Project: Preliminary Cost Sheet - INTERIOR FITOUT WORK-Budgetary Costing
Project: Preliminary Cost Sheet - INTERIOR FITOUT WORK-Budgetary Costing
2 Carpet works Carpet as per colour scheme. ( ___Oz plus , Nylon, durable)
3 Chairs Medium back chair with head rest in Mesh / fabric finish considered . Make: ______
System furniture of laminate finish with / without pedestals , Meeting tables /discussion table , low height
4 Modular Furniture
shuttered storages in laminate finish . Make : _____________
Low side Electrical Works : Cable Termination, socket, Circuit and point wiring
5 Electrical Work Earthling, Termination ,Floor trunking for Electrical and Networking, Cable trays
All services assuming tap of available at floor level
6 Light Fitting LED light fittings, Decorative Lights
7 SECURITY WORKS As per below :
7.2 Fire Alarm System Addressable FAS system with Detector and devices with cabling. Detectors as per norms
8 AIR CONDITIONING Low side works for Air-conditioning with ductable split units.
Total of Above 0 0 All Taxes & Duties /Freight/Mathadi etc. extra as applicable.
Important Notes:
i All taxes and duties -GST, Duties , Freight, Levies , Mathadi as applicable are extra on above costing. GST will be applicable as per Govt directives.
ii Electricity, water supply & lift supply by client. Water and Power supply at one point to be provided by the client for entire duration of project activities .
iii The above cost is based on Preliminary design and proposed layout as received from client and is subjected to vary in case of change in design layout/ details/ makes/ specifications / quantities.
iv The above cost/s do not include any/all expenses needed to be incurred for base building works i.e. Power supply to premises, Aluminium windows, External lift lobby finishes, staircase floor and wall finishes
and expenses for Securing Statutory Approvals etc.
v The costing is based on assumption that a completely levelled and clean site shall be given to contractor for execution.
B Specifically excluded are:
1 Contingencies
2 Diesel Generator, Audio Visual works , Access Control & CCTV ,E P A B X ,IT/ Networking ( Active & Passive ),UPS and Batteries, IBMS, Server / HVAC high side
3 Fit out of Common passage/lift lobby / Staircases, Refuge area . External plumbing works.
4 Kitchen equipments , White goods ,GYM equipments, Façade works
5 Artwork and Artefacts, Landscaping /Plants
6 VESDA, HSSD , Gas suppression system NOVEC 1230
7 Add more items - as per project scope
PROJECT :
Calculations ( not to be shared with client)
Carpet area under scope Sqft
S# package name Scope/ item Unit Nos Area L B/H Exact Qty
Modular
Chairs
Carpet flooring
MEP works
Cost to DSP Margin P&O Cost to Client
Margin T. Qty Estimated Estimated Total amount 30-35% Total
Rate Amount :package amount
:package
5%