70-77 F RMT-GSI - Face
70-77 F RMT-GSI - Face
70-77 F RMT-GSI - Face
0 1 2m
Decisive RMT:
200-60
60-20
>200
20-6
high
Name / Signature
low
6-2
Material t s m
<2
Page-70
Project: Parwanoo - Solan Road Project (Barog Road Tunnel)
Engineering Geological Documentation of the Tunnel Face For Rock Class-III
FACE FROM LAST PHOTO SHEET
DATE: TIME: CHAINAGE: TUNNELMETER: m SHOTCRETE LINING:
m OVERBURDEN: m NO.: NO.:
0 1 2m
Decisive RMT:
200-60
60-20
>200
20-6
high
Name / Signature
low
6-2
Material t s m
<2
Page-71
Project: Parwanoo - Solan Road Project (Barog Road Tunnel)
Engineering Geological Documentation of the Tunnel Face For Rock Class-II
FACE FROM LAST PHOTO SHEET
DATE: TIME: CHAINAGE: TUNNELMETER: m SHOTCRETE LINING:
m OVERBURDEN: m NO.: NO.:
0 1 2m
Decisive RMT:
CHARACTERISTICS OF DISCONTINUITIES NO. OF SETS: Overall rock mass behaviour / general remarks: Engineering Geologist
TYPE ORIENTATION ROUGHNESS PERSIST. SPACING (cm) FILLING Cons. Thickn. Aperture Name / Signature
medium
200-60
60-20
>200
20-6
high
low
6-2
Material t s m
<2
Page-72
Project: Parwanoo - Solan Road Project (Barog Road Tunnel)
Engineering Geological Documentation of the Tunnel Face For Rock Class-I
FACE FROM LAST PHOTO SHEET
DATE: TIME: CHAINAGE: TUNNELMETER: m SHOTCRETE LINING:
m OVERBURDEN: m NO.: NO.:
0 1 2m
Decisive RMT:
CHARACTERISTICS OF DISCONTINUITIES NO. OF SETS: Overall rock mass behaviour / general remarks: Engineering Geologist
TYPE ORIENTATION ROUGHNESS PERSIST. SPACING (cm) FILLING Cons. Thickn. Aperture Name / Signature
medium
200-60
60-20
>200
20-6
high
low
6-2
Material t s m
<2
Page-73
Project: Parwanoo - Solan Road Project (Barog Road Tunnel)
Engineering Geological Documentation of the Tunnel Face
Legend
Rock types
andesite / basalt
silt
fault rock
1) 2) shear plane
1) with direction of displacement
2) no direction detected
1) 2) 3) major joint
medium joints
low joints
1) 2) 3) Water condition:
1) dripping, 2) seeping, 3) inflow
0 1 2m
Decisive RMT:
GSI:
CHARACTERISTICS OF DISCONTINUITIES NO. OF SETS: Overall rock mass behaviour / general remarks: Engineering Geologist
TYPE ORIENTATION ROUGHNESS PERSIST. SPACING (cm) FILLING Cons. Thickn. Aperture Name / Signature
medium
200-60
60-20
>200
20-6
high
low
6-2
Material t s m
<2
Page-75
sl slightly h highly vs very strong ms medium strong vw very weak da damp dp dripping fw flowing vt very stiff f firm vs very soft
Page-75
Project: Parwanoo - Solan Road Project (Barog Road Tunnel)
Engineering Geological Documentation of the Tunnel Face
FACE FROM LAST PHOTO SHEET
DATE: TIME: CHAINAGE: TUNNELMETER: m SHOTCRETE LINING:
m OVERBURDEN: m NO.: NO.:
0 1 2m
Decisive RMT:
200-60
60-20
>200
20-6
high
Name / Signature
low
6-2
Material t s m
<2
Page-76
Project: Parwanoo - Solan Road Project (Barog Road Tunnel)
Engineering Geological Documentation of the Tunnel Face
FACE FROM LAST PHOTO SHEET
DATE: TIME: CHAINAGE: TUNNELMETER: m SHOTCRETE LINING:
m OVERBURDEN: m NO.: NO.:
0 1 2m
Decisive RMT:
CHARACTERISTICS OF DISCONTINUITIES NO. OF SETS: Overall rock mass behaviour / general remarks: Engineering Geologist
TYPE ORIENTATION ROUGHNESS PERSIST. SPACING (cm) FILLING Cons. Thickn. Aperture Name / Signature
medium
200-60
60-20
>200
20-6
high
low
6-2
Material t s m
<2
Page-77