0% found this document useful (0 votes)
147 views11 pages

Request For Technical Proposal

This document contains a requests for proposal for a telecommunications project. It includes 10 sections requesting information on: 1) The bidding company's profile, experience, certifications, and capacity. 2) The proposed organizational structure to complete the project. 3) The construction program and methodology for various project milestones. 4) A proposed implementation schedule. 5) The human resources plan including key personnel. 6) Vehicles, facilities, tools, and instruments required. 7) Proposed quality control measures. 8) The financial plan and fund allocation. 9) Health, safety and environmental control plans. 10) A proposed reporting system and

Uploaded by

Jheisson Alvarez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
147 views11 pages

Request For Technical Proposal

This document contains a requests for proposal for a telecommunications project. It includes 10 sections requesting information on: 1) The bidding company's profile, experience, certifications, and capacity. 2) The proposed organizational structure to complete the project. 3) The construction program and methodology for various project milestones. 4) A proposed implementation schedule. 5) The human resources plan including key personnel. 6) Vehicles, facilities, tools, and instruments required. 7) Proposed quality control measures. 8) The financial plan and fund allocation. 9) Health, safety and environmental control plans. 10) A proposed reporting system and

Uploaded by

Jheisson Alvarez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 11

内部公开 Internal Use Only▲

Requests for Technical Proposal

Table of Contents

1. Company profile..............................................................................................................................2
1.1 Cooperation history with ZTE..............................................................................................2
1.2 Total contract amount (in USD) / scale in the last two years...............................................2
1.3 Project experience in Installation field in the last two years................................................2
1.4 List of major customers and reference..................................................................................2
1.5 ISO9000,TL9000 or other quality certifications...............................................................2
2. Organization structure for the project.......................................................................................3
3. Construction program for the project........................................................................................4
3.1 Preparation works.................................................................................................................4
3.2 Construction process/methods..............................................................................................4
3.3 Site Capability per week.......................................................................................................4
4. Implementation schedule (for one site).......................................................................................5
5. Human resources plan for the project........................................................................................6
5.1 Key persons...........................................................................................................................6
5.2 Team quantity and team structure.........................................................................................6
6. Vehicle, facility, instrument and tool plan for the project........................................................7
7. Quality control measures..............................................................................................................7
8. Financial plan and fund allocation for the project....................................................................8
9. Health/Safety/Environment control measures...........................................................................9
10. Reporting system and routine communication...........................................................................10

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第1页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

1. Company profile

1.1 Cooperation history with others

Notes: Provide the first page with signature or other pages of contract which can prove
cooperation with others

1.2 Total contract amount (in USD) / scale in the last two years

1.3 Project experience in wireless field ( Include :Network Planning,Network


Optimization,Network Survey/ Test,Site acquisition, Site Survey&design,Telecom

Installation(wireless),Microwave Construction/ Commissioning ,Civil construction, O&M , Tower

design &Construction etc) in the last two years

Main SOW of
Area Site Site
N Project the project Contract
(Region or Amount Amount Client
o. Name (Type of
Country) (2018) (2019)
Value
service)
1
2
3
4
5

Notes: List the main project.

1.4 List of major customers and reference by year

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第2页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

Notes: Please provide copy of the certification

1.5 Capacity list

Capacity list.xlsx

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第3页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

2. Organization structure for the project ( Organization

Chart)

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第4页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

3. Construction program for the project ( describe the

methodology use for each milestone)

3.1 Preparation works

3.2 Installation process/methods

3.3 site civil construction process

3.4 Network optimization

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第5页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

4. Implementation schedule (for one site)

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第6页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

5. Human resources plan for the project

5.1 Key persons

Notes: List the key persons for this project such as PM, CTO etc. Provide resumes, technical
capability, project experiences, and other information of these key persons.

5.2 Team quantity and team structure

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第7页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

6. Vehicle, facility, instrument and tool plan for the project

also for project management

Notes: Please provide a list of the vehicle, facility, instrument, tools etc.

7. Quality control measures

7.1 ISO9000 , OHSAS 18000 TL9000 or other quality


certifications

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第8页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

8. Financial plan and fund allocation for the project

1、Providing the following financial index of 2018/2017/2016


Total Assets、Total Liabilities、Revenue、EBITDA、Net Profit、Cash and Cash
Equivalents 
2、Whether you can provide the letter of guarantee from internation bank to
customer ?

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第9页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

9. Health/Safety/Environment control measures

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第 10 页
All Rights reserved, No Spreading abroad without Permission of ZTE
内部公开 Internal Use Only▲

10. Reporting system and routine communication

(Communication Plan)

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 第 11 页
All Rights reserved, No Spreading abroad without Permission of ZTE

You might also like