The historical data was in the form of a database The model could be used by engineers to save time
of hand-written logs and contained no direct RQD and costs that will benefit the client over the short and
measurements. long-term
Typically, a variety of Kriging is used on the recorded READ DETAILED REPORT for more information
values to estimate the RQD values throughout the about the technical details of this project and the
deposit and use these to influence the safe design of methodology used to create the model.
stopes and determine the difficulty and timing of their
extraction. Because the historical data did not contain
direct RQD measurements the standard estimation
methodology was not automatically applicable.