EPC Contractor Consultant Client: SIL/DMP/PQP CONC-01 Rev 0

This document contains 3 summaries of compressive strength tests on concrete cubes: 1) M15 grade concrete cubes tested at 7 days achieved an average compressive strength of 14.24-15.27 N/mm2. 2) M15 grade concrete cubes tested at 28 days achieved an average compressive strength of 22.41-23.27 N/mm2. 3) M30 grade concrete cubes tested at 7 days achieved an average compressive strength of 27.50-27.67 N/mm2.

Uploaded by

Biplab datta
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views

EPC Contractor Consultant Client: SIL/DMP/PQP CONC-01 Rev 0

This document contains 3 summaries of compressive strength tests on concrete cubes: 1) M15 grade concrete cubes tested at 7 days achieved an average compressive strength of 14.24-15.27 N/mm2. 2) M15 grade concrete cubes tested at 28 days achieved an average compressive strength of 22.41-23.27 N/mm2. 3) M30 grade concrete cubes tested at 7 days achieved an average compressive strength of 27.50-27.67 N/mm2.

Uploaded by

Biplab datta
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

COMPRESSIVE STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete M15


Design Mix Ramco cement and
Part of structure Grade of cement
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 8306 2.461 7 days 319 14.18

2 8282 2.454 7 days 323 14.36 14.24

3 8270 2.450 7 days 319 14.18

4 8100 2.400 7 days 324 14.40

5 8202 2.430 7 days 353 15.69 15.27

6 8173 2.422 7 days 354 15.73

EPC Representative Consultant Representative Client Representative


SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

COMPRESSIVE STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete M15


Design Mix Ramco cement and
Part of structure Grade of cement Ramco OPC 43
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 8056 2.387 28Days 527 23.42

2 8249 2.444 28Days 509 22.62 22.79

3 8130 2.409 28Days 502 22.31

4 8253 2.445 28Days 462 20.53

5 8074 2.392 28Days 515 22.89 22.41

6 8345 2.473 28Days 536 23.82

7 8299 2.459 28Days 526 23.38

8 8353 2.475 28Days 505 22.44 23.27


9 8133 2.410 28Days 540 24.00

EPC Representative Consultant Representative Client Representative


SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

COMPRESSIVE STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete M30


Design Mix Ramco cement and
Part of structure Grade of cement
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 8305 2.461 7 days 590 26.22

2 8214 2.434 7 days 667 29.64 27.67

3 8120 2.406 7 days 611 27.16

4 8069 2.391 7 days 602 26.76

5 8347 2.473 7 days 668 29.69 27.50

6 8285 2.455 7 days 586 26.04

EPC Representative Consultant Representative Client Representative


SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

COMPRESSIVE STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete M30


Design Mix Ramco cement and
Part of structure Grade of cement Ramco OPC 43
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 8073 2.392 28Days 892 39.64

2 8207 2.432 28Days 822 36.53 37.66

3 8124 2.407 28Days 828 36.80

4 8212 2.433 28Days 819 36.40

5 8348 2.473 28Days 810 36.00 36.34

6 8317 2.464 28Days 824 36.62

EPC Representative Consultant Representative Client Representative


SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

COMPRESSIVE STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete PQC M40
Design Mix Ramco cement and
Part of structure Grade of cement
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 8109 2.403 7 days 887 39.42

2 8186 2.425 7 days 886 39.38 38.81

3 8143 2.413 7 days 847 37.64

EPC Representative Consultant Representative Client Representative


SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

COMPRESSIVE STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete PQC M40
Design Mix Ramco cement and
Part of structure Grade of cement
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 8353 2.475 28 days 1035 46.00

2 8221 2.436 28 days 1064 47.29

3 8333 2.469 28 days 1022 45.42

EPC Representative Consultant Representative Client Representative


SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

Flexural STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete PQC M40
Design Mix Ramco cement and
Part of structure Grade of cement
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 38100 2.419 7 days 23.0 4.09

2 38244 2.428 7 days 22.5 4.00

3 38385 2.437 7 days 19.5 3.47

EPC Representative Consultant Representative Client Representative


SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

Flexural STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete PQC M40
Design Mix Ramco cement and
Part of structure Grade of cement
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 38350 2.435 28 days 29.5 5.24

2 38610 2.451 28 days 27.5 4.89

3 38043 2.415 28 days 28.5 5.07

EPC Representative Consultant Representative Client Representative


SIL/DMP/PQP CONC-01 rev 0

Construction of 4/6 laning Pavement from km 132.375 to km


153.058(length 20.683km) on Daboka Dimapur section(Dimapur by
pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE
in the State of Nagaland

EPC Contractor Consultant Client


National highways and
M/S Simplex M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo
Infrastructure development
Infrastructures Limited Tech Consultants Pvt Ltd
Corporation Limited

COMPRESSIVE STRENGTH OF CONCRETE CUBES


( As Per IS: 516 )

Location QA/QC Lab Date of casting 13.11.2019

Name of structure PQC Design Mix M40 Grade of concrete M15


Design Mix Ramco cement and
Part of structure Grade of cement
Noremate admixture
Area of cubes (mm2) 22500

Wt.of cube Date of Comp.St Avg. Comp.St


SL.No. Density gm/cc Days Load in KN Remarks
(gm) Testing N/mm2 N/mm2
1 7 days 349 15.51

2 7 days 303 13.47 14.13

3 7 days 302 13.42

EPC Representative Consultant Representative Client Representative