Valence 40 Element Cheat Sheet

This document provides a cheat sheet for testing the elements of a 40-element relay. It outlines the test plans and parameters for four different test scenarios: 1) energized and offline, 2) energized and online, 3) timing test, and 4) post-fault state. For each test, it specifies the expected voltage and current magnitudes and angles. It also provides details on test times, triggers, and output states. The evaluation section indicates how to assess if test results are within the nominal test time delay plus or minus allowed error.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
135 views2 pages

Valence 40 Element Cheat Sheet

This document provides a cheat sheet for testing the elements of a 40-element relay. It outlines the test plans and parameters for four different test scenarios: 1) energized and offline, 2) energized and online, 3) timing test, and 4) post-fault state. For each test, it specifies the expected voltage and current magnitudes and angles. It also provides details on test times, triggers, and output states. The evaluation section indicates how to assess if test results are within the nominal test time delay plus or minus allowed error.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

40-Element Cheat Sheet

40#1-Test()  40#1-Diameter  40#1-Offset or 40#1-Reach

40#2-Test()  40#2-Diameter  40#2-Offset or 40#2-Reach

40#3-Test( )  40#2-Offset

40#1-Test()  40#1-Diameter  40#1-Offset or 40#1-Reach

40#2-Test( )  40#1-Offset

©Valence Electrical Training Services


9888 West Belleview Ave., PMB #122, Littleton CO 80123 Page 1 of 2
[email protected] relaytraining.com 303-250-8257
40-Element Cheat Sheet

a) 40#1/#2-Element Timing Test Plan


1-Energized and Offline 2-Energized and Online
Magnitude Angle Magnitude Angle
V1-Phase Voltage (ABC) 0.00° 0.00°
Nominal Volts Nominal
V2-Phase Voltage (ABC) 120.00° Lag 120.00° Lag
(Vnom) Volts (Vnom)
V3-Phase Voltage (ABC) 120.00° Lead 120.00° Lead
V4-N Volts @ 180Hz 2 x 27TN 0.00° 2 x 27TN 0.00°
I1-Phase Current (ABC) 0.00° 0.25 x 0.00°
I2-Phase Current (ABC) 0.000A 120.00° Lag Nominal 120.00° Lag
I3-Phase Current (ABC) 120.00° Lead Current 120.00° Lead
I4-Phase Current (ABC) Negate I1, I2, I3 Negate
I5-Phase Current (ABC) 0.000A I1, I2, I3 x TAPPhase / I1, I2, I3
I6-Phase Current (ABC) Angles for 87 TAPNeutral Angles for 87
Max Time 50/27 Reset Time x 1.50 2.0000 seconds
State Trigger Input Op or Time Input Op or Time
Out1 (52b) Closed Open

40-Test#1 & 40-Test #3 Test Volts = Nominal Volts


40-Test#1 & 40-Test #3 Test Amps = Test Volts / Test Ohms
40-Test#2 Test Amps = 10.00A (5A CTs), 2A (1A CTs)
40-Test#2 Test Volts = Test Amps x Test Ohms
3-Timing Test 4-Postfault State
Magnitude Angle Magnitude Angle
V1-Phase Voltage (ABC) 0.00° 0.00°
Nominal
V2-Phase Voltage (ABC) Test Volts 120.00° Lag 120.00° Lag
Volts
V3-Phase Voltage (ABC) 120.00° Lead 120.00° Lead
V4-N Volts @ 180Hz 2 x 27TN 0.00° 2 x 27TN 0.00°
I1-Phase Current (ABC) 90.00° Lead 0.00°
Test Amps
I2-Phase Current (ABC) 30.00° Lag 0.000A 120.00° Lag
±5%
I3-Phase Current (ABC) 150.00° Lag 120.00° Lead
I4-Phase Current (ABC) I1, I2, I3 Negate Negate
I5-Phase Current (ABC) x TAPPhase / I1, I2, I3 0.000A I1, I2, I3
I6-Phase Current (ABC) TAPNeutral Angles for 87 Angles for 87
Max Time Test Time + Error Below+0.01 60.0000 seconds
State Trigger Input Op or Time Time
Out1 (52b) Open Closed

Evaluation
Start Stop Nominal ± Error
Timing Test Trip Input Test Time Delay ±5% or ±0.05s or ±3 cycles

©Valence Electrical Training Services


9888 West Belleview Ave., PMB #122, Littleton CO 80123 Page 2 of 2
[email protected] relaytraining.com 303-250-8257