exe
===============================================
Default Project..................................................Bldg
Projects:
Bldg............................................................Office
Building Addition
Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................Yes
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................Yes
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Start Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Successor
Activity Calendar
Preserve scheduled early and late dates..........................Yes
Level resources only within activity Total Float.................No
Level all resources..............................................Yes
Advanced
--------
Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Free Float
Number of paths to calculate.....................................50
Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................87
# Not Started....................................................46
# In Progress....................................................10
# Completed......................................................31
# Relationships..................................................93
# Activities with Constraint.....................................0
Errors:
-------
Warnings:
---------
Activities without predecessors..................................17
Project: Bldg Activity: B-PE Plumbing & Electrical Summary
Project: Bldg Activity: BA-B Brick Summary
Project: Bldg Activity: BA-C Ceiling Summary
Project: Bldg Activity: BA-DE Design & Engineering Summary
Project: Bldg Activity: BA-DW Doors and Windows Summary
Project: Bldg Activity: BA-E Elevator Summary
Project: Bldg Activity: BA-EXT Exterior Finishes Summary
Project: Bldg Activity: BA-F Foundation Summary
Project: Bldg Activity: BA-FC Floor and Carpeting Summary
Project: Bldg Activity: BA-HVAC HVAC Summary
Project: Bldg Activity: BA-IF Interior Finishes Summary
Project: Bldg Activity: BA-ME Mech/Electrical Summary
Project: Bldg Activity: BA-P Paint Summary
Project: Bldg Activity: BA-PLF Plumbing & Light Fixtures
Summary
Project: Bldg Activity: BA-R Roof Summary
Project: Bldg Activity: BA-S Structure Summary
Project: Bldg Activity: BA000 Start Office Building Addition
Project
Out-of-sequence activities.......................................0
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................87
# Relationships with other projects..............................0
Data Date........................................................01-Jul-07
Earliest Early Start Date........................................02-Jul-07
Latest Early Finish Date.........................................03-Jan-08
Number of float paths............................................0
Exceptions:
-----------
Critical Activities..............................................26
Project: Bldg Activity: BA-B Brick Summary
Project: Bldg Activity: BA-C Ceiling Summary
Project: Bldg Activity: BA-EXT Exterior Finishes Summary
Project: Bldg Activity: BA-R Roof Summary
Project: Bldg Activity: BA-S Structure Summary
Project: Bldg Activity: BA710 Erect Structural Frame
Project: Bldg Activity: BA712 Floor Decking
Project: Bldg Activity: BA730 Concrete First Floor
Project: Bldg Activity: BA735 Concrete Second Floor
Project: Bldg Activity: BA737 Structure Complete
Project: Bldg Activity: BA750 Brick Exterior Walls
Project: Bldg Activity: BA780 Insulation and Built-up Roofing
Project: Bldg Activity: BA800 Building Enclosed
Project: Bldg Activity: BA850 Install Wiring and Cable
Project: Bldg Activity: BA870 Connect Equipment
Project: Bldg Activity: BA871 Startup and Test HVAC
Project: Bldg Activity: BA880 Rough In Complete
Project: Bldg Activity: BA890 Drywall in Offices
Project: Bldg Activity: BA900 Install Ceiling Grid
Project: Bldg Activity: BA910 Install Floor and Carpeting
Project: Bldg Activity: BA911 Finish Carpentry and Millwork
Project: Bldg Activity: BA940 Touch-up and Clean-up
Project: Bldg Activity: BA941 Test and Balance HVAC Equipment
Project: Bldg Activity: BA950 Finishes Complete
Project: Bldg Activity: BA960 Punch List
Project: Bldg Activity: BA970 Building Addition Complete