1) The document appears to be a bill of quantities for drilling shallow tube wells with details on 3 types: shallow tubes wells, shallow tube wells with average depth, and deep tube wells. 2) It includes 2 line items - one for drilling the shallow tube wells using a 100mm diameter cutter, and one for concrete platform construction. 3) Quantities, unit rates, and total prices are provided for each line item.

Uploaded by

Raju Ahammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views10 pages

HDPE Rate - NEW PDF

1) The document appears to be a bill of quantities for drilling shallow tube wells with details on 3 types: shallow tubes wells, shallow tube wells with average depth, and deep tube wells. 2) It includes 2 line items - one for drilling the shallow tube wells using a 100mm diameter cutter, and one for concrete platform construction. 3) Quantities, unit rates, and total prices are provided for each line item.

Uploaded by

Raju Ahammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

x

t $ecfi*rr S" *ill of exantifies


d
)
I
1 1) ShailowTube$Ell (6 r";
2) Shallow Tara Tuberrrrell,( l:-*,Average depth
Av"rig" O"ptt-Oi
Olm) = ,a rr"
3) Deep Tuber,r,eu (6 No. pump, rrrs, j#ir
frer"nl f = ;f,l}"=
Total = 5g Nos
I
I

Table
Nann: Bili of Quantities

.'o"rn - ; ltem
Group Code(if
i Unit Total Toti
no IlescriB-ion of ftem i Meait rerEnt qu".rtitv Unit ftice (ln figr,rres: i Pric" Price Pric
il anYl i
, -":' -: .
:

BDT)
- (ln
:\rrcrdsr (ln
0n
, figuresr U,lDfd
A MA il,l1A 6no Shallow Tubewell BDT) BDT) BDT
rfvA 0.001

MA MA Transportation of all
13
kinds of departmental ;
and contractors i
malerials or equipments j
to the site for installation

.d
l

supplying of casing pipe


oorrng pipe construction
.of
derrick and
,

i
i
.{pr
dismantling the same i

cleaning the site after


completion of the work i

departmental rnalerials
t) to the departmedal I

store etc All complete as ,

,. Engineer in Charoe ;

:.2 i\vA
-
Boring & Orilfng e;iins ,p/;
by usinq 100
.diameter
mm - ,
793
cr-rtter with 38
mm dia Gl pipe and .
other equipments
capable of drillirg up to
:

i1 required depth to install


!i 38mm dia shallow TW
by water jet meftrod or
,,rs
:

rnethod approved by the


EIC tlrrorgh all sorti
strata pea gravel
interferenceprotection
of
r
j

r 4,-'
l
of cavirg in by supplying :

necessary MS casirrq .

pipe and use of


'bentonile
slurry or
:similar collection of soil
:

samples at errery 3 m
rnterval in a white
,polythine bag or wooden ,
compartmental box and j
,preserving them for :

analysis withdrawdl of :
boring pipes ard casing
pipes etc complete
lowering the materials
as mentioned in part A
for installation of all
tubewefls as per 1

drawing specification
and direction of the EIC
1
from0point0mto6l I

point 00 m
.,'...'''',,,.'.,,.',..',',.,,,,
:-"i'
MA ive :Platform iLS 13
: ConstructionCorstruction r

concrete 1 ralia? |

'of
rratio 4 platform with
,75mm brick soling by I
i supplying the rrecessary

rmaterials such as 2
I
: bags cement 1st class
brick 1st class khoa
, coarse sand incltLding

:labour clarge to sene


,the purpose ircluding 12
, mm thick plaster 1 ratio

,4 with net cement


,
finishing of thconcrete
surfaces, SupplyirE and
Fixation of Geo Code
'plate Marble or Stone
, Plate of 300 x 150 x 12
poirlt 50mm on the
,visible surface of the
platform The total depth
, installation date arrd

I abbreviated project

iname DPHE VWSP and


lD tlo has to be written
: in on the plate of the
,platform The whole work
, has to be done as per

I specification drawirE

, 'and direclion of the EIC


NYA '-
iNA Fittirg and fixation of no ;LS 13
6 hard pump Fitting ard i
fixation of no 6 hard
pump supplied from
departmental store and
complete developnent
of the tube well to get
sand odour and turbidity
free drinking water at a
satisfactory yield the
tube well have to pump
continuously to get the
target quality of water
etc All complete as per
specificatiors and
t

5 MA ;vn
':_- "
dilgglioj ell!9- Elg
Collection of water
: 2Cr I i"--
:P/Test il
i :._......
sample and Testing After i

)l well
ensuring proper i
development collect the r

and
water samples i
to
sending the samples i
the DPHE Zonal :

Laboratoryfor testing of i
Arsenic lron Cfdoride
parameters wNch will be.i
tested at the laboratory i
The cost of sampling
the
.

carryirq to 1
r
I
I

laboratorY and testing bY:


DPHE laboratory has to i
be done bY the :

clntlaclo-l
o* i"r, sn fro*
:

0.001
NI/A NYA ,lvA
Tubewell I

NUA NA TransPortalion of all of LS 20


3, o,o,afi
contrabtors materials
equiPments to the site :

for installation of 75mm


x 38mm dia Tube Well
with suPPlYing of casing :

oioe borirrg PiPe

and dismantling tle i

same cleaning the site i

after comPletion of work I

restore tlP unused t,

departmentalmaterials i

to the store etc All ,

comPlete as Per i

direction of the Engineer

I\UA Boring to install 75mm x NA


3a mm dia Shallow Tara
:

system Tube well bY


usino 1SOmm diameter
cdtJr with 38 mm dia Gl
pipe and other
equipments caPable ot
drilling uP to required
depth bY water jet
method or anY other
method aPProved bY the :

EC through all sorts of ,

interfererrce Protection i

of caving in bY supPlying '

necessary MS casitq
pipe and use of
lberrtonite slurrY or
similar collection of soil
samPles at every 3 m
interval in a white
polything bag wooden .

comPartmental box and


oreserving them for
analvsis withdrawal of
boring PiPes and casing
pipes etc comPlete. .
lowering the materlals
as mentioned in Part A
for installation of all
tubewells as Per
drawing sPecification

i (tfi
and direction of the EC

Za tUA NU^ is*"l oi, uJP"i w"ir ,Pr'


"casing ( 0m to 30 m)

'b 38 ,rn Dia Lower well 'P/m


'l;,;$,g";fr;
2b NIA f\l/A
)
casing (30 m to 61 m ;

NA NA Fitting and fixation of ro LS 20 ZEob'L


ry't
6 hand PumP Fixing the
dePartmental materials
rirentioned in Part A and
with suPPlYing other
necessary materials :

slrch as 100mm dia zero I


, point 3m long MS hotdiP

:galvanised Stand Rod


, Fbad Piston Rod Pivot

,Pivot Pin Cotter Pin


,Piston Plate Baket
Flower Plate Grommet
,lntermediate Flange
rBottom Flange Stand
,Pipe Bottom Lug 4 inch
,Centralizer Guset Nut
,Boh etc complete
i
,develop of the tr.rbe well '|

Ito get sand odour and


.turbidlty free drinking t

twater at a satisfactory
yield The tube well have t

iio pump continuouslY to i


l
]

,get tfre hrget qualitY of i


1

:water etc all complete i I

I
as per specifications and i l
dileglion of lhe .c .,
(ra-bt:
i

MA
:PlatformConstraction ;t- S izo
Construction of concrete i -€-,Ll
(1 by 2 by 4) Platform i

'with 75mm brick soling ,

supplyrns the necessarY l

materials such as
cement (3 bags) 1st
class brick 1st class
khoa coarse sand
r includirg [abour charge

'to serve the purPose


'irrcluding 12 mm thick
plaster (1by4) with net
:cement finishing of the
concrete surfaces
; Supplying and Fixation

,of Geo Code plate


(Marble Stone Plate
; 300x1 50x1 2 point

50mm) on the visible


surface of the platform
1
iThe total depth
:installation date ard
; abbreviated project

, name DPHE VWSP and


,lD I.l: has to be written
iin on the plate of tte
;platform The wlrole work
'
has to be done as Per
:specification and
:
drawirg and instruction
of the EC
,------ .i --
-*i
NttA itvA . Collection'of water
,sample ard testing After
:P/test ieo
,- . -A-6t[ :i*-
:'i
,: . ...
i--
i;......

---:l
,ersuring proper well
, development collect the

,water samples and


isending the samples to
/ the DPHE Zonal
: Laboratory for testing of
: A,rsenic lron Chl<xide
lpararneters which will be
,tested at the laboratory
:The cost of samPling
, carrying to the

,laboralory and testirq bY


DPHE taboratory has to
:be dore by the
'contractor

lJ
NyA iruA 6no Deep Tubewell :NUA
r 0.00'1
:ii
,,,',,,',,,,'',,,, j''''. -,.,', "-:-
;

-'.''..',,','.
tzs
ii
f.l/A .Vn Transportation of all i LS
kinds of departmental
and contractors
\ffo6ft,::t
materials or equipments
to the site for irctallation
of Tube Well with
supplying of casirg pipe
borirg pipe conslruction
of derrick and
dismantling tte same
cleaning the sile after
completion of the work
restore ttE unused !

departmentalmaterials i
to the departmental a

store etc All complete as i

qq dir:li9t olllr "E-19 i "


* :,i
f\l/A rl,l/A Boring by using 100 ,* iWn"" i0.001 i:i
'',,'.::i
;
:
I
diameter cufter with38 i I
,iiL^ *.* t
i
-.5
mm dia Gl pipe and i
.

other equipments
,capable of drilling up to
;required depth to install
'38mm dia Deep TW by
water jet method or any
: other method approved

by the EIC through all


: sorts of strata pea

rgravel interference
, protection of caving in

, by supplying necessary

MS casing pipe and use


, of bentonite slurry or

, similar collection of soil


isamples at every 3 m
:interval in a white
polythine bag or wooden
,compartmental box and
: preserving them for
i
analysis withdrawal of
,boring pipes and casing
pipes etc complete
lowering the materials
ras mentioned in Part A
for installation of all
;tubewells as per
,drawirq specification i

:and direction of the EIC


l'.-. ---
iZa MA ,MA from 0m to 80m 2000
1

---;:
:!
,
i -:t::ll't-tt-1 i
t--- ' - - -----i -- -' .f .....................
.._.ir-'-.--,.-.1
,2b .}VA :NUA from 80m to '145m : tozs !,,l

- " - --- -i'-----


:

Igb+
',,',,''',','',,',,,'''','i'.'..','.,.,.
,2c l,UA iMA from 145m to 215m i P/nr :1750 i;i'
litr

(Y
,
I
--.-,E
,3a T\YA 'MA first P/m
--;;0- i:rir
,Clay Sealing ln ,
il-'
/Case Filling up the :

rspace between bore I

.hole and the tube well by i

coarse sand FM 2 point :

00 from bottom of the 1

bore hole up to 6 meter ,

frorn top of the filter ln


Second.case Filling up i

the space between bore i

hole ard tube well from ,

top of the clay layer up :


to 6 m with claY balls of :

3 to 5 mm dia which is ;

made of bentonite and :

sticky claY of 1 ratio 1


i

The remaining bore hole


spaces have to be filled
'

with local claY or loose


soil as per direction of i

EIC Filliqg with coarse ,

sand ... j- -

NI/A NUA Ci;;s;;ri,,s r; ii;;i*- .Pl;


i
l15o
7BF
Case Filling uP the i

space between bore


hole and the tube well bY'
coarse sand FM 2 Poittt i
00 from bottom of the :

bore hole uP to 6 rneter i

from top of the filter ln :

Second case Filling uP ,

the space between bore :

. hole
and tube well from '

to 6 m wiih clay balls of i

3nto 5 mm dia wl$ch is :

made of bentonite and


i

stickY claY of 1 ratio 1 I

,The remaining bore hole :

spaces have to be filled ,

with local claY or loose :

soil as Per direction of :

EIC Filling with claY ball


made uP with the i

mixiure of Bentonite and


sticky claY

3c t\UA it\YA Clay Sealing ln flrst


the
I Pim 4975 <f
Case Filling uP a

hole and the tube well bY


li coarse sand FM 2 Point I

ti
rl 00 from bottom of the ,

i bore hole uP to 6 meter

Second case Filling uP ,

the sPace betv'/een bore :

hole and tube well from :

top of the claY laYer uP


to 6 m with claY balls of
3 to 5 mm dia which is ,

,made of bentonite and l

sticky claY of 1 ratio 1

The remaining bore hole


i*pr""* have to be filled '
'with local claY or loose ;

:soil of
as per direction i

EIC The remaining :

with
'spaces are filled ,

local claY or withdrawal :

N/A I\UAI Fitting and fixation of no LS 25 t 2-b6 ,i '

6 hand PumP Fitting and


fixation of no 6 hand t,

departmental store ard I

complete develoPment',
of the tube well to get
sand odour and turbidity
free drinking water at a

tube well have to PumP


continuouslY to get the
target quality of water

specifications and
direction of the EIC l

5 NI/A NUA PlatformConstruction


Construction of concrete
LS
6l /'4f .
1 ralio 2 ratio 4 platform ,

with 75 mm brick soling


by supplying the '
i

necessary materials :

such as 3 bags cement i

1st class brick 1st class :

khoa coarse sand :

including labour charge :

to serve the purpose :

including 12 mm thick .

plaster 1 ratio 4 with tret :

the
cement finishing of i
concrete surfaces
{ Supplying and Fixation
:

:
I
I of GeoCode plate i
Marble or Stone Plate I

300x150x'12 point 50
mnr on the visible :

surface of the platform :

I
The total depth
i
installation date and
abbreviated project 1

name DPHE VWSP and ,

lD M has to be written ;

in or, the Plate of the l

platform The whole work,


has to be done as per l

specificationdrawing i

and direction of the EIC


6 N/A .Vn
'
Collection of water
sample and testing After
rPlTest
:
75
A 6'68
'ensuring proPer well :

development collect the :

water samPles and .

sending the samPles to :

the DPHE Zonal


I Laboratory for testlng of
'
:

Arsenic lron Chloride


Parameters which will be
. tested at the laboratory
, The cost of samPling
:

laboratorY and testing bY,


DPHE laboratorY has to
be done by the
r contractor
, rGrand l

T;i;
, " Note: Al applicable taxes, custom duties, VAT and other levies payable by the Cdntractor under the Contract shall
be included in the unit prices submitted by the Tenderer.

t
* Note: All applicable taxes, custom duties, VAT and other levies payable by the Contractor under the Contracl shall be
included in the unit prices submitted by the Tenderer.

tsiil ol *uantities {Fixed ratt* itoms 1

1) ShallowTubewell (6 No. Punp, Average depth 61m) = 13 Nos


2) Shallow Tara Tuberrrrell,( Iverage depth 61m) = 20 Nos
3) Deep Tubelvell (6 No. Punp, lverage depth 215m ) = 25 Nos
Total = 58 Nos
f;
i : Table Fixed Rate items
; I Nanre:
, :- * "*--"*"?"-"
t. :
ii i

: 1a) iwA
i :srraUow :

i tt-uUewetl I

. '(6no
rihand
il.P'InPt
13 iO.OOt
i:Nn
!.. !

lr
installstion of li

i ; :tube well as
i ; 'Per
direction
i r rofEngineer

: i1(i) 38 rnm Dia 2 iNlo ' 13 '760


point 65 nrm i :

thickness Gl i

Pipe of 1
!i point 52 m i

:' lono
..Y.....
: ., :-----
;

i , 1(ii) iMA N/A 3g mm dia 'P/m 1725 :

uPVC Class i ;

i:
| . .. .
:
! i
-..- -,1 ..--
DPrne i :

;ir(iii) :wn
.. .. .... .1.-.......

.NllA 38 mm dia it-to 13 i

i uPVC!.:
ClassD Sand i
.
,:.i 1

:l
ir
:

i
trapof0 i ' i
ii I
i1 :
:
:poirrtT6m : ,
oer olece i
i i
:ill :
!
,' '.,:- -,
.: i.,,^
i^,,. ll'61r-,uij;pi2i il sev t* i"s-EIE* lE
!i_,..
jr('u) i*^ ,rvA i3ammdia itto
;uPVC : i13 iS+
,'
i:1 ' ;
Four l
"I S
l1
'classD i :

il
'socket i :

,' ; :AdaPter i : i

jrfrl
i ltvl
" ilv*
,rvn il.llA
.rv^ 38mmdia ;t'u
i'* .13 :375
. i iuPVCFilter ! i

: : , Slot OPening i
: Sorlonos i , :i
- ,-l- '--":"-11::r-1.:.:
i

;,--
i . . . ..... -:. ..- . -"- -- ":---"------'----i**--'.----- : '.- i

iiii,rj iwn ,MA ;sotver't ipnuue i13 1170 ,One 'S ' 2219;
: 11"1e Hi sELr #
,ii["- '- ---- "
:' '
i

:Cenrent , t-tun $. -,.rno


?Jd;
i
I

:l - i
:

..' . .190..q-r-Yl9-i"" ., .;
"-"--i--"--' :. --"-""'
,,ririil* 1r.un ,*n
/
,Iffif;lo*n i* .,u 13500
i3percent i i

' i.rva r\uA ,NVA SPoint5 :t'b i13


percent VAI i

hl/A , MA :Nt1A

...... i....... ......., .-1... . .i . ; .. .

,Un ,isoo iiid;ffiifonilis* .ffii|s+;*Ae i


Pump 30 kg i

t 3percent :

2(ii) ,wA 75 mm dia.P/m 600 260 *ii


t,
uPVC Class :

:
C.Pipe- i
2(iii) 50 mm dia iPtrn 590 130
.'vo uPVC Class ;

C Pipe
i

i
I

2(iv) ,
trl/A 32 mm dia :Plm 68
uPVC Class
Ploe
: I

o
ii
i :

2(v) : hl/A 75 mm X 3S :tlo 113


mm dia PVC i

Class-C i

Reducer
'---i---
I

2(vi) t{/A 38 mm dia,Plm 540


.i:ll
uPVC Class
Piee
:

!
P i

'2(vii) NUA :N/A 38 mm dia rNo 2A 375


uPVC Filter ;

length 3m .

Slot Opening :

Borl0nos j

2(viii) NYA dia rNo


3g mm 20 65 Sixty- : 1366, One-'J SELE
uPVC :
Flve i ,Tfro
B
,",:,:

:ClassD Sand
'trap of 0
point 76 m
peg nlece
,
, 2(ix) NUA
rSolvent :Pffube 20 170 io''," .H. i s;oal iir',i.ft ;"9;E ;,1
:Cemeril
Hun,;J e $- -
i. 1009 Tube. i
:, :

.A rhre$
: lz(*t
I\YA .Bailing with , Piset 3320 66a6l 5irt t, seli ,i]
:) ,
.
ToP
Connector
: te ,fi :rY- S,

,Bottom
Connector
Foot Valve
Cylinder
rAssembly
Retrieving
Rod
,Centralizer
50mm dia
:Raising Main
:Raising Top
,32mm dia
rPump Rod

:t',UA
"tg-j
point 5
: :t!/A 5
percentVAT
lNIo 12Bs.4B one ff ,2sigi iwu H,
- brlr :
i rnp iJ :lly-: ij
: C) Deep rlVA f\UA rl.UA o.oo1 zeroQio oor zero$ I sllg ;:
, , Tubewell , po!r(# polnlJ
I '(ono
,hand i
I

,
i I
:

, ,Py*p) ,

.,ttil 38 mm Dia 2 iirlo t5 760 se, ! iooc,Nini'*isELr ,ij,


.*u point 65 mm , en d 'teeng!'
thickness Gl i
t,!
Pipe of 1 i

point 52m t,

ton-g-- . j - t---

1 (ii) wA NiA' 38 mmdia :P/m 5149 Eigh,ttiiiszei Fout{i, srLe -,,


uPVC Class i -Five r ' .Lakd :

D Pipe i
2b 130 one Ei
1 (iir) NA .NA : ,Hun g

l(iv). it'UA NYA

1i;t-
- 'l'uA-
tNA

,.,.,,,'''...' -..:''. -.-- i -.,.


1(vi) ii'UA ,NA

l.- ':-'"*
ir(uii) il.uA ,NA
ili

: 'NA I{/A
:: :
't

by Tenderer