0% found this document useful (0 votes)
149 views1 page

04 Roof Beam

The document appears to be engineering plans showing the reinforcement details for roof beams, including longitudinal sections and dimensions. It includes notes specifying the level of beams, concrete cover dimensions, development length requirements at beam-column junctions, and curtailment details. Dimensioned drawings of the typical longitudinal section are provided for four roof beams labeled A through D.

Uploaded by

Ashok Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
149 views1 page

04 Roof Beam

The document appears to be engineering plans showing the reinforcement details for roof beams, including longitudinal sections and dimensions. It includes notes specifying the level of beams, concrete cover dimensions, development length requirements at beam-column junctions, and curtailment details. Dimensioned drawings of the typical longitudinal section are provided for four roof beams labeled A through D.

Uploaded by

Ashok Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A B C D

9.190
3.730 1.730 3.730

1 1
CB CB
1.315 1.315 230 230

2 2 120 120
MID SECTION END SECTION

CB- REINFORCEMENT
1.848 RB RB RB RB 1.848
5.240 5.240 230 230

3 3
300 300

MID SECTION END SECTION


2.078 2.078
RB- REINFORCEMENT

4 4
CB CB

3.730 1.730 3.730

9.190

A B C D
ROOF BEAM NOTES:

1. FOR LEVEL OF THE BEAMS REFFER


L/3 L/3 L/3 L/3 L/3 L/3 ARCHITECTURAL PLAN
2. BOTTOM CLEAR COVER 25 MM. SIDE AND TOP
0.1L 0.1L 0.1L 0.1L 0.1L 0.1L COVER 20 MM.
3. DEVELEPMENT LENGTH Ld SHOULD BE
PROVIDED AT BEAM COLUMN JUNCTION
TYPICAL LONGITUDINAL SECTION OF ROOF BEAM REINFORCEMENT
4. REFER TO LONGITUDINAL SECTION FOR
CURTAILMENT DETAILS

NATIONAL HIGHWAYS AUTHORITY .\NIT_Trichy_logo.jpg


National Institute of Technology Arunachalam towers, 1st floor, No.31/9,
.\download (1).png EKK logo.jpg
OF INDIA Trichy-620 015 South K.R.Koil st, west mambalam,
Chennai-33. Ph: 044 43016370.

Balance work for two Laning with Paved Shoulder of Dindigul -


Theni Section from Km 2. 750 to Km 73.400 of NH-45 (Extn) and
Theni- Kumili Section of NH-220 from Km 215.500 to Km 273.600 in
the State of Tamil Nadu under item rate Contract. 0