Day 1 Presentation PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 48

Welcome To all the Participants

of
ISO 45001:2018
Lead Auditor Course
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 1
Arrangements

• Evacuation Plan in case of emergency


• Smoking Policy
• Tea/ Lunch Breaks
• First Aid
• Seating/ Thermal Comfort
• Complaint Procedure
• Use of Cell Phones

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 2


Course Assessment
• Continuous Assessment by Tutor (During the Course)
– Attendance
– Participation and involvement in activities
– Understanding and Performance
• End of Course Assessment (2 hours)
– 4 Sections in Question paper
– 70% Pass mark required (50% Minimum score for each section)
Note: To achieve a certificate of successful completion, you
need to pass in both the assessments

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 3


About this Course
• The course has been designed to:
– Meet the requirements of CQI and IRCA for
training OH&S Management system Auditors and
Lead Auditors
– Equip delegates with the knowledge and skills
required to perform audits of Occupational Health
& Safety Management system

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 4


What is Safety
The absence of risk of personal injury,
disease or health problem

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 5


What is Health
Being well at the workplace without the risk
of disease or ill health

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 6


Quiz 1
Do you think that 100% safety can be achieved at the
workplaces? If not, then comment why?

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 7


What is Audit

A systematic, independent and documented


process for obtaining audit evidence and
evaluating it objectively to determine the
extent to which the audit criteria are fulfilled

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 8


Quiz 2
What is difference between an OH&S
Management System and ISO 45001:2018?

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 9


OH&S Management System
• What is OH&S Management system?
• What is purpose of OH&S MS?
• Does an OH&S Management system need to be
documented compulsorily?
• Role of ISO 45001:2018 in OH&S Management
systems

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 10


Quiz 3
Why can’t we have a one fit for all OH&S
Management system applicable to all
organizations?

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 11


Exercise 1
Identify which is not the purpose of OH&S
Management System from the following list:-
• To reduce the direct and indirect costs associated with accidents
• To reduce the property damage at the workplace
• To record and investigate accidents to keep employees morale high
• To reduce the cost of operational controls by providing PPE’s
• To safeguard the organizations from civil and criminal prosecution
• To improve the business performance of the organization
• To improve the competence regarding OH&S

12
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018
Exercise 1
Identify which is not the purpose of OH&S
Management System from the following list:-
• To identify the OH&S performance indicators of the organization
• To measure and improve OH&S performance
• To attract competent professionals to join the organization
• To provide full hospital services at the workplace
• To provide compensation to the victim/ family
• To increase the produced products safety

13
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018
OH&S Management System Model for ISO 45001:2018

14
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018
Quiz 4
Why do organizations need to review their
OH&S management system once the
measuring/ checking and corrective actions
are already being taken?

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 15


Exercise 2
Outline the various indicators through which
the organizations can assess their OH&S
Performance?

16
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018
Exercise 3
Decrease in number of OH&S related incident
in an organization does not guaranty the
improvement of OH&S Management system.
Discuss why?

17
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018
Exercise 3A
Audit Terminologies

Flip Cards
You have been provided with 2 sets of cards
each i.e. Green and White. The green Flip
cards contain the terminologies and white
contain the definitions. You have to match
the terminologies with relevant definitions
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 18
Important Terminologies
• Organization
• Interested party
• Stakeholder
• Worker
• Participation
• Consultation
• Workplace
• Contractor
• Requirement
• Legal requirements and other requirements
Cont…..

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 19


Important Terminologies
• Management system
• Occupational health and safety management system
• OH&S management system
• Top management
• Policy
• Occupational health and safety policy
• OH&S policy
• Objective
• Occupational health and safety objective
• OH&S objective Cont…..

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 20


Important Terminologies
• Injury and ill health
• Hazard
• Risk
• OH&S risk
• Occupational health and safety opportunity
• OH&S opportunity
• Competence
• Documented information
• Process
• Procedure Cont…..

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 21


Important Terminologies
• Performance
• Occupational health and safety performance
• OH&S performance
• Outsource,
• Monitoring
• Measurement
• Audit
• Conformity
• Nonconformity
• Incident
• Corrective action
• Continual improvement

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 22


Quiz 5
Can an ISO 45001:2018 certified organization
mention its certification on the products? If not,
Explain why?

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 23


Sources for Hazard Identifications
• Manufacturer Safety Data Sheet (MSDS)
• Previous Knowledge
• Working Experience
• Accident history
• Ill health records
• Equipment/ Machines’ Manuals
• Regulatory Bodies website
• Industry Journals
• Benchmarking other industries
• Research Articles
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 24
Principle of Risk Assessment
1. Eliminate the hazard
2. Substitute/ reduce the hazard
3. Apply Engineering Controls
4. Apply administrative controls
5. PPE’s

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 25


Exercise 3
Think of any workplace and identify any
significant hazard. Apply principle of risk
assessment and identify suitable measures
accordingly. Also discuss the repercussions
with the suggested changes

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 26


Quiz 6
Outline why PPE’s are the last resort in
controlling the risk?

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 27


Exercise 4
In a number of hazards explained below, suggest
suitable control measure against each
• A construction worker standing at 50 ft height on a
platform without a guard rail
• A worker is moving cement bags (50Kg each) from 1st
floor to 3rd floor placing them on his back
• A worker is demolishing a concrete structure with
hammer

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 28


Exercise 4
• An organization is involved in overhead welding
projects
• Nursing staff taking blood samples from the patients
• Movement of forklift truck in a warehouse where
workers are also performing storage and retrieval

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 29


Risk Assessment Process
• Identify the hazards
• Identify the people who might be harmed
• Evaluate the risk and suggest suitable control measures
• Record the findings and implement changes
• Review as necessary

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 30


Exercise 5
Identify a range of hazards you see at your
workplaces and around your daily life. Also
briefly explain the risk associated with each
hazard

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 31


Types of Audits

• First Party (Internal Audits) 1P

• Second Party (External Audits) 2P

• Third Party (External Audits) 3P

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 32


Difference Amongst Types of Audits
Suggestion/
Type Purpose Influence Consultancy Effectiveness

To measure effectiveness of Depends on


1P OH&S MS and to improve the Top Mgt Yes Effective if backed by
competence in-house Commitment top management

Least influence
2P To gain Business/ Certification on Auditors Depends on Highly effective
from a Client Client

Conflict of Not quite effective


interest is very unless Top Management
3P To gain 3rd party Certification high so there is Not Allowed has a clear will to
some improve its OH&S MS
influence on
Auditors
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 33
Benefits of 3rd Party Accredited
Certification
• Do you think there is any benefit for getting
ISO 45001:2018 certification from a famous
Certification body? If yes, then explain why?

• Tutor will write down the students’ response


on white board and after writing all, it will be
discussed if the responses are relevant or not
and why

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 34


Benefits of 3rd Party Accredited Certification

• Marketing Advantage
• Capturing overseas markets
• Gains customers trust and loyalty
• Value addition in the OH&S MS
• Legal & Other requirements are fulfilled
• 2nd Party audits may be exempted from
clients

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 35


The Audit Process: 3rd Party
Audit Request by Seek Corrective Actions
Auditee from the Auditee No

CB seeks Scope, OH&S MS Documented Desktop


criteria, profile Information sought for Audit Yes
from auditee Document review Successful?
Onsite Audit
Feasibility for Plan
Optional onsite visit by
audit is assessed
the Lead Auditor
by CB Onsite Audit

Agreement Planning for Audit by CB Audit Findings


between Auditee i.e. Selection of
and CB Auditors team etc.
Audit Report

Lead Auditor’s Corrective Action


Closing Meeting
recommendation to CB Program and Follow up 36
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018
Audit Request by Auditee
• Reason for getting audited
• Choice of Certification body

Which certification body will you choose if you


are going to get your company ISO 45001:2018
certified and why?

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 37


Review of Request by CB
• Scope of Audit
• Criteria for Audit e.g. ISO 45001:2018
• Audit objectives
• Geographical Spread
• Location/s
• Number of personnel in the organization
• Complexity of Processes
• Applicable Legal requirements
• Security Issues
• Audit Language
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 38
Review of Request by CB
• Customer worth in terms of Marketing benefits
• Returning customer e.g. re-certification audit
• Financial Benefits
• Previous experience of working with same
client (if applicable)
• Availability of Auditors/ technical experts

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 39


Outcome of Review
• Price proposal
• Number of Auditors
• Addition of relevant technical experts
• Inclusion of Language translators
• Competencies of Auditors
• Planning for Onsite visit (Optional)
• Planning for document review
• Planning for onsite audit

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 40


Audit Man-Days requirement: IAF
Guideline

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 41


Exercise 6
• The profile of Proftech Machining Services (PMS) PMS-
Profile-1 and PMS Audit Programme Form 9.2-OA have
been given as at page (88 and 166 to the book). Please review
both documents and assess the requirements for audit in
terms of selection of auditors and their competencies,
technical experts, number of audit man-days.
• Type: Individual
• Ref Doc: PMS Profile (PMS-Profile-1), 15 Audit Programme
Form 4.5.5-OA, ISO 45001:2018 standard.
• Purpose: To nurture and measure skills for selection of
auditors and their competencies, technical experts, number
of audit man-days for an organization
• Time : 25 Min for Review and 15 mins for students response
and 10 mins for discussion

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 42


Onsite Visit before Desktop Audit
• Optional
• To assess the overall organizational safety culture
• To estimate the complexity of processes w.r.t
Hazards and risks to OH&S
• Organizations readiness for the audit
• To have an idea about the way processes are being
carried out to understand the human behaviors
• To estimate the extent of documented information

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 43


Desktop Review of OH&S MS
• Reasons for Document Review
• Document Review Process
• Document review outcome
• Document review report submission
• Sampling
• Check list preparation
• Interview Questions

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 44


Reasons for Document Review
• To ensure the OH&S MS has been established and
documented
• To ensure the adequacy, suitability & effectiveness of
established OH&S MS as per the nature, scale and
complexity of the processes of the organization
• To establish the onsite audit sampling plan on the basis of
document review
• To prepare the checklists on the basis of document review
• To prepare an audit plan for onsite audit
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 45
Document Review Process
• What to look for?
– Compliance with the criteria in terms of adequacy
and sufficiency
– Provisions for review and continual improvements
– Documents identification and traceability

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 46


Document Review Outcome
Desktop Desktop Onsite Audit Plan is
audit by audit agreed
Yes
Auditor successful

No

NCR/IR/IO
raised by No
auditor

Auditee Org. takes Auditor reviews Corrective actions


corrective actions and the corrective are adequate & Yes
resubmits to auditor actions effective

D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018 47


Document Review Outcome
• Desktop Audit Report
– Non-Conformities (Require corrective actions by
auditee organization before proceeding to next step)
– Observations / Improvement Opportunities (Not a
non-conformity but an alarming situation i.e. a
potential non-conformity. Not a binding on the
auditee to take corrective actions but will be helpful
for them if addressed)
– Some issues highlighted in desktop audit may be
verified by onsite documented information review/
interview and only then it can be concluded if the
issue is a non-conformity or else
48
D1LAC45k1-18 Rev 0 Issue Date 5 Feb 2018

You might also like