TLE-9-12-Technical-Drafting-NC-II-MATRIX (ROSALIJOS)
TLE-9-12-Technical-Drafting-NC-II-MATRIX (ROSALIJOS)
Learning competencies
Week of the Lesson Exemplar/ Link (if available Assessment
(Grade 9-12 TLE: Technical LR developer
Quarter/ Learning resources online) (provide a link if
Grading Period
Drafting)
available online)
1st QUARTER
LO 1. Prepare architectural
job requirements
2.1 Observe OHS policies CBLM: INFORMATION DEPED -PUBLIC SELF CHECK 2.2
and procedures in SHEET 2.2 important TECHNICAL-
setting-up tools and Practices that must be VOCATIONAL
materials for drawing observed in the work HIGH SCHOOLS
station or work place
Week 2 2.2 Prepare drawing tools, CBLM: INFORMATION PUBLIC SELF CHECK 2.1
materials and equipment SHEET 2.1 TECHNICAL-
based on job The Importance of VOCATIONAL
requirements Drawing tools, materials HIGH SCHOOLS
and equipment
2.3 Set up tools, materials, CBLM: INFORMATION DEPED PUBLIC ACTIVITY SHEET #
and equipment based on the SHEET 2.2 Procedure in TECHNICAL- 1.1
job requirements Setting up Drawing tools, VOCATIONAL
Materials and Equipment HIGH SCHOOLS
and standard procedure
3.3 Draw a title block TLE LM: TITLE BLOCK IN DEPED- LEARNING Draw title block in
according to the architectural HOUSE PLAN (Page 45) MATERIAL
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)
4.1 Draw walls, windows, CBLM:INFORMATION DEPED -PUBLIC Operation sheet no.
doors, fixtures, and SHEET 4.1 TECHNICAL- 4.1 Procedure in
fittings according to FLOOR PLAN FEATURES VOCATIONAL drawing a floor
architectural design (Page 65-72) HIGH SCHOOLS plan.
standards (Page 83-90)
4.2 Draw grid and dimension CBLM:INFORMATION DEPED -PUBLIC
lines according to SHEET 4.3 Architectural TECHNICAL-
architectural design drafting design standards VOCATIONAL
standards (Page 77-78) HIGH SCHOOLS
Week 6-10
4.3 Use metric scale system CBLM: INFORMATION DEPED -PUBLIC SELF CHECK 4.2
according to the SHEET 4.2 TECHNICAL- Use of appropriate
magnitude of the plan Use of appropriate scale VOCATIONAL scale
in drawing a Floor Plan HIGH SCHOOLS (Page 76)
(Page 73-75)
4.4 Identify sizes of doors, CBLM: INFORMATION DEPED -PUBLIC SELF CHECK 4.3
walls, and rooms following the SHEET 4.3 TECHNICAL- Architectural
schedule VOCATIONAL drafting design
Architectural drafting HIGH SCHOOLS standards
design standards (Page (Page 82)
79-81)
2nd QUARTER
5.1 Indicate the dimensions of CBLM: OPERATION DEPED -PUBLIC CBLM: OPERATION
the roof plan based on the SHEET 5.1 Draft a roof TECHNICAL- SHEET 5.1
floor plan plan Step 1 and 2 (Page VOCATIONAL PROCEDURE ON
105-106) HIGH SCHOOLS ROOF PLAN
5.4 Layout drawings according . Sheet # 3 - Roof Plan, DEPED-LM Layout Roof Plan,
to sheet contents Truss Diagram, Truss Truss Diagram,
Connection Details and Truss Connection
Construction Notes Details and
(Page 55) Construction Notes
With title block and
contents
5.5 Draw framing details of CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
roof plan according to SHEET # 2.1 TECHNICAL- # 2.4 Draft a Roof
architectural drafting VOCATIONAL Framing Plan
Draft Structural Roof HIGH SCHOOLS Procedure:
standards Framing Plans (Concrete)
(Page 29-37)
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)
6.1 Draw vertical heights from CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
finish floor line to ceiling line SHEET 6.1 In accordance TECHNICAL- 6.1
according to architectural with the National Building VOCATIONAL Procedure in
drafting standards Code of the Philippines HIGH SCHOOLS drafting ceiling
(PD 1096) Section 805: plans
Ceiling Heights Step 1-3
Week 4 - 6 (Page 118) (Page 119-120)
6.2 Indicate lighting fixtures CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
and fire protection devices on SHEET 6.1 Important TECHNICAL- 6.1
the ceiling plan based on features that are shown in VOCATIONAL Procedure in
architectural drafting the ceiling plan HIGH SCHOOLS drafting ceiling
plans
standards
Step 4-5
(Page 121)
8.1 Follow the SOP when CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
submitting the completed SHEET # 8.1 TECHNICAL- # 8.1
drawing to appropriate Perform Presentation VOCATIONAL Perform
personnel (e.g., Engineer, Drawings (Page 153-156) HIGH SCHOOLS Presentation
Architect) Drawings
8.2 Note comments and 1. Draft the floor
corrections for final drawings plan according to
following the SOP the desired size
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)
3rd QUARTER
LESSON 4: DRAFTING STRUCTURAL LAYOUT AND DETAILS (SL)
LO 1. Draft foundation
plans
1.1 Indicate the locations of CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
wall footings, footings, and SHEET # 1.1 TECHNICAL- # 1.2 Drafting a
columns in drafting the floor Design of Foundation VOCATIONAL Foundation Plans
plan (Page 6-9) HIGH SCHOOLS Procedure:
Week 1 - 2 Step 1-2 (Page 19)
1.2 Draw in a larger scale CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
details of wall footings, SHEET # 1.2 TECHNICAL- # 1.2 Drafting a
footings, and columns Foundation Members VOCATIONAL Foundation Plans
(Page 12-17) HIGH SCHOOLS Procedure:
Step 3-5 (Page 20-
21)
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)
LO 2. Draft structural
floors and roof framing
plans
2.1 Draft structural floor and CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
roof framing plans based on SHEET # 2.1 TECHNICAL- # 2.2
floor and foundation plans Draft Structural Floor VOCATIONAL Drafting a concrete
using timber, concrete, or and Roof Framing Plans HIGH SCHOOLS Two-way slab
steel construction (Concrete) (Page 29-37) Procedures
OPERATION SHEET
# 2.3 Drafting a
Structural Timber
Week 3-5 Floor Plan
Procedures
OPERATION SHEET
# 2.4 Draft a Roof
Framing Plan
Procedure:
1.1 Draft lighting and power CBLM:INFORMATION DEPED -PUBLIC OPERATION SHEET
layouts according to electrical SHEET # 1.3 TECHNICAL- # 1.5 Draft
drafting standards Lighting and VOCATIONAL electrical plans and
HIGH SCHOOLS layouts
General Rules to Observe
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)
1.2 Place riser diagram and CBLM:INFORMATION DEPED -PUBLIC OPERATION SHEET
circuiting symbols in electrical SHEET # 1.1 TECHNICAL- # 1.5 Draft electricl
plans and layouts according to Electrical Circuits VOCATIONAL plans and layouts
Electrical Code Circuit Diagram Symbol HIGH SCHOOLS Procedure: STEP
(Page 9) 5-6
(Page 30)
1.3 Indicate legend and CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
general notes according to SHEET # 1.2 TECHNICAL- # 1.5 Draft electricl
local power service provider Electrical Legend Electrical VOCATIONAL plans and layouts
Notes and Specifications HIGH SCHOOLS Procedure: STEP
7-10
(Page 30)
2.1 Layout fire alarm and CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
protection system symbols in SHEET # 2.2 TECHNICAL- # 2.2
the auxiliary system and Fire Alarm System VOCATIONAL Draft auxiliary
layout plan according to Fire (Page 39-40) HIGH SCHOOLS systems and
Code FIRE CODE (Page 41) layout-Fire Alarm
System
(Page 43-44)
2.2 Layout electronic and CBLM INFORMATION DEPED -PUBLIC OPERATION SHEET
communication devices SHEET # 2.3 TECHNICAL- # 2.3 Draft
according to electrical drafting Cable Television (Pg. 46) VOCATIONAL auxiliary systems
requirements Intercommunication HIGH SCHOOLS and layout -
Device (Pg. 47-48) Electronic and
Building Management communication
Systems (Pg. 49-50) devices
(Page 52-53)
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)
QUARTER 4
LO 1. Draft water
distribution system
1.1 Draft hot and cold water TLE LM: DEPED-LEARNING TLE LM:
distribution systems according What to Know: MATERIALS What to Process:
to Plumbing and Water Codes Draft Water Distribution lay-out the
System plumbing system in
(Page 296- 300) the floor
plan. Procedure:
Step 1-3 (Page
Week 1 - 2
316)
Enrichment
Activity: Draft
Septic Vault (Pg.
340-341)
2.2 Draft storm drainage plan TLE LM DEPED-LEARNING TLE LM:
according to Plumbing Code What to Know: MATERIALS Reflect and
The Drainage System Understand
(Page333-337) Draft Storm
Drainage Plan
(Page 338-339)
2.3 Draw details and symbols TLE LM: DEPED-LEARNING TLE LM:
according to sanitary and What to Know: MATERIALS What to Process:
plumbing requirements Common Plumbing
Symbols Draft Household
(Page 302-307) Sanitary Layout
Procedure Step 3-4
(Page 330-332)
(Page 376)
1.2 Indicate signs and TLE LM: DEPED-LEARNING TLE LM: Give the
symbols according to Mechanical Symbols and MATERIALS meaning of the
mechanical layout and detail Abbreviations (Page 349) following
requirements acronyms/symbols.
(Page 371)
LO 2. Draft mechanical
details of conveyor system
2.1 Draw elevator, escalators, DEPED-LEARNING TLE LM:
dumbwaiter, and moving TLE LM: What to Know MATERIALS Reflect and
ramp systems according to Escalators, Conveyors, Understand
Week 7-8
Mechanical Code and Elevators (Pg. 382- Draft the existing
2.2 Draw details of mechanical 386) illustrated sample
conveyor system according to Mechanical plan
mechanical layout and detail (Page 390-391)
requirements
LO 3. Draft fire protection
systems
3.1 Draw fire sprinkler system TLE LM: What to Know DEPED-LEARNING TLE LM:
according to Fire Code Requirements for fire MATERIALS What toTransfer
safety (Page 393) Drafting Fire
Fire Extinguishing System Protection Systems
(Page 394-395) Procedure
Week 9-10 Step 1-2(Pg. 396)
3.2 Draw signs and symbols of TLE LM: What to Know DEPED-LEARNING TLE LM:
fire protection systems Building Classifications MATERIALS What toTransfer
according to fire protection (393-394) Drafting Fire
requirements Protection Systems
Procedure
Step 3-4(Pg. 396)
1st Quarter
1.2 Explore CAD working Learner’s Module Entitled: DepEd Quiz is attached in
environment INTRODUCTION TO CADD the Learner’s
SYSTEM Module.
pp. 50-57
1.3 Manipulate CAD features Learner’s Module Entitled: DepEd Quiz is attached in
as per job requirement BASIC DRAWING TOOLS the Learner’s
AND Module.
Week 3-10 MODIFYING OBJECTS
pp. 58-76
2nd Quarter
3rd Quarter
LESSON 4: DRAFTING STRUCTURAL LAYOUT AND DETAILS USING CAD (LC)
LO 1. Draft foundation
plans
1.1 Indicate the locations of Learner’s Module Entitled: DepEd Performance Task
wall footings, footings, and DRAFTING FOUNDATION & Quiz is attached
Week 1-2 columns in drafting the floor PLAN in the Learner’s
plan pp. 125-131 Module
1.2 Draw on a larger scale
details of wall footings,
footings, and columns
LO 2. Draft structural
floors and roof framing
plans
2.1 Draft structural floor and Learner’s Module Entitled: DepEd Performance Task
roof framing plans based on DRAFTING STRUCTURAL & Quiz is attached
floor and foundation plans FLOOR AND ROOF in the Learner’s
Week 3-5
using timber, concrete, or FRAMING PLANS Module
steel construction pp. 132-147
2.2 Draft structural floor and
roof beams showing sizes,
shapes, and detailed
connections
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)
LESSON 5: DRAFTING ELECTRICAL AND ELECTRONIC LAYOUT AND DETAILS USING CAD (EC)