0% found this document useful (0 votes)
807 views18 pages

TLE-9-12-Technical-Drafting-NC-II-MATRIX (ROSALIJOS)

This document provides a matrix of curriculum standards and recommended learning materials for a Technical Drafting course over two grading periods. It outlines 4 main learning competencies: 1) Prepare architectural job requirements, 2) Prepare and set up tools and materials for drawing, 3) Draft site development plan, and 4) Draft floor plans. For each competency, it lists the specific learning objectives, suggested learning resources such as information sheets and lesson exemplars, the resource developers, any available online links, and assessments.

Uploaded by

Lito Rosalijos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
807 views18 pages

TLE-9-12-Technical-Drafting-NC-II-MATRIX (ROSALIJOS)

This document provides a matrix of curriculum standards and recommended learning materials for a Technical Drafting course over two grading periods. It outlines 4 main learning competencies: 1) Prepare architectural job requirements, 2) Prepare and set up tools and materials for drawing, 3) Draft site development plan, and 4) Draft floor plans. For each competency, it lists the specific learning objectives, suggested learning resources such as information sheets and lesson exemplars, the resource developers, any available online links, and assessments.

Uploaded by

Lito Rosalijos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Matrix of Curriculum Standards (Competencies) with Corresponding Recommended Flexible

Learning Delivery Mode and Materials per Grading Period

GRADE 9-12 TECHNOLOGY AND LIVELIHOOD EDUCATION


Technical Drafting NC II (160 hours)

Learning competencies
Week of the Lesson Exemplar/ Link (if available Assessment
(Grade 9-12 TLE: Technical LR developer
Quarter/ Learning resources online) (provide a link if
Grading Period
Drafting)
available online)
1st QUARTER

LESSON 3: DRAFTING ARCHITECTURAL LAYOUT AND DETAILS (AL)

LO 1. Prepare architectural
job requirements

1.2. Prepare tools, DEPED- PUBLIC ACTIVITY SHEET #


materials, and equipment CBLM: Information sheet TECHNICAL- 1.1
in technical drawing 1.1 VOCATIONAL
Review on drafting tools, HIGH SCHOOLS
1.4. Select drawing tools, SELF CHECK 1.1
materials, and equipment materials and equipment,
in accordance with the their uses and care
Week 1 SOP

1.6. Assess architectural DEPED -PUBLIC SELF-CHECK 1.2


job requirements based TECHNICAL-
on SOP CBLM: Information sheet VOCATIONAL
1.2 ARCHITECTURAL HIGH SCHOOLS
1.4. Interpret blueprint WORKING DRAWINGS OPERATION
according to architectural SHEET 1.1
layout drawing/job
requirements following SOP
and work instructions
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

LO 2. Prepare and set up


tools and materials for
drawing

2.1 Observe OHS policies CBLM: INFORMATION DEPED -PUBLIC SELF CHECK 2.2
and procedures in SHEET 2.2 important TECHNICAL-
setting-up tools and Practices that must be VOCATIONAL
materials for drawing observed in the work HIGH SCHOOLS
station or work place
Week 2 2.2 Prepare drawing tools, CBLM: INFORMATION PUBLIC SELF CHECK 2.1
materials and equipment SHEET 2.1 TECHNICAL-
based on job The Importance of VOCATIONAL
requirements Drawing tools, materials HIGH SCHOOLS
and equipment

2.3 Set up tools, materials, CBLM: INFORMATION DEPED PUBLIC ACTIVITY SHEET #
and equipment based on the SHEET 2.2 Procedure in TECHNICAL- 1.1
job requirements Setting up Drawing tools, VOCATIONAL
Materials and Equipment HIGH SCHOOLS
and standard procedure

Week 3-5 LO 3. Draft site


development plan

3.1 Draw a technical descrip- CBLM: INFORMATION DEPED-PUBLIC ACTIVITY SHEET #


tion of a lot according to the SHEET 3.2 TECHNICAL- 3.2
approved lot survey LOT MENSURATION AND VOCATIONAL (PAGE 54)
PLOTTING HIGH SCHOOLS

3.2 Draw a building footprint CBLM: INFORMATION DEPED -PUBLIC


according to the architectural SHEET 3.2 TECHNICAL-
drafting standards Procedure in Lot Plotting VOCATIONAL
HIGH SCHOOLS

3.3 Draw a title block TLE LM: TITLE BLOCK IN DEPED- LEARNING Draw title block in
according to the architectural HOUSE PLAN (Page 45) MATERIAL
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

drafting standards House Plan


(Page 45)

3.4 Indicate dimension lines, CBLM:INFORMATION DEPED-PUBLIC OPERATION SHEET


dimensions, and drawing titles SHEET 3.1 TECHNICAL- 3.2
according to architectural VOCATIONAL PAGE 56
drafting standards DRAFT SITE HIGH SCHOOLS
DEVELOPMENT PLAN

LO 4. Draft floor plans

4.1 Draw walls, windows, CBLM:INFORMATION DEPED -PUBLIC Operation sheet no.
doors, fixtures, and SHEET 4.1 TECHNICAL- 4.1 Procedure in
fittings according to FLOOR PLAN FEATURES VOCATIONAL drawing a floor
architectural design (Page 65-72) HIGH SCHOOLS plan.
standards (Page 83-90)
4.2 Draw grid and dimension CBLM:INFORMATION DEPED -PUBLIC
lines according to SHEET 4.3 Architectural TECHNICAL-
architectural design drafting design standards VOCATIONAL
standards (Page 77-78) HIGH SCHOOLS
Week 6-10

4.3 Use metric scale system CBLM: INFORMATION DEPED -PUBLIC SELF CHECK 4.2
according to the SHEET 4.2 TECHNICAL- Use of appropriate
magnitude of the plan Use of appropriate scale VOCATIONAL scale
in drawing a Floor Plan HIGH SCHOOLS (Page 76)
(Page 73-75)

4.4 Identify sizes of doors, CBLM: INFORMATION DEPED -PUBLIC SELF CHECK 4.3
walls, and rooms following the SHEET 4.3 TECHNICAL- Architectural
schedule VOCATIONAL drafting design
Architectural drafting HIGH SCHOOLS standards
design standards (Page (Page 82)
79-81)
2nd QUARTER

LESSON 3: DRAFTING ARCHITECTURAL LAYOUT AND DETAILS (AL)


Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

LO 5. Draft roof plans

5.1 Indicate the dimensions of CBLM: OPERATION DEPED -PUBLIC CBLM: OPERATION
the roof plan based on the SHEET 5.1 Draft a roof TECHNICAL- SHEET 5.1
floor plan plan Step 1 and 2 (Page VOCATIONAL PROCEDURE ON
105-106) HIGH SCHOOLS ROOF PLAN

5.2 Draw roof plans according CBLM: OPERATION DEPED -PUBLIC


to drafting standards SHEET 5.1 Draft a roof TECHNICAL-
plan Step 3 to 7 (Page VOCATIONAL
106-108) HIGH SCHOOLS

5.3 Use standard architectural CBLM: OPERATION DEPED -PUBLIC


symbols in drafting roof plans SHEET 5.1 Draft a roof TECHNICAL-
plan Step 8 Complete the VOCATIONAL
drawings with proper HIGH SCHOOLS
dimensioning and labels,
Week 1-3
then finalize the drawing
(Page 109)

5.4 Layout drawings according . Sheet # 3 - Roof Plan, DEPED-LM Layout Roof Plan,
to sheet contents Truss Diagram, Truss Truss Diagram,
Connection Details and Truss Connection
Construction Notes Details and
(Page 55) Construction Notes
With title block and
contents
5.5 Draw framing details of CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
roof plan according to SHEET # 2.1 TECHNICAL- # 2.4 Draft a Roof
architectural drafting VOCATIONAL Framing Plan
Draft Structural Roof HIGH SCHOOLS Procedure:
standards Framing Plans (Concrete)
(Page 29-37)
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

LO 6. Draft ceiling plans

6.1 Draw vertical heights from CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
finish floor line to ceiling line SHEET 6.1 In accordance TECHNICAL- 6.1
according to architectural with the National Building VOCATIONAL Procedure in
drafting standards Code of the Philippines HIGH SCHOOLS drafting ceiling
(PD 1096) Section 805: plans
Ceiling Heights Step 1-3
Week 4 - 6 (Page 118) (Page 119-120)

6.2 Indicate lighting fixtures CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
and fire protection devices on SHEET 6.1 Important TECHNICAL- 6.1
the ceiling plan based on features that are shown in VOCATIONAL Procedure in
architectural drafting the ceiling plan HIGH SCHOOLS drafting ceiling
plans
standards
Step 4-5
(Page 121)

Week 7-9 LO 7. Draft elevations and


sections

7.1 Draw vertical heights from DEPED -PUBLIC OPERATION SHEET


grade line according to CBLM: INFORMATION TECHNICAL- 7.1
architectural drafting SHEET # 7.1 ELEVATION VOCATIONAL Procedure in
standards PROJECTION (Page 127- HIGH SCHOOLS drafting elevations:
133) Step 1 (page 136)

7.2 Project offsets from right, OPERATION SHEET


left, and rear sides of floor 7.1
plan according to Procedure in
architectural drafting drafting elevations:
Step 2
standards
(page 136)

7.3 Draw roof eaves and OPERATION SHEET


pitch on all elevations and 7.1
sections according to Procedure in
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

architectural drafting drafting elevations:


standards Step 3-4
(page 137)

7.4 Project doors and OPERATION SHEET


windows in all elevations and 7.1
sections Procedure in
drafting elevations:
Step 5
(page 138)

7.5 Project cross and INFORMATION SHEET # OPERATION SHEET


longitudinal section views 7.2 # 7.2
from the floor plans and SECTION VIEWS (Page Drafting Section
elevations 139-146) Procedure
Step 1-2 (Page
147-148)

7.6 Indicate various material OPERATION SHEET


symbols and specifications in # 7.2
all elevations and sections Drafting Section
Procedure
Step 3-7 (Page
149-150)

Week 10 LO 8. Submit complete


drawings

8.1 Follow the SOP when CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
submitting the completed SHEET # 8.1 TECHNICAL- # 8.1
drawing to appropriate Perform Presentation VOCATIONAL Perform
personnel (e.g., Engineer, Drawings (Page 153-156) HIGH SCHOOLS Presentation
Architect) Drawings
8.2 Note comments and 1. Draft the floor
corrections for final drawings plan according to
following the SOP the desired size
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

8.3 Integrate comments and and shape. 2. Draft


corrections into the final the elevation plan
drawing based on job based on the floor
requirements plan. 3. Draft
section drawing
based on the
elevations and floor
plan. 4. Draft the
perspective view.

8.4 Perform housekeeping POWERPOINT: ROSALIJOS, Perform


procedures following the SOP Workplace LITO JR. P. housekeeping
Housekeeping - Basic LALAPROPER IS. procedures
Guide LDN ATTACHED IN PPT.

3rd QUARTER
LESSON 4: DRAFTING STRUCTURAL LAYOUT AND DETAILS (SL)
LO 1. Draft foundation
plans

1.1 Indicate the locations of CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
wall footings, footings, and SHEET # 1.1 TECHNICAL- # 1.2 Drafting a
columns in drafting the floor Design of Foundation VOCATIONAL Foundation Plans
plan (Page 6-9) HIGH SCHOOLS Procedure:
Week 1 - 2 Step 1-2 (Page 19)

1.2 Draw in a larger scale CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
details of wall footings, SHEET # 1.2 TECHNICAL- # 1.2 Drafting a
footings, and columns Foundation Members VOCATIONAL Foundation Plans
(Page 12-17) HIGH SCHOOLS Procedure:
Step 3-5 (Page 20-
21)
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

LO 2. Draft structural
floors and roof framing
plans

2.1 Draft structural floor and CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
roof framing plans based on SHEET # 2.1 TECHNICAL- # 2.2
floor and foundation plans Draft Structural Floor VOCATIONAL Drafting a concrete
using timber, concrete, or and Roof Framing Plans HIGH SCHOOLS Two-way slab
steel construction (Concrete) (Page 29-37) Procedures

OPERATION SHEET
# 2.3 Drafting a
Structural Timber
Week 3-5 Floor Plan
Procedures

OPERATION SHEET
# 2.4 Draft a Roof
Framing Plan
Procedure:

2.2 Draft structural floor and OPERATION SHEET


roof beams showing sizes, # 2.4.1
shapes, and detailed
connections Draft a Truss Detail
Procedures

LESSON 5: DRAFTING ELECTRICAL AND ELECTRONIC LAYOUT AND DETAILS (EL)

Week 6-7 LO 1. Draft electrical plans


and layouts

1.1 Draft lighting and power CBLM:INFORMATION DEPED -PUBLIC OPERATION SHEET
layouts according to electrical SHEET # 1.3 TECHNICAL- # 1.5 Draft
drafting standards Lighting and VOCATIONAL electrical plans and
HIGH SCHOOLS layouts
General Rules to Observe
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

in Illumination Planning Procedure: STEP


1-4
(Page 30)

1.2 Place riser diagram and CBLM:INFORMATION DEPED -PUBLIC OPERATION SHEET
circuiting symbols in electrical SHEET # 1.1 TECHNICAL- # 1.5 Draft electricl
plans and layouts according to Electrical Circuits VOCATIONAL plans and layouts
Electrical Code Circuit Diagram Symbol HIGH SCHOOLS Procedure: STEP
(Page 9) 5-6
(Page 30)

1.3 Indicate legend and CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
general notes according to SHEET # 1.2 TECHNICAL- # 1.5 Draft electricl
local power service provider Electrical Legend Electrical VOCATIONAL plans and layouts
Notes and Specifications HIGH SCHOOLS Procedure: STEP
7-10
(Page 30)

Week 8-10 LO 2. Draft auxiliary


system and layout

2.1 Layout fire alarm and CBLM: INFORMATION DEPED -PUBLIC OPERATION SHEET
protection system symbols in SHEET # 2.2 TECHNICAL- # 2.2
the auxiliary system and Fire Alarm System VOCATIONAL Draft auxiliary
layout plan according to Fire (Page 39-40) HIGH SCHOOLS systems and
Code FIRE CODE (Page 41) layout-Fire Alarm
System
(Page 43-44)

2.2 Layout electronic and CBLM INFORMATION DEPED -PUBLIC OPERATION SHEET
communication devices SHEET # 2.3 TECHNICAL- # 2.3 Draft
according to electrical drafting Cable Television (Pg. 46) VOCATIONAL auxiliary systems
requirements Intercommunication HIGH SCHOOLS and layout -
Device (Pg. 47-48) Electronic and
Building Management communication
Systems (Pg. 49-50) devices
(Page 52-53)
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

QUARTER 4

LESSON 6: DRAFTING SANITARY AND PLUMBING LAYOUT AND DETAILS (SP)

LO 1. Draft water
distribution system

1.1 Draft hot and cold water TLE LM: DEPED-LEARNING TLE LM:
distribution systems according What to Know: MATERIALS What to Process:
to Plumbing and Water Codes Draft Water Distribution lay-out the
System plumbing system in
(Page 296- 300) the floor
plan. Procedure:
Step 1-3 (Page
Week 1 - 2
316)

1.2 Indicate signs and TLE LM: DEPED-LEARNING TLE LM:


symbols according to sanitary What to Know: MATERIALS What to Process:
and plumbing requirements Common Plumbing Lay-out the
Symbols plumbing system in
(Page 302-307) the floor
plan. Procedure:
Step 4-5 (Page
317)

Week 3-4 LO 2. Draft sanitary and


storm drainage

2.1 Draw sewerage plan TLE LM DEPED-LEARNING TLE LM:


layout according to Plumbing What to Know: MATERIALS What to Process:
Code The Sewage Disposal
System (Page 324-329) Draft Household
Sanitary Layout
Procedure Step 1-2
(Page 330-332)
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

Enrichment
Activity: Draft
Septic Vault (Pg.
340-341)
2.2 Draft storm drainage plan TLE LM DEPED-LEARNING TLE LM:
according to Plumbing Code What to Know: MATERIALS Reflect and
The Drainage System Understand
(Page333-337) Draft Storm
Drainage Plan
(Page 338-339)

Draft Catch Basin


(Page 343)

2.3 Draw details and symbols TLE LM: DEPED-LEARNING TLE LM:
according to sanitary and What to Know: MATERIALS What to Process:
plumbing requirements Common Plumbing
Symbols Draft Household
(Page 302-307) Sanitary Layout
Procedure Step 3-4
(Page 330-332)

LESSON 7: DRAFTING MECHANICAL LAYOUT AND DETAILS (ML)

Week 5-6 LO 1. Draft heating,


ventilating, and air-
conditioning systems
layout
1.1 Draft HVAC systems TLE LM: DEPED-LEARNING TLE LM: Reflect
according to Mechanical Code Heating, Ventilating, and MATERIALS and Understand
Air Conditioning (HVAC) “Draft a residential
(page 346-348) HVAC Layout from
the floor plan
specified in below
and give details on
the following:”
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

(Page 376)
1.2 Indicate signs and TLE LM: DEPED-LEARNING TLE LM: Give the
symbols according to Mechanical Symbols and MATERIALS meaning of the
mechanical layout and detail Abbreviations (Page 349) following
requirements acronyms/symbols.
(Page 371)
LO 2. Draft mechanical
details of conveyor system
2.1 Draw elevator, escalators, DEPED-LEARNING TLE LM:
dumbwaiter, and moving TLE LM: What to Know MATERIALS Reflect and
ramp systems according to Escalators, Conveyors, Understand
Week 7-8
Mechanical Code and Elevators (Pg. 382- Draft the existing
2.2 Draw details of mechanical 386) illustrated sample
conveyor system according to Mechanical plan
mechanical layout and detail (Page 390-391)
requirements
LO 3. Draft fire protection
systems
3.1 Draw fire sprinkler system TLE LM: What to Know DEPED-LEARNING TLE LM:
according to Fire Code Requirements for fire MATERIALS What toTransfer
safety (Page 393) Drafting Fire
Fire Extinguishing System Protection Systems
(Page 394-395) Procedure
Week 9-10 Step 1-2(Pg. 396)

3.2 Draw signs and symbols of TLE LM: What to Know DEPED-LEARNING TLE LM:
fire protection systems Building Classifications MATERIALS What toTransfer
according to fire protection (393-394) Drafting Fire
requirements Protection Systems
Procedure
Step 3-4(Pg. 396)
1st Quarter

LESSON 3: PREPARING COMPUTER-AIDED DRAWING (CA)


Week 1-2 LO 1. Operate CAD
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

software and computer


hardware
1.1 Identify CAD software Learner’s Module Entitled: DepEd Quiz is attached in
features according to the OPERATING CAD the Learner’s
software provider SOFTWARE AND Module.
COMPUTER HARDWARE
pp. 43-49

1.2 Explore CAD working Learner’s Module Entitled: DepEd Quiz is attached in
environment INTRODUCTION TO CADD the Learner’s
SYSTEM Module.
pp. 50-57
1.3 Manipulate CAD features Learner’s Module Entitled: DepEd Quiz is attached in
as per job requirement BASIC DRAWING TOOLS the Learner’s
AND Module.
Week 3-10 MODIFYING OBJECTS
pp. 58-76

2nd Quarter

LESSON 3: PREPARING COMPUTER-AIDED DRAWING (CA)

Week 1-10 LO 2. Prepare plan using


CAD
2.1 Observe OHS policies and Power Point Presentation LUCKY REY P. Quiz is attached in
procedures in when preparing Entitled: ROSALIJOS, LALA the Power Point
plan using CAD OHS Policies and NHS, LDN Presentation
Procedures in Preparing
Plan using CAD
2.2 Set up drawings according Learner’s Module Entitled: DEPED Quiz is attached in
to standard drawing scale and Drawing Aids the Learner’s
paper size pp. 77-89 Module.
2.3 Prepare working drawings Learner’s Module Entitled: Quiz is attached in
using CAD software as per DEPED the Learner’s
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

building standards Preparing Plan Using CAD Module.


pp. 90-118

Power Point Presentation LUCKY REY P. Performance Test


Entitled: ROSALIJOS, LALA and Quiz is
1. Drafting Floor Plan NHS, LDN attached in the
2. Drafting Roofing Plan Power Point
3. Drafting Elevation Presentation
Views
Drafting Section Views

3rd Quarter
LESSON 4: DRAFTING STRUCTURAL LAYOUT AND DETAILS USING CAD (LC)
LO 1. Draft foundation
plans
1.1 Indicate the locations of Learner’s Module Entitled: DepEd Performance Task
wall footings, footings, and DRAFTING FOUNDATION & Quiz is attached
Week 1-2 columns in drafting the floor PLAN in the Learner’s
plan pp. 125-131 Module
1.2 Draw on a larger scale
details of wall footings,
footings, and columns
LO 2. Draft structural
floors and roof framing
plans
2.1 Draft structural floor and Learner’s Module Entitled: DepEd Performance Task
roof framing plans based on DRAFTING STRUCTURAL & Quiz is attached
floor and foundation plans FLOOR AND ROOF in the Learner’s
Week 3-5
using timber, concrete, or FRAMING PLANS Module
steel construction pp. 132-147
2.2 Draft structural floor and
roof beams showing sizes,
shapes, and detailed
connections
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

LESSON 5: DRAFTING ELECTRICAL AND ELECTRONIC LAYOUT AND DETAILS USING CAD (EC)

LO 1. Draft electrical plans


and layouts
1.1.2. Draft lighting Learner’s Module Entitled: DepEd Performance Task
and power layouts DRAFTING ELECTRICAL & Quiz is attached
according to electrical PLANS AND LAYOUT in the Learner’s
drafting standards pp. 149-154 Module
1.1.4. Place riser
diagram and circuiting
Week 6-7
symbols in electrical
plans and layouts
according to Electrical
Code
1.1.6. Indicate
legend and general notes
according to local power
service provider
LO 2. Draft auxiliary
system and layout
2.1 Layout fire alarm and Learner’s Module Entitled: DEPED Performance Task
protection system symbols DRAFTING AUXILIARY & Quiz is attached
in the auxiliary system SYSTEM USING CAD in the Learner’s
Week 8-10 and layout plan according Module
to Fire Code
2.2 Layout electronic and
communication devices
according to electrical
drafting requirements
4th Quarter
LESSON 6: DRAFTING SANITARY AND PLUMBING LAYOUT AND DETAILS USING CAD (SC)
Week 1 LO 1. Draft water
distribution system
1.1 Draft hot and cold water Learner’s Module Entitled: DepEd Performance Task
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

distribution systems according DRAFTING WATER & Quiz is attached


to Plumbing and Water Codes DISTRIBUTION SYSTEM in the Learner’s
1.2 Indicate signs and pp. 165-169 Module
symbols according to sanitary
and plumbing requirements
LO 2. Draft sanitary and
storm drainage
2.1 Draw sewerage plan Learner’s Module Entitled: DepEd Performance Task
layout according to Plumbing DRAFTING STORM & Quiz is attached
Code DRAINAGE PLAN USING in the Learner’s
Week 2-3
2.2 Draft storm drainage plan CAD Module
according to Plumbing Code pp. 170-174
2.3 Draw details and symbols
according to sanitary and
plumbing requirements
LESSON 7: DRAFTING MECHANICAL LAYOUT AND DETAILS USING CAD (DC)
LO 1. Draft HVAC systems
layout
1.2. Draft HVAC systems Learner’s Module Entitled: DEPED Performance Task
according to Mechanical DRAFTING HEATING, & Quiz is attached
Week 4-5 Code VENTILATING AND AIR- in the Learner’s
1.4. 1.2 Indicate signs and CONDITIONING Module
symbols according to (HVAC) SYSTEMS USING
mechanical layout and
CAD
detail requirements
PP. 180-186
LO 2. Draft mechanical
details of conveyor system
2.1 Draw elevator, escalators, Learner’s Module Entitled: DEPED Performance Task
dumbwaiter, and moving DRAFTING MECHANICAL & Quiz is attached
ramp systems according DETAILS OF CONVEYOR in the Learner’s
Week 6-7
to Mechanical Code SYSTEMS USING CAD Module
2.2 Draw details of mechanical pp. 187-188
conveyor system according to
mechanical layout and detail
requirements
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

LO 3. Draft fire protection


systems
3.1 Draw fire sprinkler system Learner’s Module Entitled: DEPED Performance Task
according to Fire Code DRAFTING FIRE & Quiz is
Week 8-9 attached in
3.2 Draw signs and symbols of PROTECTION SYSTEM
fire protection systems USING CAD the Learner’s
according to fire protection PP. 190-195 Module
requirements
LO 4. Draft gas piping
system
4.1 Draft gas piping layout POWERPOINT ROSALIJOS, ATTACHED IN PPT
Week 10 according to Mechanical Code PRESENTATION: LITO JR. P. DRAW LAYOUT
4.2 Draw signs and symbols GAS PIPING SYSTEM LALA PROPER GAS PIPING
according to mechanical IS. ,LDN SYSTEM BASED
layout and detail requirements ON A PLAN.
ENVIRONMENT AND
MARKET
LO 1. Develop a product/
service in Technical
Drafting
1.1 Identify what is of “Value” TLE LM: DEPED-LM Activity 1 Mini-
The
to the customer Needs and Wants of survey
specialist
1.2 Identify the customer to People PP. 25
suggests
sell to PP. 19-20
that these
competencie 1.3 Explain what makes a TLE LM: DEPED-LM Activity 3: Survey
s must be product unique and Generating Ideas for Questionnaire to
taught on competitive Business PP. 19-20 Determine Potential
the latter 1.4 Apply creativity and Costumers
part Innovative techniques to PP. 26
develop marketable product
1.5 Employ a Unique Selling
Proposition (USP) to the
product/service
LO 2. Select a business
idea based on the criteria
Week of the Learning competencies Lesson Exemplar/ LR developer Link (if available online) Assessment
Quarter/ Grading (Grade 9-12 TLE: Technical Learning resources (provide a link if
Period Drafting) available online)

and techniques set


2.1 Enumerate various criteria TLE LM: Activity 2
and steps in selecting a ENTITLED: Selecting Screening business
business idea the Right Idea ideas
PP. 22 PP. 25
2.2 Apply the criteria/steps in TLE LM: DEPED-LM Activity 4: Survey
selecting a viable business ENTITLED: Questionnaire to
idea : Environmental Scanning Determine Potential
2.3 Determine a business idea PP.23 Competitors
based on the
criteria/techniques set
Utilize the
succeeding guide
questions during a
focused group
discussion to
identify potential
competitor.

You might also like