Client: (Client Name Here) Sheet: _____ of _____ 

Project: (Project Name Here) Date: mm/dd/yy


Description: (Description of what is being calculated) Job No: ########
By: (Author) Chkd By: _____ 

Cantilever Sheet Pile Wall in Cohesionless Soil


Reference
These calculations are in accordance with IBC 2006 and ASCE 7-05. 7-05. They are based
based on the
procedures
procedures outlined in ACI
A CI 350.3-06, with modific ations as requ
required
ired per ASCE 7-05
7-05..

The resulting forces are Strength Level Forces.

Task : 1) Design
Design length
length of
of a cant
cantilever
ilever sheet
sheet
2) Select sheet pile section

C  0
Cs - Cohesion of Soil
(For Cohesionless soil, C is zero)

Note : The calculations are done for 1ft strip width.

Calculations PF - 6.6.#
Page 1 of 7
Did you know?
Scribd is more than just documents. Our digital library gives
you access to books, audiobooks, and more.

Learn more
Did you know?
Scribd is more than just documents. Our digital library gives
you access to books, audiobooks, and more.

Learn more

Client: (Client Name Here) Sheet: _____ of _____ 


Project: (Project Name Here) Date: mm/dd/yy
Description: (Description of what is being calculated) Job No: ########
By: (Author) Chkd By: _____ 

Design Parameters
Reference

h = Height of Pile above dredge line h  12  ft

D = Height of Pile below dredge line

L1  = Height of Pile above water table

L2  = Height of Pile above dredge line upto water-table

L3  = Height of Pile above dredge line

L4  = Height of Pile below dredge line D - L3

 = Unit weight of homogeneous Soil γ 


  115pcf 

sat  = Specific unit weight of Soil γsat   52.6pcf 

ϕ = Angle of internal soil friction ϕ  30°


2
Ka = Active earth pressure Coefficient  
K a  tan ( 45°) 
ϕ
 0.333
  2 
2
Kp = Passive earth pressureCoefficient  p = 1/ K a
K  K 
 
 p  tan ( 45°) 
ϕ
3
  2 

K'p = Coefficient K' p = K 


 p/SF SF = 1.5 - 2.0 K 
 p
K' p   2
1.5

Surcharge:
q = Soil surcharge q  0psf  

The active earth pressure at bottom of excavation is;


Pa = γ.h.Ka  + q.Ka Pa  γ  h  K a  q  K a

Pa   460 psf 
2
The lateral force Ha1  is calculated as h
Ha1  γ  K a   q  K a  h
H .h.K h/2 + q.K h 2
Did you know?
Scribd is more than just documents. Our digital library gives
you access to books, audiobooks, and more.

Learn more

Client: (Client Name Here) Sheet: _____ of _____ 


Project: (Project Name Here) Date: mm/dd/yy
Description: (Description of what is being calculated) Job No: ########
By: (Author) Chkd By: _____ 

Reference
The embedment depth "D" D  Y  a  12.05 ft D  12.05 ft

The design depth of sheet pile (Lp)


Fs is factor of safety from 1.2 to 1.4 Fs  1.2 L p  h  Fs  D
L p  26.46 ft

Selection of Sheet Pile Section : (Based on maximum moment and shear)

Find maximum shear force

The maximum shear force is usually located at D where lateral earth pressure change from
active to passive.
3
Vmax  Ha1  Ha2 Vmax   3.105  10 plf 

Find maximum moment which occurs at the point of zero shear:

The maximum moment locates at where shear stress equals to zero between C and D
shown in figure above
 Ass ume the maximum moment locat ed at a dist ance "y" below point C, then
2
γ   K 
 p  K a  y 2   Ha1  Ha2
 Ha1  Ha2   y  y  4.5 ft
2 γ   K 
 p  K a

3
 h    2a   γ   K 
 p  K a  y kip  ft
ΣM max  Ha1   a  y  Ha2  y  ΣM max   24.84
 3     3   6 ft

Determine minimum section modulus:

 Allowable Bending stress σallow   32ksi

ΣM max 3
in
Required Section Modulus S  S  9.32 
σallow ft
3
in
Ssp  5.5