ABSTRACT
Presently, on the construction sites, because of the manual process of plastering the walls, there is large
scale need of skilled labors and the higher labor costs are responsible for increasing the overall cost of
construction of a building. The quality of plastering depends upon the skill of the labor in manual
plastering method hence it contains irregular plastering surface which gives rise to risk and hazards to the
infrastructure.
The solution of the above issues is just to introduce an automatic plastering machine which automates
the process so as to save the time and money and achieve better quality of paltering. The finishing of the
walls obtained from automatic plaster machine is very smooth and accurate as compared to manual
process. Hence the machine is time saving, money saving hence the total cost of the project reduces which
ultimately increases the progress rate of our nation
KEYWORDS: Labor cost, hopper, rope, motors, hazards, infrastructure, plastering, efficiency.
Copyright © 2014-2020 International Journal for Modern Trends in Science and Technology
DOI: https://doi.org/10.46501/IJMTST060633
of construction and project work. Also, the quality process. This problem can be solved by just
of the plastering work. automating the process which is the main objective
The quality of the plastering work depends upon also include:
the skills of the labor in manual process. The 1. Saving of time period and cost.
plastering achieved by labors contains irregulars of 2. Achieving good plaster finishing to the walls.
the surface of the plaster and usually is 3. It will reduce human work.
nonuniform. Thus, it affects the overall strength of 4. It will be portable.
the construction and threat is obtained. 5. Machine cost will be less than the cost of
existing methods.
Also, labors take more time to finish the work,
6. Accuracy and precision in thickness of the
they ask for breaks and holidays which enlarges
plaster.
the construction period. Skilled labors require
7. Saving raw material wastage.
more money and it increases the total cost of work
8. Easy operation.
which is very inefficient.
9. Machine control using remote controller.
The building construction is time consuming
sector since lot of work is labor based but, in every
IV. PRE-PLASTERING REQUIREMENTS
sector, plastering work is must so as to provide
strength and protection to the infrastructure of the The pre-plastering requirements include following
building. aspects:
Despite of significance to Indian Economy which The structure of the bricks should be in the
is blessed with 26 million casual staff, there is no proper manner i.e. it should form a flat surface
specific policy for ability building within the all over its area i.e. with its height, length and
construction sector. breath.
Following table shows the present pool of the 3mm deviation is allowable over the 1200 mm
development of manpower in republic of India radius.
contains principally unskilled workers. The surface i.e. where the machine is going to
be installed for plastering should be flat so that
CATEGORY % OF TOTAL the base of the machine remains same during
EMPLOYMENT EMPLOYMENT its operation.
Unskilled 83% 25.6 million The mixture of the plaster should be poured in
labors the proportion of 4:1 i.e. cement and sand
respectively.
Skilled 10% 3.3 million
labors V. DESIGN OF THE MACHINE COMPONENTS
Engineers 3% 0.8 million
Technicians 2% 0.6 million i. Weight / Load On the Container:
and foreman
Container Specifications = 12*12*6 (l*b*h)
Clerical 2% 0.7 million Inches.
i.e. 30.48 cm * 30.48 cm * 15.24 cm
In most of the countries, 10 to 20 % of the GNP is
Height of the poles for lifting up the
for the construction industries which makes it
container = 36 Inches i.e. 91.44 cm.
largest economic employment sectors. Plastering is
sensitive process if failed it can lead to excess
Plastering Width = 10 inches = 25.4 cm.
shrinkage and cracking if precision is avoided
Plastering Height = 28 inches = 71.12 cm.
which ultimately leads to dangerous hazards and
Plastering Thickness = 0.3937 inches =
risks the human life.
1cm.
III. OBJECTIVES
Mortar Mixing Proportions = 4:1 (cement:
Due to the manual process of wall plastering on
sand) universal.
construction site, there is a huge scale requirement
of labor which in turn increases the costing of
Let us consider 2 kg mixture of cement and
project work. The quality of work depends on the
sand has to be poured in the container,
degree of skill the labors have in manual plastering
F=W*g
= 3.5 * 9.81
= 34.33 N.
IX. CONCLUSION
Automatic plastering machine has been developed
successfully and is ideally suitable for the
construction industry. Automatic plastering
machine can improve the quality of the work with
less wastage of material and with help of less no. of
workers which can solve the problem of shortage of
skilled labors.
Automatic plastering machine is fast and the
quality of the work is superior as compared to the
manual labor work.
Hence this machine can save time, money and
gives us the change from the traditional manual
technique to automated new technology which
increases the efficiency and leads to growth of the
nation.
REFERENCES
[1] Design and Fabrication of Wall Plastering Machine, Journal
of Mechanical Engineering and Automation 2017, 7(5):
159-163.
[2] Design and Fabrication of Automatic Wall Plastering
Machine, IJARIIE-ISSN, 02-2-17.
[3] Review Paper on Design of Automatic Wall Plastering
Machine, International Journal for Scientific Research &
Development, 12-2018.
[4] Automatic Wall Plastering Machine, International Journal
of engineering and Technical Research (IJETR), 1 January
2016.
[5] Automatic Plastering Machine, International Journal of
Advance Research in Electronics, Communication &
Instrumentation Engineering and Development, 28th July
2014.