12mm - 6 Nos. 12mm - 6 Nos. 12mm - 8 Nos.
12mm - 10 Nos. 12mm - 12 Nos. 16mm - 4 Nos. First Remove
First Remove First Remove First Remove
NOTE :- 5" L SHOULD BE PROVIDED IN FOOTING AND 12" L SHOULD BE PROVIDED IN COLUMN
FOOTING AND COLUMN SIZE FOR EXCAVATION DEPTH UPTO 6' FROM PLINTH BEAM TOP
R.C.C. 1:2:3
10 MM 6"c/c
C/C
WAIST SLAB
6" TH.
12 MM 6" c/c
STAIR DETAIL
GENERAL NOTE
1) USE CONCRETE MIXER AND VIBRATOR IN ALL R.C.C. WORK
2) CURING OF R.C.C. SHOUD BE DONE FOR ATLEAST 10 DAYS
3) MASONRY CAN BE DONE BEFORE COLUMN AND SLAB-BEAM
ASSURING NO BULDGE IN FORMWORK AND CAN BE UPTO 4 STOREY BUILDING