The report details the site acceptance testing performed on an 11kV MV panel, including testing of protection relays and circuit breakers.

The report is testing the protection relays and circuit breakers that are part of an 11kV MV panel as part of the site acceptance testing process.

The main components being tested are the protection relays (including phase fault, earth fault, and sensitive earth fault relays) and the circuit breakers.

SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J02

PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL


CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDIYARAT TMP04
TESTING COMPANY ALPHA POWER LLC PAGE Page 1 of 6

OC&EF RELAY TEST

1. RELAY NAME PLATE DETAILS


MAKE SIEMENS AUX. VOLTAGE 48 V DC
TYPE ARGUS 7SR1103 CT RATIO 100/1 A
SERIAL NO BF 1708510792 TRANSFORMER RATING 1500 kVA

2. VISUAL INSPECTION CHECKS:

 Check any physical damage on the Relay. :NO

 Check installation & terminal tightness. :OK

 Check wiring as per approved/manufacturer drawing. : OK

 Ensure correct labelling on Relay. : OK

 Check case / body ear thing completed. : OK

3. MEASUREMENT CHECKS: Adopted CT Ratio: 100/1A

Injected Secondary Relay Display Current


Phase Ref. Remarks
Current (A) (A)
R - Phase 1.0 1.00 OK
Y - Phase 1.0 1.00 OK
B - Phase 1.0 1.01 OK
N - Neutral 0.5 0.50 OK

4. SECONDARY CURRENT INJECTION TEST:

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J02
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDIYARAT TMP04
TESTING COMPANY ALPHA POWER LLC PAGE Page 2 of 6

Curve Ref: I > Phase Fault: Extremely Inverse (IEC)


Ie> Earth Fault: Normal Inverse (IEC)
Operating Time (Sec) TRIP
Pick-up
Phase Current 2X Is 5XIs OPERATIO
Current TMS
Ref. Settings (Is) N
(A) Measured Measured
R-
0.85 0.88 0.9 24.03 3.002 OK
Phase
Y-
0.85 0.88 0.9 24.05 3.004 OK
Phase
B - Phase 0.85 0.87 0.9 24.02 3.002 OK
EF 0.4 0.42 0.05 0.509 0.218 OK

INSTANTANEOUS OC STAGE 1: I >>

Set Current Set Time Operating Time


Phase Ref. Trip Test Remark
(A) (ms) (ms)
R - Phase 6.0 150 181 OK OK
Y - Phase 6.0 150 183 OK OK
B - Phase 6.0 150 180 OK OK
EF - Phase 2.0 100 130 OK OK

INSTANTANEOUS OC STAGE 1: I >>>

Set Current Set Time (m Operating Time


Phase Ref. Trip Test Remark
(A) (ms) (ms)
R - Phase 15.0 0 32 OK OK
Y - Phase 15.0 0 30 OK OK
B - Phase 15.0 0 33 OK OK

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J02
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDIYARAT TMP04
TESTING COMPANY ALPHA POWER LLC PAGE Page 3 of 6

5. FUNCTIONAL CHECKS:

 Check Relay Watchdog Contacts :OK

 Check Relay Output Contacts :OK

 Check LED Indication : OK

 Check Relay Event Record : OK

 Check Relay Reset Function : OK

6. FINAL SETTING:

Curve Ref: I > Phase Fault: Extremely Inverse (IEC)


Ie> Earth Fault: Normal Inverse (IEC)

Phase Fault Setting (A) TMS Earth Fault Setting (A) TMS

I> 0.85 0.9 Ie> 0.4 0.05


I >> 6.0 0.15 sec Ie>> 2.0 0.1 sec
I >>> 15.0 0 Ie>>> OFF ---

7. FINAL RECORD

Record No 1 Threshold 51G-1

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J02
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDIYARAT TMP04
TESTING COMPANY ALPHA POWER LLC PAGE Page 4 of 6

Fault EARTH Magnitude 0.044 kA

SBEF RELAY TEST

1. RELAY NAME PLATE DETAILS

MAKE SIEMENS AUX. VOLTAGE 48 V DC


TYPE ARGUS 7SR1101 CT RATIO 2000/1 A
SERIAL NO BF 1708511370 TRANSFORMER RATING 1500 kVA

2. VISUAL INSPECTION CHECKS:

 Check any physical damage on the Relay. :NO

 Check installation & terminal tightness. :OK

 Check wiring as per approved/manufacturer drawing. : OK

 Ensure correct labelling on Relay. : OK

 Check case / body ear thing completed. : OK

3. SECONDARY CURRENT INJECTION TEST:


a) Curve Ref: Extremely Inverse (IEC): Ie> Earth Fault

Pick-up Operating Time (Sec) TRIP


Phase Current
Current TMS 2X Is 5XIs OPERATIO
Ref. Settings (Is)
(A) Measured Measured N

E/F 1.1 1.13 1 26.70 1.339 OK

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J02
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDIYARAT TMP04
TESTING COMPANY ALPHA POWER LLC PAGE Page 5 of 6

b) Instantaneous OC Stage 1: Ie>>


Current Setting Trip
Test Point Time in ms Operating time in ms
(A) Operation
E/F 8.0 150 182 OK

4. FINAL SETTING:

c) Characteristic curve setting: Extremely Inverse (IEC)

Tms
Earth Fault Setting

Ie> 1.1 1
Ie>> 0.15 Sec

5. FINAL RECORD

Record No 1 Threshold 51G-1


1.896
Fault EARTH Magnitude
kA

6. REMARKS:

7. TEST EQUIPMENT DETAILS:

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020
SITE ACCEPTANCE TEST REPORT FOR MV PANEL-J02
PROJECT WO # DC 3131344 EQUIPMENT 11 kV MV PANEL
CLIENT ADDC DATE 30.05.2020
CONTRACTOR HILALCO SUBSTATION AL HUDIYARAT TMP04
TESTING COMPANY ALPHA POWER LLC PAGE Page 6 of 6

Description of Test
Serial Number Calibration Due Date
Equipment
Secondary Injection Kit 1100491 09.12.2020

TESTED BY CONTRACTOR WITNESS/APPROVED BY


COMPANY ALPHA POWER LLC HILALCO ADDC
NAME GAJENDRAN
SIGNATURE
DATE 30.05.2020