REHABILITAION OF RDA ROADS IN NORTHERN

PROVINCE
SUMMARY OF BILLS

Description Amount (LKR)

BILL No. 1 PRELIMINARIES

REHABILITATION OF VALUKKI ARU PUNUGUDUTIVU KURIKATTUWAN


BILL No. 2
ROAD (0.00 TO 24.5 KM)

SUB BILL NO 2A SITE CLEARING

SUB BILL NO 2B EARTH WORKS

SUB BILL NO 2C SUB BASE,BASE AND SHOULDERS

SUB BILL NO 2D SURFACING

SUB BILL No.2E BRIDGES, CULVERTS AND OTHER STRUCTURES

SUB BILL No.2F INCIDENTAL WORKS

Rehabilitation of Jaffna-Ponnalai-Point pedro Road (14+50 - 29+05


BILL No. 3
km), (30+50 - 36+50 km) & (41+00 - 54+60 km)

SUB BILL NO 3A SITE CLEARING

SUB BILL NO 3B EARTH WORKS

SUB BILL NO 3C SUB BASE,BASE AND SHOULDERS

SUB BILL NO 3D SURFACING

SUB BILL No.3E BRIDGES, CULVERTS AND OTHER STRUCTURES

SUB BILL No.3F INCIDENTAL WORKS

BILL No. 4 Rehabilitation of Jaffna Mainipay Karainagar Road

SUB BILL NO 4A SITE CLEARING

58
SUB BILL NO 4B EARTH WORKS

SUB BILL NO 4C SUB BASE,BASE AND SHOULDERS

SUB BILL NO 4D SURFACING

SUB BILL No.4E BRIDGES, CULVERTS (33 Nos.)

SUB BILL No.4F DRAINAGE AND RETAINING WALLS

SUB BILL No.4G INCIDENTAL WORKS

BILL No. 5 DAY WORKS

TOTAL OF BOQ ITEMS

CONTINGENCIES

B. Add 10 % for Physical Contingencies : {A x 10 %}

C. Add 10% for Price Escalation : {A x 10 %}

D. Bid Price : {A + B + C}

E. Amount of VAT(15%) : { D x 15%}

Grand Total : {D+E}

Bid Price excluding VAT is LKR ………………………………………….(State in words)

59
REHABILITAION OF 03 Nos. RDA ROADS IN NORTHERN
PROVINCE
Item Pay Description Unit Qty Rate Amount
Item
Bill No. 01:Preliminaries
103 TRAFFIC SAFETY AND MANAGEMENT
1.01 103(1) Traffic Safety and Control Month 24.00

1.02 103(2) Provision and maintenance of PS 31,000,000.00


temporary diversion roads if any

108.00 OBLIGATIONS OF THE CONTRACTOR AND GENERAL REQUIREMENT


1.03 108(1) s LS

1.04 108(2) Removal of the site establishment LS


for the Contractor and
Reinstatement of lands excluding
those that are handed over to
Employer
109.00 WORKMANSHIP AND QUALITY CONTROL
1.05 109(3) Special tests ordered by the PS 8,000,000.00
Engineer

113 PREPARATION OF SHOP DRAWINGS


1.06 113(1) Providing shop drawings km 151.00

117 SETTING OUT , CROSS SECTION SURVEY AND DRAWINGS


1.07 117(1) Cross-sectional detailing of full km 151.00
width as specified

118 PROJECT SIGN BOARD


1.08 118(1) Provide and maintain Project Sign Nr(#) 12.00
Board

119 PROVISION OF INSURANCE, BONDS AND SECURITIES


1.09 119(1) Provide Performance Security LS

60
1.10 119(2) Provide Insurance of the Works & LS
Contractor's Equipment as per
Sub-clause 18.1 of the Conditions
of Contract
1.11 119(3) Provide Insurance as per Sub- LS
clause 18.2 of the Conditions of
Contract
1.12 119(4) Provide Insurance as per Sub- LS
clause 18.3 of the Conditions of
Contract
1.13 119(5) Provide Bank Guarantee for LS
Advance Payment

154 MONTHLY PROGRESS REPORT AND PHOTOGRAPHS


1.14 154(1) Monthly Progress Report Mo. 24.00

1.15 154(2) Supply Digital Photographs Mo. 24.00

1.16 154(3) Supply of Video Compact Disks ( Mo. 24.00


VCD)

203 UTILITIES RELOCATION


1.17 203(3) Relocation of utility services as per PS 200,000,000.00
requirements of the utility service
agency and the road agency
1109 ROAD MAINTENANCE OF ANY SECTIONS OF EXISTING ROAD DURING
CONSTRUCTION OF OTHER SECTIONS WITHIN THE SITE
1.18 1109(1) Road Maintenance Category 1) km- 3,576.00
month

1.19 1109(2) Road Maintenance Category 2) km- 3,576.00


(minimum rate shall be month
Rs.8,000)
Bill No. 01 Carried to Summary

61
Bill No. 02: Rehabilitation of Valukki Aru Pungudutivu Kurikattuwan
Road (0.00 to 24.5 km)
SUB BILL NO 2A:SITE CLEARING
CLEARING AND GRUBBING
2A.01 201(1) Clearing and grubbing m2 132,200.00

2A.02 Removing mud in sea water for PS Item Allow 3,000,000.00


platform width

REMOVAL OF STRUCTURES & OBSTRUCTIONS


2A.03 202(1) Dismantle & remove brick m3 150.00
masonry structures

2A.04 202(1)a Dismantle & remove Random m3 250.00


Rubble masonry structures

2A.05 202(1) Dismantle & remove Dressed m3 30.00


b stone mosonary structures

2A.06 202(2) Dismantle & remove concrete m3 270.00


structures

2A.07 202(3) Remove fencing m 5,800.00

Sub Bill No. 2A Carried to Summary

SUB BILL NO 2B:EARTH WORKS


ROADWAY EXCAVAITON
2B.01 301(4) Roadway excavaiton , soil m3 30,600.00
suitable for fill -

EMBANKMENT CONSTRUCTION
2B.02 304(1) Trim, level and compact m2 136,000.00
Original ground

62
2B.03 304(2) Embankment construction, m3 49,300.00
Type 1

2B.04 Construction ogf Causeway 2 PS 1,000,000,000.00


km

2B.05 304(3) Embankment construction, m3 36,000.00


Type 1

2B.06 304(4) Providing & place geo fabric m2 113,600.00


(weight of fabric minimum
500g/m2)
2B.07 304(4B Embankment construction using m3 80,740.00
) Rock fill (1-10Kg)

2B.08 304(4C Embankment construction using m3 16,400.00


) Rock fill 1-50Kg)

2B.09 304(4D Embankment construction using m3 28,800.00


) Rock fill (100-250Kg)

2B.10 304(4E Embankment construction using m3 48,000.00


) Rock fill (.25T -.75T)

Sub Bill No. 2B Carried to Summary

SUB BILL NO 2C:SUB BASE,BASE AND SHOULDERS


GRANULAR PAVEMENT
2C.01 401(1) Sub base as compacted in position m3 22,740.00

2C.02 307(5) Sub base as constructed using Geo m2 9,500.00


grid layer or Geotextiles

2C.03 405(1) Dense graded aggregate base m3 25,800.00


minimum 200 mm thickness
2C.04 408(1) Scarify and Remove existing m2 58,000.00
bitumen layer

63
SHOULDERS
2C.05 409(1) Earthen shoulder as compacted in m3 5,000.00
position
Sub Bill No. 2C Carried to Summary

SUB BILL NO 2D:SURFACING


PRIME COAT AND TACK COAT
2D.01 501(5) Bituminous Prime Coat using m2 209,120.00
b CSS -1 at 1 litre per m2

2D.02 502(1) Bituminous Tack Coat m2 209,120.00


(Cationic Emulsion grade CRS1
at 0.3-0.5litre/m2)
BITUMINOUS SURFACING
2D.03 506(1) Asphalt concrete in wearing m2 209,120.00
course 50mm compacted
thickness
Sub Bill No. 2D Carried to Summary

SUB BILL No.2E : BRIDGES, CULVERTS AND OTHER STRUCTURES


STRUCTURES -BRIDGES
2E.01 303(3) Providing & maintaining of a Allow Item P.S 300,000.00
temporary by-pass to
accommodate the traffic flow
during the construction, and
removing of the same after
completion of new bridge.
2E.02 202(1) Removal and disposal of Allow Item PS 150,000.00
existing structure including
foundation in the area under
new foundation and
transporting the reusable
material to a place within 10
km as directed and stacking the
same after completion of the
by-pass.
2E.03 302(10) Construction of necessary Allow Item P.S 150,000.00
cofferdams cribs sheeting,
shoring and bracing and their
subsequent removal.

64
2E.04 302(11) Dewatering Allow Item P.S 100,000.00
2E.05 302(8) Back fill with approved soil m3 192.00
type 1 with proper layer
compaction as directed by
engineer
2E.06 302(2) Excavaiton for foundation in m³ 800.00
marshy soil

2E.07 302(9) Providing sand filling. m³ 128.00

2E.08 1001(4) Mixing & laying 1:3:6 (37.5 m³ 74.00


mm) for foundation slab

2E.09 1008(1) Form work smooth finish m2 760.00


using plywood (shutter 15mm)
and class 11 timber bearers and
joists and jungle timber props
for bridge abutment,wingwalls
etc.
2E.10 1002(1) Supply and fabricate Tor steel Ton 18.00
Grade 460 reinforcement as
per drawing
2E.11 1001(4) Concrete grade 30 for box m³ 203.00
bridge as per drawing
including vibrator
2E.12 1406(7) Painting with enamal 2 coats to m2 44.00
parapets

2E.13 1406(8) Painting and stenciling figures Nos 8.00


and letters as either side of
parapet
2E.14 Supplying fixing & Nos 24.00
whitewashing to guard stones
on retaining walls.
CONSTRUCTION OF BRIDGE AND CAUSEWAY
2E.15 302(11) Dewatering LS

2E.16 202(2) Dismantle and removal of Cum 300.00


Concrete Structures

65
2E.17 302(5) Excavaiton in unclassified soil Cum 870.26
and back filling with suitable
material for structures
2E.18 302(8) Back fill with Granular Cum 90.85
Material

2E.19 304(2)a Embankment Construction Cum 122.76


TypeII

2E.20 405(1) Dense Graded aggregate base Cum 7.86


(Under approach slab)

2E.21 705(1) Aggregate backfill Cum 87.24

2E.22 705(2) Filter medium Cum 8.20

2E.23 705(3) Impervious layer Cum 20.38

2E.24 706(1) Weep holes using type 600 lm 88.22


PVC pipes of 75 mm dia.

2E.25 502(2) Bituminous tack coat Using sqm 218.06


CRS 1 at a rate of .5 liter per
sqm
2E.26 Asphalt concrete inwearing sqm 218.06
course 50mm Thick

2E.27 New kerbs in bridges lm 54.00

2E.28 Bridge lower kerbs lm 33.00

2E.29 1001(1) Grade 15/40 Blinding Concrete Cum 5.56

2E.30 1001(4) Grade 30/20 concrete for Cum 210.98


capping beams, deck, cuirtain
walls, ballast wall etc.

66
2E.31 1001(6) Grade 40/20 concrete for deck Cum 87.57

2E.32 1002(1) Supplying, bending and laying Ton 11.70


Tor steel (460 N/mm2 ) as
reinforcement
2E.33 1008(1) Formwork, smooth finish sqm 311.26

2E.34 1008(2) Formwork, rough finish sqm 384.17

2E.35 1009(1) Expansion joints lm 24.00

2E.36 1010(2) Bearing pads width 75mm and lm 43.20


12mm thick

2E.37 1012(1) Stainless steel dowels as nr 25.00


shown on drawing

2E.38 1013(1) Bituminous sealing belt lm 43.20

2E.39 1015(1) Polythene displacers as shown lm 285.00


on drawings

2E.40 1016(1) Formimg of service duct in the lm 54.00


deck as shown on drawings

2E.41 1017(1) Cover slabs for service ducts nr 108.00


as shown on drawing

2E.42 1018(1) Pre-cast reinforced concrete lm 38.48


a railing & uprights as shown on
drawing
2E.43 1403(7) Pre-cast reinforced concrete sqm 77.94
railing & painting

2E.44 1019(1) End pillasters as shown on nr 4.00


drawing

67
2E.45 1020(1) 50mm dia PVC drain pipes nr 14.00
a fixed through service duct as
shown on drawing
2E.46 1020(1) 110mm dia PVC drain pipes nr 14.00
b fixed through service duct as
shown on drawing
2E.47 1001(3) Concrete Grade 25(20) Cum 385.63
b

2E.48 1003(1e Pre Cast pre-stressed beam nr 22.00


)& 16.5m long
1003(2e
)
2E.49 Painting Structure sqm 24.19

2E.50 Culvert& Bridge numbering nr 2.00

Hume Pipe Culvert at causeway 3 raw 15 numbers

HUME PIPE CULVERT AT CAUSEWAY 3 ROWS 15 NUMBERS


2E.51 707(7) 900mm hume pipe 4ft nr 1,372.00

2E.52 707(7) Collar nr 1,080.00

2E.53 1001(1) Concrete Grade 20(20) m3 1,537.55

2E.54 1008(2) Formwork m2 5,416.93

2E.55 Fixing concrete encased Hume nr 1,372.00


pipe using crane

2E.56 Repairing and extend Bridge to PS Item Allow 100,000,000.00


required size

68
STRUCTURES -CULVERTS AND OTHER RETAINING
STRUCTURES
2E.57 402(1) Earth filling for approaches and m3 87.00
carriageway

2E.58 301(5) Allow for Bailingout water P.S Item Allow 16,500.00

2E.59 302(6) Providing coffer damming with P.S Item Allow 120,000.00
Item Sand bags and subsequent
removal

2E.60 301(16) Breaking Road surface m2 45.00

2E.61 202(1) Demolishing R.R Masonary m3 42.94

2E.62 202(2) Demolishing reinforced concrete m3 14.19

2E.63 301(14) Excavaiton in Marshy soil m3 319.21

2E.64 Minimum 750mm sand filling m3 65.00


beused under bottom of slab &
compacted well.
2E.65 1001(3) 75mm thick screed concrete m3 7.00
1:3:6(37.5mm) in bottom of
excavaiton
2E.66 1008(1) Form work smooth finish with m2 388.92
class 2 timber for bridge beams,
bridge deck under sides including
dismantling
2E.67 1001 (3) Concrete grade 30(20) for drop m3 76.00
walls,walls,slab.

2E.68 1006 (3) Rendering 19mm thick 1:3 Ct. m2 15.50


sand motor

2E.69 Painting and stenciling figures Nos. 6.00


and letters on either side of
parapet

69
2E.70 808(5) Precast Concrete guard stones Nos. 16.00
supplied and fixed.

2E.71 1021(1) Fabricate & lay for steel as M.Ton 6.39


reinforcement (Details annexed)

2E.72 Construction of Bridge at PS Item Allow 300,000,000.00


Causeway 200M long 11 m width

2E.73 Repairing and extend Bridge and PS Item Allow 50,000,000.00


Culvert to required size

RETAINING WALL STRUCTURE AT 23RD KM


2E.74 302(2a) Approved Earth filling between m3 468.75
retaining wall and road platform
and the earth to be compacted
well in layers of 150 to 225mm.
2E.75 302(2) Excavaiton in Marshy soil m3 825.00

2E.76 302(6) Providing coffer damming with P.S Item Allow 150,000.00
Item Sand bags and subsequent
removal

2E.77 1008(1) Form work smooth finish with m2 4,002.38


class 2 timber for bridge beams,
bridge deck under sides including
dismantling
2E.78 1001(3) Concrete grade 15(40) m3 1,487.50

2E.79 Supplying fixing & whitewashing Nos. 834.00


to guard stones.

2E.80 '705(1) 50-200mm. dry stone lining m3 150.00


behind abutment & wingwalls as
per drawing.
2E.81 705(2) 75mm. thick 40mm. stone filter m3 0.60
layer behind dry stone lining as
per drawing.

70
2E.82 '705(3) Clay puddled & laid behind m3 150.00
abutments & wingwalls to form
the impervious layer as per
drawing.
2E.83 808(2) Forming weep holes in vertical lm. 334.00
wall using 75mm dia. P.V.C. pipes
and finished smooth with
dripledge and surround complete
.
2E.84 Repairing and extend Bridge and P Sum Item Allow 45,000,000.00
Culvert to required size

Sub Bill No. 2E Carried to Summary

Sub Bill No.2F : INCIDENTAL WORKS


TOP SOILING
2F.01 801(1) Furnish, Spread and compact top m2 41,200.00
soil

GRASSING
2F.02 802(1) Grass sodding(Excluding royalty, m2 41,200.00
transport and watering and
maintenance)
RIP RAP PROTECTION FOR EMBANKMENT SLOPES
2F.03 1006(2) Embankment construction using m3 3,000.00
rock fill (1 - 50 kg )

2F.04 Embankment construction using m3 9,600.00


rock fill (100 - 250 kg )

2F.05 804(1) Embankment construction using m3 6,000.00


rock fill (0.25 - 0.75 kg )

ROAD MARKING
2F.06 Application of Road markings as m2 6,985.00
per specification edge line, Centre
line of 100 mm width, 3 mm thick,
using Road marking paints ,

71
2F.07 Application of Road markings std m2 1,158.00
pedestrian crossing using thermo
plastic paints, (Yellow) inclusive
barricading
2F.08 Providing & fixing yellow studs on Nos. 1,120.00
Pedestrian crossing

2F.09 Providing & fixing white studs on Nos. 4,170.00


Centre line.
ROAD SIGNS
2F.10 811(1) Single pole, sign area up to 0.5m2 nr 210.00

2F.11 811(2) Double pole, sign area up to 2.0m2 nr 75.00

2F.12 811(3) Chevron warning sign nr 55.00

KILOMETER POSTS
2F.13 819(1) Provide ,Install and paint new nr 28.00
kilometre post
STREET LIGHTING
2F.14 Provide street lighting PS Item Allow 2,500,000.00

Sub Bill No. 2F Carried to Summary

Bill No. 03: Rehabilitation of Jaffna-Ponnalai-Point pedro Road (14+50


- 29+05 km), (30+50 - 36+50 km) & (41+00 - 54+60 km)
Sub Bill No.3A : SITE CLEARING
CLEARING AND GRUBBING
3A.01 201(1) Clearing and grubbing m2 244,100.00

REMOVAL OF STRUCTURES &


OBSTRUCTIONS
3A.02 202(1) Demolishing dry coursed m3 1,000.00
masonry including stacking or
loading

72
3A.03 202(1) Demolishing coursed masonry m3 1,000.00
a in cement mortar including
stacking or loading
3A.04 202(1) Demolishing random rubble m3 500.00
b masonry in cement mortar
including stacking or loading
3A.05 202(1) Demolishing reinforced cement m3 500.00
concrete and debries cleaned.
3A.06 202(3) Remove fencing (Provisional l.m 20,000.00
Quantity)
Sub Bill No.3A Carried to Summary
Sub Bill No.3B : EARTH WORKS
ROADWAY EXCAVAITON
3B.01 301(4) Roadway excavaiton in m3 60,560.00
unclassified soil(cutting
measurement)loading &
transport up to 3km
EMBANKMENT
CONSTRUCTION
3B.02 304(1) Trim, level and compact m2 250,200.00
Original ground 95%std.

3B.03 304(2) Embankment construction, m3 48,009.00


Type 1

3B.04 304(3) Embankment construction, m3 18,616.00


Type 2

3B.05 304(4) Providing & place geo fabric m3 64,650.00


(weight of fabric minimum
500g/m2)
3B.06 304(4) Embankment construction m3 62,580.00
using Rock fill (1-10Kg)

3B.07 304(4) Embankment construction m3 16,640.00


using Rock fill 1-50Kg)

3B.08 304(4) Embankment construction m3 16,192.00


using Rock fill (100-250Kg)

73
3B.09 304(4) Embankment construction m3 22,244.00
using Rock fill (.25T -.75T)

CHANNEL EXCAVAITON
3B.10 307(1) Channel excavaiton, suitable m3 7,200.00
soil

3B.11 307(3) Channel excavaiton, soft rock m3 1,440.00


(Provisionl Quantity)

3B.12 307(4) Channel excavaiton, unsuitable m3 5,760.00


soil

Sub Bill No.3B Carried to Summary

Sub Bill No.3C : SUB BASE, BASES AND SHOULDERS


GRANULAR PAVEMENT
3C.01 401(1) Sub base as compacted in position m3 57,063.50

3C.02 307(5) Sub base as constructed using Geo m2 24,000.00


grid layer or Geotextiles

3C.03 405(1) Dense graded aggregate base m3 59,772.00


minimum 200 mm thickness

3C.04 408(1) Scarify and Remove existing m2 119,525.00


bitumen layer

3C.05 SHOULDERS
3C.06 409(1) Earthen shoulder as compacted in m3 22,197.50
position

Sub Bill No.3C Carried to Summary

74
Sub Bill No.3D :SURFACING
PRIME COAT AND TACK COAT
3D.01 501(5)b Bituminous Prime Coat using CSS - m2 298,860.00
1 at 1 litre per m2

3D.02 502(1) Bituminous Tack Coat (Cationic m2 298,860.00


Emulsion grade CRS1 at
0.5litre/m2)
BITUMINOUS SURFACING
3D.03 506.2a Asphalt concrete in wearing m2 298,860.00
course 50mm compacted
thickness

Sub Bill No.3D Carried to Summary

Sub Bill No.3E : BRIDGES, CULVERTS AND OTHER STRUCTURES


CONSTRUCTION OF 10 NoS. 1.5 M X 1.0 M SINGLE CELL BOX CULVERT
3E.01 202(2) Demolishing reinforcement PS 200,000.00
concrete
3E.02 301(14) Excavaiton for foundation in m3 280.00
unclassified soil

3E.03 302(11) Dewatering. PS 500,000.00


3E.04 1001(4) Mixing and laying 1:3:6(19mm) m3 9.00
concrete as screed to Drop wall
and Bottom slab
3E.05 1001(4) Mixing & Laying Gr 30 Concrete to m3 157.00
Dropwall and Culvert

3E.06 1008(1) Formwork smooth finish for m2 867.00


general purpose using 25 mm
thick planks & struts of class 11
timber and round jungle timber
props 100 -150 mm dia including
dismanting
3E.07 1002(1) Fabricate & lay tor steel as Kg 27,340.00
Reinforcement

75
3E.08 304(2) Approved soil (Type I & II m3 50.00
materials) excavaiton using
machinery for backfilling
construction including loading and
piling.
3E.09 304(2) Approved soil spread and m3 50.00
compacted Machine Rammer in
Narrow places.
3E.10 808(5) Casting St type Guard stones in No 80.00
Concrete (1:2:4) 19mm & cement

3E.11 808(5) Fixing new Guard stones in No 80.00


225mm thick cement concrete
1:3:6 (37.5 mm ) and cement 219
Kg/cu.m with minimum cover 75
mm x 300 mm depth
3E.12 White washing ,two coat to Guard No 80.00
stones

CONSTRUCTION OF 05 NoS. 2.5 M X 1.0 M SINGLE CELL BOX CULVERT


3E.13 202(2) Demolishing reinforcement PS 160,000.00
concrete
3E.14 301(14) Excavaiton for foundation in m3 328.00
unclassified soil

3E.15 302(11) Dewatering. PS 400,000.00


3E.16 1001(4) Mixing and laying 1:3:6(19mm) m3 7.20
concrete as screed to Drop wall
and Bottom slab
3E.17 1001(4) Mixing & Laying Gr 30 Concrete to m3 168.80
Dropwall and Culvert

3E.18 1008(1) Formwork smooth finish for m2 775.20


general purpose using 25 mm
thick planks & struts of class 11
timber and round jungle timber
props 100 -150 mm dia including
dismanting
3E.19 1002(1) Fabricate & lay tor steel as Kg 29,288.00
Reinforcement

76
3E.20 304(2) Approved soil (Type I & II m3 40.00
materials) excavaiton using
machinery for backfilling
construction including loading and
piling.
3E.21 304(2) Approved soil spread and m3 40.00
compacted Machine Rammer in
Narrow places.
3E.22 808(5) Casting St type Guard stones in No 80.00
Concrete (1:2:4) 19mm & cement

3E.23 808(5) Fixing new Guard stones in No 80.00


225mm thick cement concrete
1:3:6 (37.5 mm ) and cement 219
Kg/cu.m with minimum cover 75
mm x 300 mm depth
3E.24 White washing ,two coat to Guard No 80.00
stones

CONSTRUCTION OF 08 Nos. 3.0 M X 1.3 M SINGLE CELL BOX CULVERT


3E.25 202(2) Demolishing reinforcement PS 160,000.00
concrete
3E.26 301(14) Excavaiton for foundation in m3 520.00
unclassified soil

3E.27 302(11) Dewatering. PS 400,000.00


3E.28 1001(4) Mixing and laying 1:3:6(19mm) m3 13.60
concrete as screed to Drop wall
and Bottom slab
3E.29 1001(4) Mixing & Laying Gr 30 Concrete to m3 272.00
Dropwall and Culvert

3E.30 1008(1) Formwork smooth finish for m2 1,069.60


general purpose using 25 mm
thick planks & struts of class 11
timber and round jungle timber
props 100 -150 mm dia including
dismanting
3E.31 1002(1) Fabricate & lay tor steel as Kg 30,056.00
Reinforcement

77
3E.32 304(2) Approved soil (Type I & II m3 64.00
materials) excavaiton using
machinery for backfilling
construction including loading and
piling.
3E.33 304(2) Approved soil spread and m3 64.00
compacted Machine Rammer in
Narrow places.
3E.34 808(5) Casting St type Guard stones in No 80.00
Concrete (1:2:4) 19mm & cement

3E.35 808(5) Fixing new Guard stones in No 80.00


225mm thick cement concrete
1:3:6 (37.5 mm ) and cement 219
Kg/cu.m with minimum cover 75
mm x 300 mm depth
3E.36 White washing ,two coat to Guard No 80.00
stones

CONSTRUCTION OF 05 NoS. 2.0 M X 1.7 M TWIN CELL BOX CULVERT


3E.37 202(2) Demolishing reinforcement PS 100,000.00
concrete

3E.38 301(14) Excavaiton for foundation in m3 510.00


unclassified soil

3E.39 302(11) Dewatering. PS 250,000.00

3E.40 1001(4) Mixing and laying 1:3:6(19mm) m3 11.00


concrete as screed to Drop wall
and Bottom slab
3E.41 1001(4) Mixing & Laying Gr 30 Concrete to m3 216.50
Dropwall and Culvert

3E.42 1008(1) Formwork smooth finish for m2 872.00


general purpose using 25 mm
thick planks & struts of class 11
timber and round jungle timber
props 100 -150 mm dia including
dismanting
3E.43 1002(1) Fabricate & lay tor steel as Kg 31,250.00
Reinforcement

78
3E.44 304(2) Approved soil (Type I & II m3 65.00
materials) excavaiton using
machinery for backfilling
construction including loading and
piling.
3E.45 304(2) Approved soil spread and m3 65.00
compacted Machine Rammer in
Narrow places.
3E.46 808(5) Casting St type Guard stones in No 70.00
Concrete (1:2:4) 19mm & cement

3E.47 808(5) Fixing new Guard stones in No 70.00


225mm thick cement concrete
1:3:6 (37.5 mm ) and cement 219
Kg/cu.m with minimum cover 75
mm x 300 mm depth
3E.48 White washing ,two coat to Guard No 70.00
stones

CONSTRUCTION OF 04 Ns. 3.0 M X 1.7 M TWIN CELL BOX CULVERT


3E.49 202(2) Demolishing reinforcement PS 0.00 80,000.00
concrete
3E.50 301(14) Excavaiton for foundation in m3 616.00
unclassified soil

3E.51 302(11) Dewatering. PS 200,000.00


3E.52 1001(4) Mixing and laying 1:3:6(19mm) m3 12.40
concrete as screed to Drop wall
and Bottom slab
3E.53 1001(4) Mixing & Laying Gr 30 Concrete to m3 254.40
Dropwall and Culvert

3E.54 1008(1) Formwork smooth finish for m2 841.60


general purpose using 25 mm
thick planks & struts of class 11
timber and round jungle timber
props 100 -150 mm dia including
dismanting
3E.55 1002(1) Fabricate & lay tor steel as Kg 34,584.00
Reinforcement

3E.56 304(2) Approved soil (Type I & II m3 60.00


materials) excavaiton using
machinery for backfilling

79
construction including loading and
piling.

3E.57 304(2) Approved soil spread and m3 60.00


compacted Machine Rammer in
Narrow places.
3E.58 808(5) Casting St type Guard stones in No 80.00
Concrete (1:2:4) 19mm & cement

3E.59 808(5) Fixing new Guard stones in No 80.00


225mm thick cement concrete
1:3:6 (37.5 mm ) and cement 219
Kg/cu.m with minimum cover 75
mm x 300 mm depth
3E.60 White washing ,two coat to Guard No 80.00
stones

3E.61 808(5) Precast Concrete guard stones Nos. 3,500.00


supplied and fixed.

3E.62 1406(3) Repairing and extend Bridge and PS Item Allow 150,000,000.00
1303(1) Culvert to required size 3 nos
Sub Bill No.3E Carried to Summary

Sub Bill No.3F : INCIDENTAL WORKS


TOP SOILING
3F.01 801(1) Furnish, Spread and compact top m2 78,000.00
soil

GRASSING
3F.02 802(1) Grass sodding(Excluding m2 78,000.00
royality,tranport and watering and
maintenance)
ROAD MARKING
3F.03 810(1) Application of Road markings as m2 9,075.50
per specification edge line,Centre
line of 100 mm width and std
pedestrian crossing, 3 mm thick,
using Road marking paints
3F.04 810(1) Application of Road markings m2 2,933.00
yellow lines using thermo plastic
paints inclusive barricading

80
3F.05 810(3) Providing & fixing studs on Nos. 5,784.00
Pedestrian crossing & Centre line

ROAD SIGNS
3F.06 811(1) Single pole, sign area up to 0.5m2 PS Item Allow 2,500,000.00
3F.07 811(2) Double pole, sign area up to 2.0m2 PS Item Allow 1,200,000.00
3F.08 811(3) Chevron warning sign PS Item Allow 1,200,000.00
3F.09 KILOMETRE POSTS
3F.10 819(1) Provide, Install and paint new Nos. 34.00
kilometre post

Sub Bill No.3F Carried to Summary

Bill No. 04: Rehabilitation of Jaffna Mainipay Karainagar Road


Sub Bill No 4A- Site Clearing
Allow for demolishing/ Rebuilding
4A.01 PS Allow
structures as directed 4,000,000.00

Clearing and Grubbing within the


construction boundary including
4A.02 201 m2
removel of trees,stumps,roots and 148,200.00
other obstructions as directed
Sub Bill No. 4A Carried to Summary

Sub Bill No 4B- Earth Works

4B.01 301 Excavaiton in Medium soil m³


37,050.00

Trimming,Levelling and Compact


4B.02 304 m2
Original Ground to 95% 148,200.00

Trimming,Levelling and Compact


4B.03 304 m2
Original Ground to 100% 123,500.00

Embankment construction, Type 1,


4B.04 304 m3
using borrow material 19,320.00

Sub Bill No. 4B Carried to Summary

81
Sub Bill No 4C- Subbase ,Base and Shoulders
Approved soil Excavaiton, spread &
compaction using machinery for
4C.01 401 m³
Subbase construction including 37,050.00
loading & piling. Trans dist.140 km
Approved soil spread & compaction
using machinery for Shoulder
4C.02 401 construction including loading & m3
12,350.00
piling.
Trans dist. 140 km
Scarifying Road Surface To 50 mm
4C.03 408(2) m2
depth by roller 123,500.00
Dense graded Aggregate Base
spreading watering and compacting
4C.04 409 graded 37.5mm aggregate to form m³
46,683.00
dense aggregate base using machinary
.Trans .Dist 205 km
Sub Bill No. 4C Carried to Summary
Sub Bill No 4D- Surfacing
Prime coat with Emulsion CSS1 using
1 ltrs/sqm including blinding with
4D.01 501 m2 222300
sand & Transport of bitumen ave 400
km
Tack coat with with CSS1 @ 0.75
4D.02 502 ltrs/sqm including Transport bitumen m2 249300
ave 400km

Supply, Lay and Compact Asphalt


4D.03 506 Concrete Wearing course material m2 261765
using paver

Sub Bill No. 4D Carried to Summary

Sub Bill No 4E : Bridge & Culverts (33 Nos)


EARTH WORKS FOR BRIDGES AND CULVERTS
Providing And Maintaining By pass road
with fixing one hume pipe and Removing
4E.01 103(2) Allow Item PS
after finishing the work as directed by 800,000.00
engineer

Removal of existing structure as directed


4E.02 202(2) Allow Item PS
by Engineer 2,000,000.00

4E.03 302(6) Providing coffer dam Allow Item PS


100,000.00

82
4E.04 302(11) Dewatering during Work Allow Item PS
100,000.00

Back fill with approved soil type 1


4E.05 302(8) (gravel)with proper layer compaction as m3
1,987.60
directed by engineer

FOUNDATION AND STRUCTURES

4E.06 302(2) Excavaiton for foundation in marshy soil m³ 6135.7

4E.07 302(9) Providing sand filling. m³ 1112.1

Mixing & laying 1:3:6 (37.5 mm) for


4E.08 1001(2)
foundation slab
m³ 706.2

Form work smooth finish using plywood


(shutter 15mm) and class 11 timber
4E.09 1008(2) m2 7497.93
bearers and joists and jungle timber props
for bridge abutment,wingwalls etc.

Supply and fabricate Tor steel Grade 460


4E.10 1002(1)
reinforcement as per drawing
Ton 172.3

Concrete of Grade 30 (19mm) using


4E.11 1001(2) concrete mixer(W/baching) for box bridge m³ 1888.3
as per drawing including vibrator

Painting white back ground and stenciling


4E.12 1406(8)
figures and letters as 3/1
Nos 66

Sub Bill No. 4E Carried to Summary

Sub Bill No 4F : Drainage & Retaining Wall


DRAIN CONSTRUCTION
Excavaiton in Pitch Trench for
4F.01 302(2) m3 6615
foundation in medium soil

Form work smooth finish using


plywood (shutter 15mm) and class 11
4F.02 1008(2) m2 24360
timber bearers and joists and jungle
timber props for Side drain

Mixing & Laying lean concrete of


4F.03 1001(2) m3 567
1:3:6 (37.5mm)

83
Supply and fabricate of reinforcement
4F.04 1002(1) ton 382.16
as per drawing

Concrete of grade 25 (19mm) for side


4F.05 1001(2) drain& cover slab as per drawing m3 3908
including vibrator (Tpt 205km)

4F.06 1001(11) Curing of Concrete slab & drain m2 329469

Supply and Laying precast slab (450


4F.07 806 m2 2000
mm*450 mm*50 mm)

4F.08 807 Supply and Laying precast Kerbs LM 2000

RETAINING WALL

4F.09 302(2) Excavaiton in foundation m3 2025

4F.10 302(8) Back fill with Type 01 soil m3 2025

Laying screed concreting Grade - 15


4F.11 1001(3) m3 253.125
(37.5mm)

Laying Mass concreting Grade - 15


4F.12 1001(2) m3 4175
(19mm)

4F.13 705(3) Clay Puddle (Transport : 175 km) m3 450

Weep hole, 100mm dia. PVC pipe


4F.14 706(1) LM 500
(Type 600)

Aggregate back fill material 50-


4F.15 705(1) m3 225
200mm

4F.16 808(5) Fixing Guard stones Nos 810

84
Sub Bill No. 4F Carried to Summary

Sub Bill 4G Incidencial Construction

4G.01 811(1) Single pole,sign area upto 0.5 m2 Nos 200.00

Single pole,multiple sign area upto 1


4G.02 811(1a) Nos 20.00
m2

4G.03 811(2) Double pole sign area upo 2.0 m2 Nos 15.00

4G.04 811(3) Chevron warning sign Nos 50.00

Provide,install & paint new kilometer


4G.05 819(1) Nos 27.00
post

Road Marking center line 100 mm


4G.06 810(2) sq.m 7,200.00
width using thermoplastic paints

Road Marking edge line thermoplastic


4G.07 810(2) sq.m 2,080.00
paints

Road marking pedestal crossing


4G.08 810(2) sq.m 1,800.00
thermoplastic paints

4G.09 810(3) Road studs Nos 4,000.00

4G.10 Allow for providing Street lighting PS Allow


30,000,000.00
Allow for providing Signalization for
4G.11 PS Allow
important junctions 20,000,000.00

Sub Bill No. 4G Carried to Summary

85
Bill No.5 : DAY WORKS
5.01 Surveyor Hr 900.00

5.02 Laboratory Technician (skilled) Hr 700.00

5.03 Carpenter Hr 1,300.00

5.04 Mason Hr 1,300.00

5.05 Steel Fixer Hr 600.00

5.06 Semi-skilled workman Hr 1,400.00

5.07 Unskilled workman (labourer) Hr 1,400.00

5.08 Bowser, water, up to 6,000 litres Hr 1,720.00


with Spray Bar

5.09 Backhoe, wheeled, 50 - 100 HP Hr 1,720.00

5.10 Backhoe, tracked, 50 - 100 HP Hr 1,720.00

5.11 Motor grader, 120 to140HP Hr 1,720.00

5.12 Mobile Crane 25 tonnes Hr 1,720.00

5.13 Water pump with hoses, 50 to 100 Hr 1,720.00


mm outlet

86
5.14 Concrete mixer, over 0.50 cu.m. Hr 1,720.00

5.15 Generator, 10 to 50 KVA Hr 1,720.00

5.16 Poker Vibrator, petrol driven Hr 1,720.00

5.17 Bituminous Emulsion CSS-1 Ltr. 6,300.00

5.18 Sand Cu.m 6,300.00

5.19 Aggregate base course Cu.m 6,300.00

5.20 Aggregate 5-20mm Cu.m 6,300.00

5.21 Cement kg 6,300.00

5.22 60/70 Bitumen Ltr. 6,300.00

5.23 Reinforcement kg 6,300.00

5.24 Diesel Ltr. 6,300.00

5.25 Bitumen MC30 Ltr. 6,300.00

Bill No. 5 Carried to Summary