SITE ACCEPTANCE TEST REPORT FOR MV PANEL – J03

PROJECT WO # DC EQUIPMENT 22 kV MV PANEL


CLIENT ADDC DATE
CONTRACTOR GULF LOGIC LLC SUBSTATION
TESTING COMPANY ALPHA POWER LLC PAGE Page 1 of 6

CURRENT TRANSFORMER - PROTECTION

1. SWITCH BOARD NO : J03 / TRF 2 Designation: PROTECTION

Name Plate Details Class Ratio VA rating Type

50/1 A 100/1 A
SIEMENS 5P20 50-100/1 A 4MC7033 ZEK
5 VA 7.5 VA

Serial Number R Y B

2. VISUAL CHECKS:

1.Mechanical Damage : NO
2.Tight Connections : OK
3.Star Point Connected and Earth: OK

3. INSULATION RESISTANCE TEST:

Test Points L1 L2 L3
CT Sec.Core – Earth (500 V DC) GΩ GΩ GΩ
Primary – secondary(2500 V DC) GΩ GΩ GΩ

4. WINDING RESISTANCE TEST:

Core (1S1-1S2)
Phases Core (1S1-1S3)
Phases A. Temp mΩ R. Temp mΩ
A. Temp mΩ R. Temp mΩ
L1
L1 CT ANALYSER
L2
TEST CT
REPORT
ANALYSER
ATTACHED
L2
L3 TEST REPORT ATTACHED
L3
5. CT POLARITY TEST BY FLICK TEST:

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC GULF LOGIC LLC ADDC
NAME
SIGNATURE
DATE
SITE ACCEPTANCE TEST REPORT FOR MV PANEL – J03
PROJECT WO # DC EQUIPMENT 22 kV MV PANEL
CLIENT ADDC DATE
CONTRACTOR GULF LOGIC LLC SUBSTATION
TESTING COMPANY ALPHA POWER LLC PAGE Page 2 of 6

Phases 1S1-1S2

L1 OK
P1(+ve),P2(-ve)
L2 OK
S1(+ve),S2,(-ve)
L3 OK

Phases 1S1-1S3

L1 OK
P1(+ve),P2(-ve)
L2 OK
S1(+ve),S3(-ve)
L3 OK

6. CT SATURATION TEST:

7. RATIO TEST:

 (CT ANALYSER TEST REPORTS ARE ATTACHED ALONG WITH THIS REPORT.)

8. PRIMARY INJECTION FOR PROTECTION CORE :

Primary Relay Relay


Measured at RELAY
Phase Current CT Ratio Trip display
Injected IL1 IL2 IL3 IN
L1-L2 100 A 100/1 A 0.0 0.0 OK OK
L2-L3 100 A 100/1 A 0.0 0.0 OK OK
L3-L1 100 A 100/1 A 0.0 0.0 OK OK

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC GULF LOGIC LLC ADDC
NAME
SIGNATURE
DATE
SITE ACCEPTANCE TEST REPORT FOR MV PANEL – J03
PROJECT WO # DC EQUIPMENT 22 kV MV PANEL
CLIENT ADDC DATE
CONTRACTOR GULF LOGIC LLC SUBSTATION
TESTING COMPANY ALPHA POWER LLC PAGE Page 3 of 6

L1-E 50 A 100/1 A 0.0 0.0 OK OK


L2-E 50 A 100/1 A 0.0 0.0 OK OK
L3-E 50 A 100/1 A 0.0 0.0 OK OK

9. REMARKS

10. TEST EQUIPMENT DETAILS:

Description of Test Equipment Serial Number Calibration Due Date

CT Analyzer KM285H 08.11.2018


Secondary Injection Kit 1502101 14.01.2019
Insulation Tester 101574096 05.03.2019

CURRENT TRANSFORMER - METERING

1. SWITCH BOARD NO : J03 / TRF 2 Designation: METERING

Name Plate Details Class Ratio VA rating Type

50/1 A 100/1 A
SIEMENS 1FS5 50-100/1 A 4MC7033 ZEK
5 VA 7.5 VA

Serial Number R Y B

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC GULF LOGIC LLC ADDC
NAME
SIGNATURE
DATE
SITE ACCEPTANCE TEST REPORT FOR MV PANEL – J03
PROJECT WO # DC EQUIPMENT 22 kV MV PANEL
CLIENT ADDC DATE
CONTRACTOR GULF LOGIC LLC SUBSTATION
TESTING COMPANY ALPHA POWER LLC PAGE Page 4 of 6

2. VISUAL CHECKS:

1.Mechanical Damage : NO
2.Tight Connections : OK
3.Star Point Connected and Earth: OK

3. INSULATION RESISTANCE TEST:

Test Points L1 L2 L3
CT Sec.Core – Earth (500 V DC) GΩ GΩ GΩ
Primary – secondary(2500 V DC) GΩ GΩ GΩ

4. WINDING RESISTANCE TEST:

Core (1S1-1S2)
Phases Core (1S1-1S3)
Phases A. Temp mΩ R. Temp mΩ
A. Temp mΩ R. Temp mΩ
L1
L1 CT ANALYSER
L2
TEST CT
REPORT
ANALYSER
ATTACHED
L2
L3 TEST REPORT ATTACHED
L3
5. CT POLARITY TEST:

Phases 1S1-1S2

L1 OK
P1(+ve),P2(-ve)
L2 OK
S1(+ve),S2,(-ve)
L3 OK

Phases 1S1-1S3

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC GULF LOGIC LLC ADDC
NAME
SIGNATURE
DATE
SITE ACCEPTANCE TEST REPORT FOR MV PANEL – J03
PROJECT WO # DC EQUIPMENT 22 kV MV PANEL
CLIENT ADDC DATE
CONTRACTOR GULF LOGIC LLC SUBSTATION
TESTING COMPANY ALPHA POWER LLC PAGE Page 5 of 6

L1 OK
P1(+ve),P2(-ve)
L2 OK
S1(+ve),S3(-ve)
L3 OK

6. CT SATURATION TEST:

7. RATIO TEST:

 (CT ANALYSER TEST REPORTS ARE ATTACHED ALONG WITH THIS REPORT.)

8. PRIMARY INJECTION FOR METERING CORE:

Primary Measured at AMMETER


Phase Current CT Ratio
Injected IL1 IL2 IL3

L1-L2 50 A 100/1 A 50 50 0

L2-L3 50 A 100/1 A 0 50 50

L3-L1 50 A 100/1 A 50 0 50

9. REMARKS

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC GULF LOGIC LLC ADDC
NAME
SIGNATURE
DATE
SITE ACCEPTANCE TEST REPORT FOR MV PANEL – J03
PROJECT WO # DC EQUIPMENT 22 kV MV PANEL
CLIENT ADDC DATE
CONTRACTOR GULF LOGIC LLC SUBSTATION
TESTING COMPANY ALPHA POWER LLC PAGE Page 6 of 6

10. TEST EQUIPMENT DETAILS:

Description of Test Equipment Serial Number Calibration Due Date

CT Analyzer KM285H 08.11.2018


Secondary Injection Kit 1502101 14.01.2019
Insulation Tester 101574096 05.03.2019

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC GULF LOGIC LLC ADDC
NAME
SIGNATURE
DATE