying lines should be checked, e.g. using ultrasonic
measuring equipment.
Maintenance
– Pipes and flanged connections must be checked for tightness within the scope of
inspection routine
Burner inspection and servicing is carried out during a plant standstill. To that end, the burner
must be taken out of the kiln head.
(See chapter "Operation", item 2, Section 4 b)
Checks of pipes and ducts for foreign matter eliminatie foreign matter
Check of swirl element for wear check of swirl element for wear
Check of inner coal dust nozzle for wear depending on wear state:
a) repair by hardfacing
b) replace inner coal dust nozzle
Check outer coal dust outlet surface for wear replace worn-down nozzle element
Check of lined bends of the coal dust convey- repair defective spots
ing pipes for wear
Maintenance
Upon standstill of the kiln plant after an extended operation period ( more than 3 months of con-
tinuous operation), or if there are signs indicating that operational failures or serious damage to
the burner can be expected in the near future (e.g. state of refractory lining ), the burner must be
replaced by the burner held in reserve .
Regarding inspection and maintenance of accessory equipment, such as fans, rotary piston blo-
wer, fittings, etc., included in our scope of supply, the maintenance and operating instructions
included in the section "List of separate documentation" must be observed.
The firing plant must be inspected at least once per year by a supervisor of the user.
2.1 Instructions
For identification and items, see chapter "Design and Functioning", item "Identification of burner
components" and the attached burner drawing under section "List of documentation und spare
parts drawings".
Prior to start of reconditioning work, it must be made sure that all required spare parts are avai-
lable.
The reconditiong work described below are to be carried out after the burner has been withdrawn
from the kiln head and cooled down .
Depending on kind and place for burner reconditioning work, it may be required to
• retract the insertion burners or to completely take them out of the burner
• dismantle supply lines, such as hoses, flexible connections, telescopic tubes etc.
Note!
1. Fix the pre-stressed axial expansion joint (12.2). To that end remove several opposite
arranged flange screws from the connection flange of burner carrier tube (12.1) and the end
flange of duct 4. At these places threaded bolts of corresponding length with thread on both
sides and nuts must be screwed in between the flanges. It is advisable to measure the
flange distance of the pre-stressed expansion joint and to note it for reassembly.
Maintenance
2. Cut-off the weld with whitch the outer ring of the nozzle plate (12.6) is welded to burner car-
rier tube (12.1), (see point A of burner drawing) with a carbon electrode or a cutting-off disc.
Caution!
3. Separate supporting tube at least 200 mm behind the end so that there is no access any
more to the coal dust pipe (12.3).
4. Separate coal dust pipe (12.3) at a certain distance behind the weld seam and withdraw
nozzle disc (12.6).
Caution!
5. Equalize separation point at the remaining pipe ends (12.3 + 12.1) correctly and rectangu-
larly to the pipe axis and place a weld seam.
7. Weld new nozzle disc (12.6) to remaining coal dust pipe (12.3). To that end, first tack-weld
nozzle disc crosswise over the circumference and then weld it in place.
Caution!
Check and make sure that the nozzle disc is exactly welded con-
centrically and coaxially.
8. Weld spare pipe element to the remaining burner supporting pipe (12.1). Then, weld it to
the nozzle disc (12.6) in its front area. Here, use the electrode type indicated in the drawing.
Caution!
Make sure that the weld seams between the individual ducts are
tight. Perform tightness check with 1.5-fold operating pressure.
For that purpose, the nozzle openings must be closed and a
check performed with leakage spray or soap solution.
9. Mount support tube (12.1) with refractory lining again and fasten it.
Maintenance
11. Remove fixing of axial expansion joint again and mount flange bolts.
Caution!
When the fixing of the axial expansion joint is not removed, the
burner can be destroyed during operation.
1. Unscrew inner coal dust nozzle (12.7) from the inner nozzle pipe using the burner nozzle
key included in the supply. The burner nozzle key must be positioned in the provided ope-
nings which must previously be cleaned.
2. Clean thread and front face of the inner nozzle pipe (12.4.1)
4. Remove preservation painting of the inner spare coal dust nozzle (12.7). Clean thread and
sealing surface.
5. Grease thread of the inner coal dust nozzle (12.7) and of the inner nozzle pipe (12.4.1) with
heat-resistant lubricant (e.g. Anti-Seize).
6. Apply heat-resistant special sealant (e.g. WEVOPAT) to the sealing surface of the inner
coal dust nozzle (12.7) and the front face of the inner nozzle pipe (12.4.1).
7. Bolt inner coal dust nozzle (12.7) into the inner nozzle pipe (12.4.1) and tighten it.
1. Unfix the two screws of the twist body (12.8) and withdraw twist body.
The insertion burners must always be dismantled before starting dismantling of the burner tubes
(12.1/12.3/12.4/12.5) and of the axial expansion joint (12.2).
Maintenance
2.6 Dismantling and installing of carrier tube for insertion burners (12.5)
4. Withdraw carrier tube set (12.5) from the inner burner tube (12.4).
6. Check inner burner tube (12.4) internally for deposits and contaminations. Clean it, if
necessary.
9. Insert some bolts into the end flange of the inner burner tube (12.4) and suspend sealing
(12.11).
10. Slide carrier tube set (12.5) into the inner burner tube (12.4)
Caution!
Prior to inserting the carrier tube set (12.5), check inner burner tube (12.4) for
left objects such as tools, cleaning rags etc.
Caution!
12. Check swirl element (12.8) for wear and, depending on its condition, re-use or replace it.
(See 2.4, Items 2 to 6)
Maintenance
Prior to dismantling the inner burner tube (12.4), mark the installa-
tion position at the end flange of duct 3.
4. Withdraw inner burner tube (12.4) by about 2.5 m form the coal dust tube (12.3).
5. Grind tack weld spots from the tube half shells with ceramic wear protection at the end
flange of the coal dust tube (12.3) and dismantle tube half shells.
Caution!
6. Completely withdraw inner burner tube (12.4) from the coal dust tube (12.3).
7. As required:
8. Check coal dust tube internally for deposits and contaminations. Clean, if necessary.
11. Insert some bolts into the end flange of the coal dust tube (12.3) and suspend sealing
(12.10).
12. Slide inner burner tube (12.4) into the coal dust tube (12.3) up to a distance of about 2.5 m
between the end flanges.
Caution!
Prior to inserting the inner burner tube (12.4), check coal dust
tube (12.3) for left objects such as tools, cleaning rags etc.
Maintenance
13. Install tube half shells with ceramic lining into the coal dust tube (12.3) and tack-weld them
at the end flange of the coal dust tube (12.3). Observe marking of the installation position of
the tube half shells.
14. Completely slide inner burner tube (12.4) into the coal dust tube (12.3).
Caution!
Caution!
16. Check inner coal dust nozzle (12.7) for wear and, depending on its condition, re-use or
replace it.
(see 2.3, Items 3 to 7)
17. Further procedure or assembly of the burner as per 2.6, Items 6 to 13.
Maintenance
Prior to dismantling the coal dust tube (12.3), mark the installation
position at the end flange of the burner carrier tube (12.1) and at
the end flange of duct 4 (if necessary, with intermediate marking
at the axial compensator (12.2).
2. Unscrew bolts of the flange connection between burner carrier tube (12.1) and axial com-
pensator (12.2).
Caution!
3. Withdraw coal dust tube (12.3) - connected with the coal dust connection socket - together
with the axial compensator (12.2) from the burner carrier tube (12.1).
5. Check burner carrier tube (12.1) internally for deposits and contaminations; clean, if
required.
6. Clean sealing surfaces of the flange connection between burner carrier tube (12.1) and
axial compensator (12.2).
8. Insert some bolts into the flange of the burner carrier tube (12.1) and suspend seal (12.9).
9. Insert coal dust tube (12.3) with axial compensator (12.2) into the burner carrier tube (12.1).
Caution!
Prior to inserting the coal dust tube (12.3), check burner carrier
tube (12.1) for left objects such as tools, cleaning rags etc.
Maintenance
Caution!
12. Further procedure or assembly of the burner as per 2.7, Items 8 to 17.
2. Unscrew bolts at the end flange of duct 4 and withdraw axial compensator (12.2) over the
coal dust tube (12.3.
4. Clean sealing surfaces at the end flange of duct 4 and of the axial compensator (12.2).
6. Insert some bolts into the end flange of duct 4 and suspend seal (12.9).
7. Slide axial compensator (12.2) over the coal dust tube (12.3).
8. When installing a new or not pre-stressed axial compensator (12.2), it must be pre-stressed
with the aid of threaded bolts (see 2.2, Item 2).
Caution!
10. Further procedure or assembly of the burner as per 2.8, Items 8 to 12.
Caution!
Maintenance
2. Separate inner nozzle pipe (12.4.1) adjacent to the weld seam (abt. 30 mm) at the inner
burner tube (12.4).
Caution!
Spare parts for the inner nozzle pipe (12.4.1) are supplied at diffe-
rent lengths to balance the separations at the inner burner tube
(12.4). Therefore, when ordering spare parts, always indicate
which length or renewal stage is desired.
The inner nozzle pipe including the supporting and guide ribs is
surface-treated and must not be re-worked upon installation. The
exact position of the separation point must be matched to the
spare part so that outlet parts of the assembled burners are
ending flush.
(See 2.14, Item 2).
3. Precisely equalise separating point at the remaining inner burner tube (12.4) rectangularly
to the tube axis and provide it with a weld seam chamfer.
4. Weld new inner nozzle pipe (12.4.1) to the remaining burner tube (12.4). To that end, first
crosswise tack-weld the inner nozzle pipe (12.4.1) at some points over the circumference
and then weld into place.
Caution!
Observe and make sure that the inner nozzle pipe spare part
(12.4.1) is carefully welded in concentrically and coaxially.
4. Precisely equalise separating point at the remaining burner carrier tube (12.1) rectangularly
to the tube axis and provide it with a weld seam chamfer.
5. Balance the reduction of the burner supporting pipe by the installation of a pipe element of
suitable new length.
6. Weld spare tube element to the remaining burner carrier tube (12.1).
Caution!
Maintenance
2. Heat up worn down ceramic residues on the inner burner tube (12.4) and in the tube half
shells (12.3.5) and remove them with a spatula.
Caution!
4. Apply a thin layer of a special ceramic glue (e.g. Weicon Silicon Type HAT 300) to the
gluing surfaces using a toothed spatula.
Caution!
5. Immerse ceramic plates, which are glued onto a foil with their top sides, into the applied
adhesive surfaces. Have them dry or set for 24 hours.
Caution!
The ceramic plates must be laid diagonally to the tube axis on the
inner burner tube (12.4).
The ceramic plates in the tube half shell must be laid in parallel or
rectangularly to the tube axis.
6. After setting of the glued areas, the foils must be carefully removed from the surfaces of the
ceramic plates.
Caution!
Foils which have not been removed, will become loose during
operation and can lead to cloggings of the coal dust nozzle.
Maintenance
Beyond the specified checks described with the working steps, the following checks are neces-
sary:
1. All parts of the outlet system of the burner mouth must be concentrically arranged. In case
of differences of >1.5 mm of the annular gap of the coal dust nozzle, corrections are neces-
sary, e.g. by replacing the inner nozzle pipe.
2. The front faces of all parts of the outlet system must end flush in one plain. Tolerances of +/
- 1 mm are admissible.
Only the oil insertion burner is protruding by 10 mm +/- 1 mm with cold burner.
3. All ducts must be free from foreign bodies and contaminations, as this could lead to clog-
gings during operation.
The specified checks should suitably be made during the respective repair working steps to
avoid that the completely assembled burner must be dismantled again for necessary corrections.
After completion of the repairs or the respective repair steps, all burner openings must be closed
to avoid the entrance of foreign bodies and dirt.
If the overhauled burner is stored e.g. as spare burner, suitably protect it (also see references
under "Assembly, Item 3.1).
Prior to starting up the overhauled and connected burner, a trial run with all blowers and compac-
tors is recommended for at least 8 hours with fully opened throttle flaps (see references under
"Assembly"., Item 3.1).
Otherwise, the PYRO-JET burner can be maintained and repaired with the standard tools of a
maintenance workshop.
BA 407-0797-09 en
Spare parts keeping and
after sales service Page 1 of 2
Contents
Availability of the most essential spare and wear parts at the place of installation is an
Previous edition:
For ordering spare parts, please use the spare parts lists.
The spare parts drawings listed in the spare parts list are meant to provide further informa-
tion.
In case of installing and fitting spare parts and auxiliary equipment other than those deli-
vered by us, the warranty of Humboldt Wedag will be invalidated. Please consider that
often special manufacture and delivery specifications exist for in-plant manufactured parts
and parts of third-party firms and that spare parts, which always meet the latest state of
technology and the most recent legislative regulations are offered by us.
Note!
Alterations in this edition:
Page 2 of 2; BA 407-0797-09 en
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Section – III B
Operating Instructions –
Burner Carriage, standing
(BA 407-0753_R1 en)
State : 06.2020
Technical Machinery Documentation State: 09.2012
* Field of application
* Copyright
BA 407-0753-01 en
General
Page 1 of 3
Contents Page
1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3 Field of application. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4 Copyright . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Previous edition:
1 Introduction
These information are meant to be read and observed in all items by those being respon-
sible for the Humboldt Wedag-burner carriage.
The complete technical documentation must always be kept near the burner carriage.
Details of particular importance for the use of the burner carriage are pointed out in the
operating instructions.
Only the knowledge of the present operating instructions (BA) may ensure a trouble-free
operation of the burner carriage. Therefore, it is very important that these operating
instructions are really known to the persons in charge.
We recommend to carefully study the present instructions as the manufacturer will not be
liable for damage and operational failures resulting from the non-observance of these
instructions.
The firing plant must only be assembled, serviced and operated by suitably trained and
qualified staff.
If, nevertheless, problems should occur during operation, please contact our after sales
service or the spare parts department or one of our agencies. They will be readily pre-
pared to assist you (refer to chapter " Spare parts keeping and after-sales service").
The present operating instructions exclusively refer to the burner carriage.
We reserve the right to make technical changes necessary for improving the butt
stripping machine which are deviating from the descriptions and data given in these
operating instructions.
Alterations in this edition:
BA 407-0753-01 en
General
Caution!
This reference appears anywhere in the present BA where features of
particular importance must be observed to follow the regulations,
directives, information or the correct course of the works and to avoid
damage to or the destruction of the equipment and/or other plant sec-
tions.
2.3 Information
Note!
This reference draws your attention to general operating information
which must be particularly observed.
This symbol will appear near all safety information in the present ope-
rating instructions (BA), where due to the influence of noise, hearing
defects may occur. Observe this information and absolutely wear your
personal protection aids, e.g. ear protection.
Page 2 of 3
BA 407-0753-01 en
General
3 Field of application
Caution!
The burner carriage has only been designed for the field of application indi-
cated in section "Customer-specific characteristic and technical data/Field of
application".
Prior to using the burner carriage beyond the contractually stipulated field of
application (see secton "Customer-specific characteristic and technical data/
Field of application"), consult the after-sales service of the Humboldt Wedag
(address as per section "Spare parts keeping and after-sales service" as,
otherwise, a warranty will not be given
4 Copyright
The copyright to the present operating instructions (BA) remains with the Humboldt Wedag. The
instructions are meant for the installation, operating and supervision staff. They contain regulations
and drawings of technical nature which must not - nor in whole nor partly - be distributed or used wit-
hout authorization for competition purposes or disclosed to others unless this has not been expres-
sedly approved. A non-observance will entail damages.
Humboldt Wedag
http:/www.khd.com
Page 3 of 3
Technical Machinery Documentation State: 05.2011
BA 407-0753-02 en
Safety and Health
Page 1 of 4
Contents Page
2. Safety information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.1 General safety information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Previous edition:
3. Proper use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Caution!
This reference appears anywhere in the present BA where
features of particular importance must be observed to fol-
low the regulations, directives, information or the correct
course of the works and to avoid damage to or the destruc-
tion of the machine and/or other plant sections.
Alterations in this edition:
1.3 Information
Note!
This reference draws your attention to general operating
information which must be particularly observed.
BA 407-0753-02 en
This symbol will appear near all safety information in the present ope-
rating instructions (BA), where due to the influence of noise, hearing
defects may occur. Observe this information and absolutely wear your
personal protection aids, e.g. ear protection.
2. Safety information
• The burner carriage burner has been constructed according to the approved technical rules
and regulations and is operationally safe. However, this machine can entail risks, if it is impro-
perly operated by unskilled staff or is used in another way than directed or commissioned or
operated not observing the instructions given.
• No working method is permitted which could affect the safety of the burner carriage or jeopar-
dise the staff.
• By suitable instructions and checks, the user must ensure cleanliness and clearness of the
working place at the burner carriage.
• Unauthorised conversions and changes affecting the safety of the burner carriage are not per-
mitted.
• All repair works at the burner carriage must generally be made with the system standing still
and cooled down.
• Generally, for the installation and operation of the burner carriage, the applicable legal regulati-
ons and directives must be observed, in particular the accident prevention regulations for firing
systems.
Page 2 of 4
BA 407-0753-02 en
• The burner carriage must be operated, maintained and repaired exclusively by authorised, trai-
ned and skilled staff. This staff must have been given a special training by the respective per-
son in charge as regards possible dangers.
• Every person who, on the premises of the user, is in charge of assembly, dismantling, re-
assembly, operation and maintenance (inspection, maintenance, repairs) of the burner carriage
must have read and understood the complete operating instructions and, in particular, the
chapter "Safety and Health".
Caution!
The operator is recommended to have this confirmed in writing in every
individual case.
• The operating staff is obliged to notify without delay any changes noticed at the burner carriage
affecting the safety.
• The operator must oblige himself to always keep the burner carriage in a proper condition and
to operate it in a safe condition.
• The burner carriage can entail risks for the staff due to improper operation, maintenance and
conversion:
Page 3 of 4
BA 407-0753-02 en
• Prior to starting the works, the drives and auxiliary devices must be secured against unintended
connection. This is possible with a lockable local switch.
• The working instruction for isolating or closing the main fuse must be given in writing and must
be signed by the responsible electrician after the completion of the works.
• Prior to starting after repair works, check, whether all protective devices have been mounted
again.
• The carrying capacity of the lifting facilities must at leas correspond to the weight of the burner.
• Only suitable and properly functioning lifting facilities are permitted to be used.
• After the electric installation or repairs to the electric system, the protective measures applied
must be tested (e.g. earthing resistance).
• All warnings at the burner carriage must completely be kept in a legible condition.
• Only use genuine spare parts as these meet the requirements of the manufacturer. When using
other spare parts, there will be no liability from our side.
• All works on the burner carriage must generally be performed upon a standstill in cold and
secured state.
• During operation, protective devices of the machine must be in the protecting position as direc-
ted.
Note!
In addition, the safety references in the enclosed documentations of
the suppliers must be observed.
3. Proper use
• The burner carriage is only permitted to be operated under the conditions laid down in the
"Technical data/Field of application". Any use beyond this is considered not as directed. The
manufacturer will not be liable for resulting damage, the risk will be borne by the user alone.
• The proper use also includes the observation of the conditions for assembly, dismantling and
re-assembly, commissioning, operation and repairs as well as of further regulations of the Tech-
nical Documentation.
Page 4 of 4
Technical Machinery Documentation State: 09.2012
BA 407-0753-03_R1 en
Design and functioning
Page 1 of 2
Contents Page
1 Functioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
BA 407-0753-03 en State: 05.2011
2 Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Previous edition:
1 Functioning
The burner carriage serves for accommodating and adjusting the burner. The position of
the burner mouth and of the flame in the rotary tube is of utmost importance for the burning
procedure (see burner documentation).
With the burner carriage and the pertaining adjusting devices, the burner can be rapidly
and at any time brought into various positions for operation and maintenance.
For the adjustment in axial direction as well turning in the horizontal and vertical plain,
electrical, pneumatical or manually operated travelling and lifting devices are available.
In case of a power supply failure, the burner can be moved out of the burning compartment
via manually operated emergency systems arranged at the burner carriage.
Caution!
Manual operating means are only permitted to be mounted
in cases of emergency and must absolutely be removed
prior to motorised operation.
The burner carrier or the burner carriage can be designed for being moved at the kiln head
suspended to a rail or running on rails on the burner platform.
The opening at the kiln head must be sufficiently large according to the maximal turning
path and the maximally extracted operating position of the burner. For burner carriages
running on rails, the torque generated by the largely protruding burner is balanced by
counterweights on the burner carriage and, in this way, tilting of the burner carriage is avo-
ided.
When dimensioning the counterweights, consider accretions on the burner and, in particu-
lar cases, product accretions falling from the rotary kiln onto the burner mouth.
If necessary, in operating position, the burner carriage can be equipped with a resilient
Alterations in this edition:
fastening system.
In particular cases, primary air fan, fittings and ignition devices can be installed on the bur-
ner carriage.
The supply systems of current, air and fuel are of flexible design to permit the easy activa-
tion of the control units on the burner carriage.
BA 407-0753-03 en
2 Design
The burner carriage is predominantly of welded design and comprises the following main compon-
ents:
33.56 2 Bolt
Note!
The data refer to the documentation drawing "Burner carriage" in
section "List of the documentation and spare parts drawings".
Page 2 of 2
Technical Machinery Documentation State: 05.2011
BA 407-0753-04 en
Transport
Page 1 of 2
Contents Page
1 Packing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
3 Sensitivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
4 Paint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Previous edition:
5 Intermediate storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
6 Scope of supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1 Packing
The transport route is a factor in determining the type of packing used. Unless otherwise
specified or agreed in contract, Humboldt Wedag packing standards shall be used..
e.g.:
Alterations in this edition:
BA 407-0753-04 en
Transport
2 Transport
The burner carriage is transported in mounted condition without counter weight, burner etc.
The parts are packed as far as required
3 Sensitivity
The burner carriage should be transported carefully to avoid damage due to influence or force or
uncareful loading and unloading.
During transportation, avoid a formation of condensation water due to major temperature fluctuati-
ons.
On site, store the burner carriage and the accessory equipment at a weatherproof place.
4 Paint
The paint is subject to the relevant special order-specific provisions. Otherwlse, the burner is delive-
red with a shop-primer coat. The top coat is applied by the customer or his authorized representati-
ves.
The repair and finish painting will be applied ont he site by the customer or his authorized represen-
tative.
5 Intermediate storage
If the burner carriage is not mounted directly after delivery, it must be carefully stored in a protected
place . It must be properly coated to avoid penetration of dust and moisture.
The burner carriage is delivered with a preservation for the blank metal parts, which shall protect the
parts for approximately 1 year . In case of an intermediate storage beyond this period, preservation
will be necessary again . (The preservation can be taken off by a solvent).
6 Scope of supply
The contents of the packages is indicated in the package lists whose completeness must be chek-
ked upon receipt.
Any damage must be notified to the forwarding agent as well as to the supplier. A copy of that noti-
fication is submitted to the Humboldt Wedag GmbH.
Page 2 of 2
Technical Machinery Documentation State: 05.2011
BA 407-0753-05 en
Assembly
Page 1 of 2
Contents Page
1 General instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Previous edition:
1 General instructions
We strongly recommend to have erection and commissioning carried out by Humboldt
Wedag staff, as we shall not be liable for any damage due to improper and unqualified
workmanship.
The burner carriage is delivered in assembled state (see chapter "Transport ").
2 Assembly
The erection of the burner carriage, the drive and the protective hood must take place duly
observing the accident prevention regulations and the general erection rules for fitters and
electricians.
The burner carriage is assembled on the site observing the data given in the parts lists and
in the machine assembly drawing.
(Delivery state see chapter “Transport“).
If motor, coupling and protective hood have been delivered unpacked, the pillow block fra-
mes and the drive motor are aligned with the aid of shims and a feeler gauge.
When installing the travelling rails, ensure correct alignment to guarantee easy movement
of the burner carriage.
To avoid that the service life of the chain is affected, take care when installing the geared
motor that the chain sprockets are precisely flush-mounted and the chain is correctly ten-
sioned.
Note!
Observe the pertaining sub-suppliers documentation (see
section “List of separate documentation“).
Alterations in this edition:
BA 407-0753-05 en
Assembly
Prior to trial operation at the end of the erection and trial operation without material, check again the
following points:
1. Is the oil volume in the geared motor sufficient and is the venting hood open?
3. Is the system ready for operation, have foreign parts been removed from the running surfaces
and connections unfixed? Are all flexible parts freely movable?
4. Have all regulations of the geared motor and special documentation been observed?
8. Has the motor been correctly connected as indicated on the nameplate?Have the travel limi-
ting and range switches been correctly mounted?
Caution!
Is the SENSE OF ROTATION correct compared with the indication in the
keys? If not, change poles !
Page 2 of 2
Technical Machinery Documentation State: 05.2011
BA 407-0753-06 en
Commissioning
Page 1 of 1
Contents: Page
1 Operation at the end of the erection and trial operation without material . . . . . . . . . . . . . 1
2 Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Prior to trial operation at the end of the erection and trial operation without material, check
again the following points:
1. Is the oil volume in the geared motor sufficient and is the venting hood open?
3. Is the system ready for operation, have foreign parts been removed from the run-
ning surfaces and connections unfixed? Are all flexible parts freely movable?
4. Have all regulations of the geared motor and special documentation been obser-
ved?
Caution!
Is the SENSE OF ROTATION correct compared with the indication
in the keys? If not, change poles !
10. Have the counter weights been correctly tared? Consider loads onto the burner
caused by accretion.
2 Commissioning
After these check works and after having checked the electrical interlocking, operation
Alterations in this edition:
may be started.
Check current consumption, travelling speed etc. Enter readings into the report and the
operating instructions.
Caution!
Prior to turning the burner, unfix the catching device. Immediately
after termination of the adjusting works, that device must be
adapted to the burner with minimum gap.
Technical Machinery Documentation State: 05.2011
BA 407-0753-07 en
Operation
Page 1 of 1
Contents:
BA 407-0753-08 en
Maintenance
Page 1 of 2
Contents Page
Note!
“Documentation drawing burner carriage“ see section
“List of documentation and spare parts drawings“.
Inspection Measuring
Machine part Inspection
interval instrument
Maintenance
Maintenance
Machine part Maintenance
interval
Coupling
Screws Re-tighten
Limit switch
Page 2 of 2
Technical Machinery Documentation State: 05.2011
BA 407-0753-09 en
Spare parts keeping and
Page 1 of 2
after sales service
Contents
For ordering spare parts, please use the spare parts lists.
The spare parts drawings listed in the spare parts list are meant to provide further informa-
tion.
In case of installing and fitting spare parts and auxiliary equipment other than those deli-
vered by us, the warranty ofHumboldt Wedag GmbH will be invalidated. Please consider
that often special manufacture and delivery specifications exist for in-plant manufactured
parts and parts of third-party firms and that spare parts, which always meet the latest state
of technology and the most recent legislative regulations are offered by us.
Note!
Alterations in this edition:
Page 2 of 2
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Section – III C
Operating Instructions –
State : 06.2020
Operating Manual
BA 822 - 0001 en
Handling
of
Lubricants
State: 11.2010
Technical Machine Documentation State: 11.2010
General BA 822-0001-01 en
Page 1 of 3
Contents Page
1. Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2. Copyright . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
BA 822-0001 en
4. Lubricant selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Introduction
This operating manual is applicable in case larger amounts of lubricants are transported to
and stored on a Humboldt Wedag site. At the same time it is meant to provide a support in
the handling of lubricants.
2. Copyright
Copyright existing on this operating manual (BA) remains the property of Humboldt Wedag
GmbH. This manual is intended for the use by erection-, operating- and supervisory
personnel. It contains regulations, information and instructions.
Alterations in this edition:
Page 2 of 3; BA 822-0001-01 en
General
When ordering lubricants, the most suitable container type must be provided. The container
types and -sizes are dependent on the quantity required per lubricant type.
Distinction has to be made between:
• containers for lubricating oils and
• containers for lubricating greases.
Examples:
Drums which can be reconditioned offer the possibility of multiple use, which lowers disposal
costs and diminishes environmental nuisance caused by waste.
Page 2 of 3; BA 822-0001-01 en
BA 822-0001-01 en; Page 3 of 3
General
4. Lubricant selection
In each case of application the lubricant has to meet a number of individual requirements.
Decisive for the selection of a lubricant are
Safety BA 822-0001-02 en
Page 1 of 2
1. Safety instructions
Handling of lubricants does not involve any dangers, if they are applied appropriately,
efficiently and in compliance with the required personal precautionary hygienic measures.
Accidents or gross abuse may entail injuries to health and environmental nuisance.
BA 822-0001 en
Danger
Previous edition:
Safety measures
• Avoid contact with skin, eyes and clothing.
• Wear protective clothing, rubber gloves, anti-skid shoes,
safety goggles.
• Keep away from food.
• Keep the workplace clean.
• Keep container tightly closed.
• Use protective skin agents.
First aid
• Put off wet clothes.
• Upon eye contact with oil, rinse with lots of water.
• Upon eye contact with grease, rinse with lots of hot
water.
• Upon contact with the skin, wash off with water and
soap.
• Injuries caused by grease-/oil equipment require
immediate hospital treatment.
Safety
Precautionary measures
Page 2 of 2; BA 822-0001-02 en
Technical Machine Documentation State: 11.2010
Transport BA 822-0001-03 en
Page 1 of 2
Medium lubricant quantities are generally transported in upright drums and/or in the con-
tainer types mentioned in Section "General/Container Types and -Sizes".
Transport
Drums must not be thrown off from the loading surfaces (wag-
gon, truck, ramps) (also not when resting on a padding). The
thin-walled iron drums used today are particularly sensitive
against shocks. Upon heavy drum deformations, an application
of barrel-mounted pumps can no longer be ensured. The contai-
ner seams may tear up and the covers snap off.
Page 2 of 2; BA 822-0001-03 en
Technical Machine Documentation State: 11.2010
Storage BA 822-0001-04 en
Page 1 of 6
Listed below are general instructions for lubricant storage outside water protection areas.
According to the German mineral oil tax law, unpaid and tax-
paid lubricants have to be stored separately.
Lubricants stored for a too long time should be checked for their
state before being used.
Alterations in this edition:
Storage
Drum cocks enable quick tapping and locking up. Oil puddles
are reduced.
Storage tanks with galvanized inside are not suitable. Under the
influence of certain lubricant additives, zinc soaps may form
inside the tanks which have a detrimental effect on the quality.
Page 2 of 6; BA 822-0001-04 en
BA 822-0001-04 en; Page 3 of 6
Storage
Storage
Intermediate store
Intermediate stores can offer economic advantages (short ways and short waiting times).
Analogously applicable are the same conditions as for the central store.
• An intermediate store is only intended for receiving those lubricant quantities, which
are required for covering the demand for normal servicing jobs.
• Larger volumes must be ordered from the central store well in time.
Page 4 of 6; BA 822-0001-04 en
BA 822-0001-04 en; Page 5 of 6
Storage
Outdoor storage
Storage
An outdoor storage in upright position adversely influences the lubricant. Rainwater and dust coll-
ect on the drum bottom. Temperature fluctuations cause changes of the volume inside the drum.
The drum breathes. Past the faucet, the water is sucked into the drum inside.
Consequences:
• The lubricant quality is impaired.
• In case of sodium greases penetrated water results in an emulgation of the grease
surface.
• Lime soap greases decompose upon thermal effects and become unfit for use.
• For transformer and switch oils already minor water traces may reduce the dielectric
strength.
• When opening containers stored outdoors, dust, quicksand and other contaminations
can penetrate into the drum and mix with the lubricant. Contaminated lubricants result
in increased abrasion and may clog the lubricating and spraying equipment.
• Due to the influence of weathering phenomena, lettering, brand identifications and -
markings may become illegible and the lubricants may be no longer distinguishable.
A mixing up of lubricants, improper application resp. a mixture of two non-miscible lubricants may
result in undesired side effects.
Page 6 of 6; BA 822-0001-04 en
Technical Machine Documentation State: 11.2010
Marking BA 822-0001-05 en
Page 1 of 2
Markings are allocated to the different lubricant types, which consist of abbreviations, code
letters, additional code letters and simple symbols (geometric symbols).
Uniform marking on the lubricant containers, issuing vessels, distributing tanks (oil cans,
grease guns), filling lines and lubricating points reduces the danger of confusions and use
of the wrong lubricant types.
BA 822-0001 en
• Any marking must only be used once and always for the same lubricant type
Previous edition:
only.
• The markings must be permanently affixed (self-adhesive plastic sheets, colour
markings with template etc).
• Marking in accordance with DIN
Symbol according to
Lubricant designation DIN 51 502
with registered example
on mineral
oil base
lubricating
greases
on synthesis
Alterations in this edition:
oil base
Page 2 of 2; BA 822-0001-05 en
Marking
Example for in-plant marking by colours, abbreviations, code letters and symbols :
Page 2 of 2; BA 822-0001-05 en
Technical Machine Documentation State: 11.2010
Lubrication BA 822-0001-06 en
Page 1 of 3
Contents Page
2. Lubricant filling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Lubrication
Lubricating cars facilitate transportation of lubricants and tools, if any, to the lubrication points.
Page 2 of 3; BA 822-0001-06 en
BA 822-0001-06 en; Page 3 of 3
Lubrication
2. Lubricant filling
Only use the filling devices provided for that purpose (drum
cocks, barrel-mounted pumps).
Page 1 of 2
Used oils are semifluid or fluid substances which wholly or partly consist of mineral oil or
synthetic oil including oil-bearing residues from containers, emulsions and water-oil mixtu-
res.
Applicable in the Federal Republic of Germany is the "pay as you pollute" principle, which
means that the used oil owner is responsible for proper disposal.
BA 822-0001 en
Previous edition:
Category 1,
Used oils suitable for reconditioning
• combustion engine and gear oils
mineral machine-, turbine-, metalworking- and hydraulic
oils, provided these do not contain more than 4 ppm PCB
(polyvinyl chloride) and/or 0.2 % total halogens
Category 2,
Used oils which are contaminated, but may be incinerated in
plants approved of for that purpose
• metalworking oils and insulating oils on mineral oil base
with higher contents of harmful substances
• vegetable lube oils
Category 3,
Used oils that have to be disposed as special waste
• all hydraulic fluids originating from pit coal mining as well
as other used oils, provided these do not belong to
categories 1 and 2 (e.g. solid, oil-bearing residues, water-
oil mixtures, contents of oil separators, oil filters)
• oils of unknown origin, the analyzing result of which does
not enable an allocation to categories 1 and 2
2
Collection points
Alterations in this edition:
Used oils and other waste must only be handed over to collec-
tors approved of by the competent authorities.
The waste owner must make sure that
• the collector possesses a collection and transport permit
(permit in accordance with the local law on waste
disposal
• the vehicle has be licensed for transportation in
accordance with the local hazardous goods regulations
for road transportation
Page 2 of 2; BA 822-0001-07 en
§
this context, the used oil owner has the following responsibili-
ties:
• duty of evidencing correct declaration of the used oil
• duty of evidencing under regulations on the collection,
transport and supervision of waste and tailings
(AbfRestÜberwV) and
• duty of complying with the prohibition of mixing.
Page 2 of 2; BA 822-0001-07 en
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Section – III D
Operating Instructions –
Table of Lubricants– HW 6302/15
State : 06.2020
Schmierstofftabelle
Table of lubricants
Sachgemäße Schmierung mit den für den jeweiligen Verwendungszweck bestgeeigneten
Schmierstoffen ist zur Erhaltung der Betriebssicherheit und angemessener Lebensdauer
unbedingt erforderlich. Es ist nicht möglich, mit den in diesem Schmierplan angegebenen
Richtwerten die Schmierstoffe vollkommen zu charakterisieren. Die Verantwortung für die
richtige Auswahl der Schmierstoffe unter Berücksichtigung der örtlichen Gegebenheiten und
der Einsatzbedingungen derartiger Industrieanlagen sowie des letzten Standes der
Schmiertechnik liegt ausschließlich beim Schmierstofflieferanten.
Für Mängel oder Schäden, die auf falsche Auswahl von Schmierstoffen zuruckzuführen sind,
haften wir nicht.
Zusammenfassend empfehlen wir, nur hochwertige Schmierstoffe zu verwenden, die
entsprechend unseren Richtwerten von namhaften Gesellschaften verantwortlich ausgewählt
wurden.
For maintaining the reliability of operation and an adequate service life proper lubrication with
lubricants most suitable for the individual application, is absolutely necessary. It is not possible
to fully characterize the lubricants with only the standard values indicated in this lubrication
chart. The responsibility for the correct choice of the lubricants-taking into account the local
conditions and working conditions in such industrial plants as well as the latest developments
of lubrication technology exclusively lies with the lubricant supplier.
We do not warrant for defects or damage which can be attributed to the use of unsuitable
lubricants.
In summarizing we would recommend that only high quality lubricants be used which have
been responsibly selected by reputed firms in accordance with our standard values.
Spezifikation / Specifications
HLP 32 HYDRAULIKÖL
mit Wirkstoffen zur Erhöhung des Korrosionsschut-
32 28,8 ... 35,2 175 -18 10
zes und der Alterungsbeständigkeit sowie mit Wirk-
stoffen zum Herabsetzen der Reibung und des
Verschleißes im Mischreibungsgebiet.
HLP 46 HYDRAULIC OIL
51 524-2 46 41,4 ... 50,6 185 -15 10
with additives increasing the protection against cor-
rosion and the resistance to aging and with additives
for reducing the friction and the wear in the mixed
HLP 68 friction zone. 68 61,2 ... 74,8 195 -12 10
1)
CLP 46 GETRIEBE- UMLAUF- UND 46 41,4 ... 50,6 175 -12 12
LAGERSCHMIERÖL
CIRCULATION LUBE OIL (GEAR AND
BEARING LUBRICATING OIL)
CLP 68 68 61,2 ... 74,8 180 -12 12
MINERALÖL
mit Wirkstoffen zum Erhöhen des Korrosionsschut-
zes und der Alterungsbeständigkeit sowie mit Wirk-
CLP 100 stoffen zum Herabsetzen der Reibung und des
100 90 ... 110 200 -12 12
Verschleisses im Mischreibungsgebiet
max. Ölsumpftemperatur: 80 °C
SYNTETICAL OIL
Empfohlene Schmieröle /
Lubricating oils recommended
Kennzeichnug nach
Symbol
accounted to
DIN 51 502
BECHEM
HLP 32 OSO 32 Aral Vitam GF 32
STAROIL NR 32
HL-32
BECHEM
HLP 46 OSO 46 Aral Vitam GF 46
STAROIL NR 46
HL-46
BECHEM
HLP 68 OSO 68 Aral Vitam GF 68
STAROIL NR 68
HL-68
BECHEM
CLP 46 OSO 46 Aral Degol BG 46
STAROIL G 46
-
BECHEM Gearlube
CLP 68 BLASIA 68 Aral Degol BG 68
STAROIL G 68 SP-68e
BECHEM Gearlube
CLP 100 BLASIA 100 Aral Degol BG 100
STAROIL G 100 SP-100e
BECHEM Gearlube
CLP 220 BLASIA 220 Aral Degol BG 220
STAROIL G 220 SP-e220
BECHEM Gearlube
CLP 320 BLASIA 320 Aral Degol BG 320
STAROIL G 320 SP-e320
BECHEM Gearlube
CLP 460 BLASIA 460 Aral Degol BG 460
STAROIL G 460 SP-e460
BECHEM Gearlube
CLP 680 BLASIA 680 Aral Degol BG 680
STAROIL G 680 SP-680s
Kennzeichnug nach
Symbol
Empfohlene Schmierfette /
accounted to
DIN 51 502 Lubricating greases recommended
HIGH-LUB L 3
KP 3K-20 GR MU/EP 3 -
HIGH-LUB LT 3 EP
ML-160/3
auf Anfrage
KP 2P-20 for inquiry
- BERUTOX M 21 KN BRB-700
Empfohlene Schmieröle /
Lubricating oils recommended
Kennzeichnug nach
Symbol
accounted to
DIN 51 502
Renolin B 10 VG 32
Renolin MR 10 VG 32
HLP 32 FLUID DRIVE HM-32 Servosystem HLP 32
Renolin ZAF B 32 HT
LAMORA HLP 32
Renolin ZAF D 32 HT
Renolin B 15 VG 46
Renolin MR 15 VG 46
HLP 46 FLUID DRIVE HM-46 Servosystem HLP 46
Renolin ZAF B 46 HT
LAMORA HLP 46
Renolin ZAF D 46 HT
Renolin B 20 VG 68
Renolin MR 20 VG 68
HLP 68 FLUID DRIVE HM-68 Servosystem HLP 68
Renolin ZAF B 68 HT
LAMORA HLP 68
Renolin ZAF D 68 HT
Renolin ZAF B 46 HT
CLP 46 FLUID DRIVE HM-46 Servosystem CLP 46
Renolin CLP 46 plus
Klüberoil GEM 1-46 N
Renolin CLP 68
CLP 68 BESLUX GEAR 68 Servosystem 68
Renolin CLP 68 plus
Klüberoil GEM 1-68 N
VDL 100 BESLUX GEAR XP 100 Servopress 1000 Renolin 504 VG 100 Klüber-Summit DSL-100
Kennzeichnug nach
Symbol
Empfohlene Schmierfette /
accounted to
DIN 51 502 Lubricating greases recommended
CENTOPLEX 2
KP 2K-20 G. A. Nr. 850 EP-2 Servogem super HT Renolit FEP 2
CENTOPLEX 2 EP
K 2P-20
(Polyharnstoff-
eingedickt) G. BESLUX KOMPLEX M-2 Servogem super HT Renolit PU 8-061/2 PETAMO GHY 133 N
(organic polymer
base grease)
KP 1K-20 G. A. Nr. 850 EP-1 Servogem super HT- Renolit Duraplex EP 1 MICROLUBE GL 261
KP 2N-10 G. BESLUX PLEX EH-2 Servoplex LC-2 Renolit FAP 502 Klüberplex BE 31-502
Empfohlene Schmieröle /
Lubricating oils recommended
Kennzeichnug nach
Symbol
accounted to
DIN 51 502
Q8 Goya 68
CLP 68 GEARMASTER® CLP 68 Mobilgear 600 XP 68 Q8 Holst 68 Omala S2 G 68
Q8 Holst EP 68
Q8 Goya 100
CLP 100 GEARMASTER® CLP 100 Mobilgear 600 XP 100 Q8 Goya NT 100 Omala S2 G 100
Q8 El Greco 100
Q8 Goya NT 220
CLP 220 GEARMASTER® CLP 220 Mobilgear 600 XP 220
Q8 El Greco 220
Omala S2 G 220
Q8 Goya NT 320
CLP 320 GEARMASTER® CLP 320 Mobilgear 600 XP 320
Q8 El Greco 320
Omala S2 G 320
Q8 Goya NT 460
CLP 460 GEARMASTER® CLP 460 Mobilgear 600 XP 460
Q8 El Greco 460
Omala S2 G 460
Q8 Goya 680
CLP 680 GEARMASTER® CLP 680 Mobilgear 600 XP 680
Q8 Goya NT 680
Omala S2 G 680
Q8 Schubert 100
VDL 100 RENOLIN 504 Mobil Rarus 427
Q8 Schumann 100
Corena S2 P 100
Kennzeichnug nach
Symbol
Empfohlene Schmierfette /
accounted to
DIN 51 502 Lubricating greases recommended
LAGERMEISTER LP 2
Mobilgrease XHP 222
KP 2K-20 LAGERMEISTER BF 2
Mobillux EP 2
Q8 Rubens EM 2 Gadus S2 V100 2
LAGERMEISTER EP 2
Unirex N 3 Q8 Rembrandt 3 Alvania RL 3
KP 3K-20 STABYL L 120
Mobillux EP 3 Q8 Rembrandt EP 3 Gadus S2 V100 3
GEARMASTER® LI 400
G 00F-20 (GP 00P-40 Lithiumkomplex)
Mobillux EP 004 Q8 Rubens 00 Gadus S2 V220 00
(GP 00N-30 (Lithiumkomplex))
K 2P-20
(lithiumverseift) LAGERMEISTER LX EP 2 - Q8 Rubens WB/b Gadus S3 T220 2
(Lithium saponified)
K 2P-20
(Polyharnstoff-
eingedickt) LAGERMEISTER XXL (Mobil Polyrex EM) - Gadus S3 T100 2
(organic polymer
base grease)
STABYL ECO EP 2
KPE 2K-40 STABYL ECO S 12
Mobil SHC Grease 102 EAL - Naturelle Grease S5 V120P 2
Seite/Page 6 von/of 18; HW 6302/15
Empfohlene Schmieröle /
Lubricating oils recommended
Kennzeichnug nach
Symbol
accounted to
DIN 51 502
Kennzeichnug nach
Symbol
Empfohlene Schmierfette /
accounted to
DIN 51 502 Lubricating greases recommended
Multis EP 2 Tribol GR 100-2 PD
KP 2K-20 - Multifak EP 2 Multis Complex EP 2 Tribol GR 4020/220-2 PD
Ceran XM 220 Spheerol EPL 2
Tribol 3020/1000-00 PD
G 00F-20 - Marfak 00 Multis EP 00
Tribol GR 100-00 PD
Spheerol EPL 1
KP 1K-20 - Multifak EP 1 Multis EP 1 Tribol GR 100-1 PD
Tribol GR 4020/220-1 PD
Empfohlene Schmieröle /
Lubricating oils recommended
Kennzeichnug nach
Symbol
accounted to
DIN 51 502
Kennzeichnug nach
Symbol
Empfohlene Schmierfette /
accounted to
DIN 51 502 Lubricating greases recommended
Balmerol Liplex EM 2 Lithon 2
KP 2K-20 Balmerol Olitec LL EP 2 Lithon EP 2
K 2P-20
(Polyharnstoff-
eingedickt) Balmerol Liplex EM 2 -
(organic polymer
base grease)
Lithoplex HTX 1
KP 1K-20 Balmerol Olitec LL EP 1
Lithon EP 1
KPE 2K-40 - -
Seite/Page 8 von/of 18; HW 6302/15
Spezifikation / Specifications
ACEA E2/API CD
> 4,1 215 -33
SAE 10 W
ACEA E2/API CD
12,5 ... 16,3 225 -25
SAE 15 W-40 DIESELMOTOREN-
SCHMIERÖL
ACEA E2/API CD
9,3 ... 12,5 230 -18
SAE 30
OTTOMOTOREN-
ACEA B3/E2
SCHMIERÖL 12,5 ... 16,3 225 -25
SAE 15 W-40 OTTO-ENGINE OIL
ATF
GM-Specification AUTOMATIC-
6,5 ... 8,5 190 -45
Typ A, Suffix A TRANSMISSION
FLUID
API GL 4
> 7,0 225 -30
SAE 80 W KRAFTFAHRZEUG-
GETRIEBEÖL
AUTOMOBIL
API GL 5 GEAR OIL
13,5 ... 24 240 -20
SAE 90
HW 6302/15; Seite/Page 9 von/of 18
Empfohlene Schmieröle /
Lubricating oils recommended
Motoren-Schmieröle / Engine lubricating oils
Viskositätsklasse
Viscosity class
SAE J 300
Anforderung nach
requirement for
BECHEM STAROIL
ACEA E2/API CD I-SIGMA monograde
Turboral 10W Multigrade LL SAE 10 Super MG
SAE 10 W 10W-20
W-40
BECHEM STAROIL
ACEA E2/API CD I-SIGMA universal DL
Turboral 15W-40 MULTIGRADE S3 HD Superior
SAE 15 W-40 15W-40
SAE 15W-40
BECHEM STAROIL
ACEA E2/API CD I-SIGMA monograde
(Turboral 20W-20) MULTIGRADE S3 HD Pride
SAE 20 10W-20
SAE 20W-30
BECHEM STAROIL
ACEA E2/API CD I-SIGMA monograde
(Turboral 30) MULTIGRADE S3 HD Pride
SAE 30 30
SAE 20W-30
BECHEM STAROIL
ACEA B3/E2 I-SIGMA performance
(TRONIC 15W-40) MULTIGRADE S3 HD Superior
SAE 15 W-40 E3 15W-40
SAE 15W-40
BECHEM
GM-Spezification
ROTRA ATF Getriebeöl SGF 84 FLUID GETRIEBEÖL Transfluid A
Typ A, Suffix A ATF 415 A
BECHEM
API GL 5 ROTRA MP DB 85W- Getriebeöl Hyp
HYPOIDGETRIE- Servomesh EE
SAE 90 90 85W-90
BEÖL SAE 90
Seite/Page 10 von/of 18; HW 6302/15
Empfohlene Schmieröle /
Lubricating oils recommended
Motoren-Schmieröle / Engine lubricating oils
Viskositätsklasse
Viscosity class
SAE J 300
Anforderung nach
requirement for
TITAN
ACEA E2/API CD
- SERVO PRIDE UNIVERSAL -
SAE 20 HD 20W-20
BRADOL MULTIGRA-
ACEA B3/E2 TITAN Balmerol Gold Pre-
DEO SHPD SAE SERVO SUPERIOR
SAE 15 W-40 15W40
TRUCK 15W-40 mium CF-4 15W-40
Balmerol HP 90 (SPL)
API GL 5 EXTRA
SERVOMESH EE TITAN GEAR HYP 90 Balmerol HP 85W-90
SAE 90 GEAR SAE 90 EP
(SPL)
HW 6302/15; Seite/Page 11 von/of 18
Empfohlene Schmieröle /
Lubricating oils recommended
Motoren-Schmieröle / Engine lubricating oils
Viskositätsklasse
Viscosity class
SAE J 300
Anforderung nach
requirement for
ACEA E2/API CD
- - Q8 T 520 10W Rimula R3 10W
SAE 10 W
ACEA E2/API CD
- (Mobil Delvac 1320) Q8 T 520 SAE 20 (Rimula R3 20W-20)
SAE 20
ACEA E2/API CD
- Mobil Delvac 1630 Q8 T 520 SAE 30 Rimula R3+ 30
SAE 30
(Engine Oil DG
ACEA B3/E2 Mobil Super 10W-40
- Q8 T 750 15W-40
SAE 15 W-40 1000 X1 15W-40 Rimula R3 U+ 10W-
40)
GM-Spezification Mobil
- Q8 Auto 14 Spirax S1 ATF TASA
Typ A, Suffix A ATF 200
Empfohlene Schmieröle /
Lubricating oils recommended
Motoren-Schmieröle / Engine lubricating oils
Viskositätsklasse
Viscosity class
SAE J 300
Anforderung nach
requirement for
ACEA B3/E2 SRS Multi-Rekord Ursa Heavy Duty SAE GTX Professional A3
Rubia XT 15W-40
SAE 15 W-40 Plus 15W-40 15W-40
Empfohlene Schmieröle /
Lubricating oils recommended
Motoren-Schmieröle / Engine lubricating oils
Viskositätsklasse
Viscosity class
SAE J 300
Anforderung nach
requirement for
ACEA E2/API CD
HYLUBE X-3-10W
SAE 10 W
ACEA E2/API CD
HYLUBE LL 15W40
SAE 15 W-40
ACEA E2/API CD
HYLUBE X-3-20
SAE 20
ACEA E2/API CD
HYLUBE X-3-30
SAE 30
ACEA B3/E2
HYLUBE LL 15W40
SAE 15 W-40
HP AUTOMATIC
GM-Spezification
TRANSMISSION
Typ A, Suffix A FLUID A
API GL 4
HP GEAR OIL EP 80
SAE 80 W
API GL 5
HP GEAR OIL XP 90
SAE 90
Seite/Page 14 von/of 18; HW 6302/15
GEARMASTER® ECO
460 (biologisch abbau-
bar /
OMALA HD 460 Klübersynth GEM 4-460 N Berusynth GP 460
biological degradable)
GEARMASTER® SYN
460
HW 6302/15; Seite/Page 15 von/of 18
CEPLATTYN® HT (schwarz /
black) WOLFRACOAT C Fluid Berulub VPN 13 Ringlub
CEPLATTYN® TL (silber / silver)
Seite/Page 16 von/of 18; HW 6302/15
Mobilith SHC
STABYL HD 1500
Klüberlub
(bleifrei / non-leaded)
BE 41-1501 synthetisches EP- Tribol GR 3020/
STABYL LTS MO
(bleifrei / non-leaded) Schmierfett/ 1000-2 PD
(einsetzbar bis -30 °C /
applicable up to -30 °C) synthetic EP
Grease
GEARMASTER®
Klübersynth ECO 460 *)
EG 4-460 *) (biologisch abbaubar /
Klübersynth biological degradable)
GEM 4-460 N *) GEARMASTER®
SYN 460 *)
Fett für Lagerlabyrinthe bei Ölschmierung 1)
Grease for bearing labyrinths for oil lubrication 1)
1) Öle und Fette sind aufeinander abgestimmt immer vom gleichen Hersteller einzusetzen.
1) Oil and grease are to be applied always matched by the same manufacturer.
*) je nach Betriebstemperatur auch ISO VG 680 / depending on operating parameters also ISO VG 680
HW 6302/15; Seite/Page 17 von/of 18
1) HYDRAULIC OIL
General application- Hydraulic system. Lubricant for rolling and plain bearings and for lubrication of gear units where the use of extreme
pressure gear Oil is not required. Property- Hydraulic oil, HM consists of highly refined paraffinic base stocks with additives to prevent rust,
oxidation and wear.
General application - Lubrication of low and high-load gear units and bearing of KHD design. For gear units form other supplier: See special
recommendation from the supplier in question. Suitable for use at operationg T < 90°C approx. Property- This mineral oil consists of highly
refined paraffinic base stocks with additives to prevent rust, wear and foam. The oil yields extreme pressure properties. General requirement-
The oil must be able to run with a filter reduction rate of beta 10 >75 (10my absolute filtration) defined in ISO4572 (Multipass test), without
loss of additives.
General application- Lubrication of air compressors, i.e. piston and rotary compressors for production of compressed air. Compressor outlet
temperature < 220°C. Property- Compressor oil are made of highly refined paraffinic base stocks with additives to prevent oxidation, rust,
foaming and wear.
General application- General industrial lubrication. Electrical motor and generator. Large bearings > 75 mm bore. Lubrication of all types of
roller and plain bearing for medium to high loads and moderate to high speeds (dN-factor < 200.000). Special application: Solyvent damper,
bearing and ball joint at temperature up to 110 ºC. Property -The multipurpose grease and the low-temperature grease consist of a highly
refined mineral oil or polyalphaolefin with a thickener added as well as additives to prevent corrosion and oxidation. Multipurpose grease and
low-temperature grease is not mixable unless thickener is of the same type. Grease of NLGI 3 is not pump able.
General application- Rolling and plain bearings in mechanical or electrical equipment. High operation temperatures. Special application:
Solyvent damper, bearing and ball joint at temperature up to 350 ºC. Property- High-temperature grease consists of highly refined mineral oil
or synthetic oil (perfluoroalkyl ether oil. PTFE) with a thickener added as well as additives to prevent corrosion and oxidation. High-
temperature grease must be suitable for centralised lubrication systems. General requirement- Information on water resistance must be
required for every single product. Corrosion protection must be agreed with supplier.
General application- Rolling and plain bearings in mechanical/electrical high-speed equipment with low to moderate operating temperatures.
Property- The multipurpose grease and the low-temperature grease consist of a highly refined mineral oil or polyalphaolefin with a thickener
added as well as additives to prevent corrosion and oxidation. Multipurpose grease and low-temperature grease is not mixable unless
thickener is of the same type. Grease of NLGI 3 is not pump able.
TOTAL Deutschland GmbH, Jean-Monnet-Straße 2, D-10557 Berlin, Germany P.O.Box No. 16791, Sion Mumbai 400 022, India
Balmer Lawrie & Co Ltd, P-43, Hide Road Extension, Kolkata - 700088, India
Servo Indian Oil Corporation Limited,
G-9 Ali Yavar Jung Marg, Bandra (East), Mumbai
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Section – IV
State : 06.2020
Technical Machinery Documentation State: 06.2020
Page 1 of 1
S.
Description Document No.
No
1 Pyro-Jet Burner 307-011-130630224
1.1 Support tube 307-011-130630227
1.2 Compensator 400 NB
1.3 Coal dust pipe 307-011-130630228
1.4 Wearing insert 307-011-130630229
1.5 Intern.burner pipe complete 307-011-130630230
1.6 Supporting pipe for additional burner 307-011-130630231
1.7 Nozzle plate complete 307-011-130630031
1.7.1 Nozzle plate 307-011-130630033
1.8 Coal dust nozzle internal 307-011-100486
1.9 Nozzle pipe complete 307-011-103570536
1.10 Swirler 307-011-130630029
1.11 Cross - Beam 307-031-130630231
Doc. No.: DO P-13-0052 en
Technical Machinery
Documentation
Pyrojet Burner
Section – V
State : 06.2020
Technical Machinery Documentation State : 06.2020
MU P-13-0052 en
Documents for the assembly
Page 1 of 1
of the machine
Contents:
Previous edition:
100
80
n606,4
n406,4
B B
C 10 8 9 7 1 3 6 5 4 23 26 2 16 19 C
D 9833 275 D
E E
U S2 S1 W
n406,4
n606,4
A A
n88.9x3.2
480
F n100 F
Y
Patenterteilung oder Gebrauchsmuster-Eintragung vorbehalten.
Weitergabe sowie Vervielfältigung dieser Unterlage, Verwer-
3 3
pflichten zu Schadenersatz. Alle Rechte für den Fall der
,5
tung und Mitteilung ihres Inhalts nicht gestattet, soweit
120
70
n
2000
8000
G 14 G
12304
12607
12810
H H
USE OR COMMUNICATION OF THE CONTENTS THEREOF, ARE FORBIDDEN
Z (1 : 2) M)*
Before assembly this areas are to be greased
J with heat resistant lubricant (Anti Seize). J
Z
n13
K K
425
DESIGN .
480
Refractory and anchorage to be fitted on
L site by specialized company in this branch. L
Expansion joints are to be provided.
Before fitting the refractory material coat
the burner with bitumen or wax approx. 1-2mm thick.
n406,4
n284
n153
n198
n131
8220 2200
BIRKOSIT sealing putty to be applied to
faces prior screwing.
M 14 M
10 8 9 7 5 3 6 1
N W (1 : 10) N
500 500
V (1 : 5)
U (1 : 10) 43`1
V
X (1 : 2)
P
27 17 Tightness test of the jet air channel (between item 1, 2, P
7 3 & 4) to be carried out with min. test pressure of 2 bar.
45 °
500
12
n 100
28
DIM ENS IO NS /Ma ße in mm
43`1
11 Fo rm-, L a g e-, Allg .- To le ra n ze n n . I SO 1 1 01 u . ISO 2 7 6 8-m-K O b e rf äl c h en -A ng a b en D OC . TYPE: / SCA LE :/ We rkst of f s . Stü ck list e
n70,5
13
m itte l g rob k ons tr uk tion ISO 13 715
IS O 2 768 IS O 27 68 IS O 9 013- 431 IS O 90 13-4 32 ISO 139 20-B , -F
-0 ,3
W ELDI NG SEAMS WITHO UT SPEC IFICATIO NS O F QU ALITY C LASS +0 ,3
Pyr o- je t- bu rn er
Schweisszusatzwerkstoffe fuer Montagenaehte Sch weißn äh te oh ne Be wertu ng sgru pp en -An ga be
R
Before assembling item 3 and item 5, All flanged coupling joints must be
We rkstoffpaarung
material match
Stabelektrode
stick e le ctro de
PAR T-N O: /
Teil e-Nr.:
SH EETS IZE:/
Form at:
LAN GU AGE: /
Sprac he
R EV.: /
R ev .:
1.4848 - 1.4848
EN 1 600 - E 25 20 B 22
WEDAG 307-011-130630224 00
2018
(DIN 855 6 - E 25 20 B 20 +1. 4842 )
R EPLAC EMENT FOR :/ S HEE T:/B a
l t t:
EN ISO 1 4172 - E Ni 6 082 (NiCr20 Mn3 Nb)
1.0254 - 1.4848 AWS A5.11 -0 5: E NiCrFe-3 (Mat erial No. : 2.4 648 )