The document discusses emergency shutdown levels for process plants and outlines the ESD levels 0 through 3 and what each level involves.

ESD Level 0 initiates an emergency shutdown and depressurization of the overall plant. ESD Level 1 shuts down all process units. ESD Level 2 shuts down an entire process unit. ESD Level 3 involves local shutdowns of individual units or trains based on process upsets.

The blowdown is initiated automatically following a Level 0 shutdown or manually following Level 1, 2 or shutdown.

Client Ref

CAUSE & EFFECT DIAGRAM OF TARFA#2 EMCO Ref AR1810.00-PRO-LST-002


Rev 00
Date 30/11/2018
Project: Elaboration of FEED documents for the provision of the water injection system.

CAUSE & EFFECT DIAGRAM OF TARFA#2

00 30/11/2018 Issued For Review SKR JMR SCH

Rev Date Description Prepared by Checked by Approved by

page 1 de 5
Client Ref
CAUSE & EFFECT DIAGRAM OF TARFA#2 EMCO Ref AR1810.00-PRO-LST-002
Rev 00
Date 30/11/2018
Project: Elaboration of FEED documents for the provision of the water injection system

'GENERAL NOTES:

1-ESD Shutdown functions and levels

ESD Level 0 : Emergency shutdown and Depressurization of the Overall Plant


A Level 0 shutdown shall be initiated either automatically due from a hard-wired push-button in the CCR or in the field.
The Level 0 shutdown shall shutdown and depressurizes automatically the overall plant. This shall include:
• Isolation of all process units and initiate an automatic blowdown of all hydrocarbon inventory
• Isolation of pipelines
• Tripping of all electrical equipment
• Initiation of audible and visual alarms at the CCR and throughout the plant

ESD Level 1 : Emergency shutdown of all pocess units within the plant
The level 1 shutdown shall be initiated only by an emergency push button located in the CPF control room, or by confirmed fire detection in process areas, or by confirmed gas, or by loss of electrical power, or a major process trip.
The Level 1 shutdown will shutdown the entire process unit by :
•Isolation of all process units and initiate an automatic blowdown of all hydrocarbon inventory
• Tripping of all electrical equipment within unit
• Initiation of audible and visual alarms at the CCR and in the area local to the unit

ESD Level 2 : Operational Shutdown


The level 2 shutdown will shut down and isolate an entire process unit/area (or group of process units where applicable, e.g. a Train).

ESD Level 3 : Local Shutdown


Shutdown of individual process units or trains based on process upsets.

2-Blowdown philosophy
The blowdown is initiated as follows:
- Automatically following level 0 shutdown,
- Manually following level 1 or 2 or shutdown.

page 2 de 5
TAG NO
- Abbreviation

ESD PUSHBOTTON IN CCR


ESD PUSHBOTTON IN CCR
INSTRUMENT
FGS:Fire and Gas System
CCR: Central Control Room
MCC: Motor Control Center
CPF:Center Process Facilitie

DCS: Distributed Control system


ESD: Emergency ShutDown Panel

ESD
ESD

Note1: Blowdown is initiated manually in this case


FUNCTION

Level 1
Level 0
Level
Shutdown
CAUSE

LEVEL 1 ESD
LEVEL 0 ESD

-
-
SERVICE
Project: Elaboration of FEED documents for the provision of the water injection system.

P&ID

-
-
EFFECT

ACTION TAG DESCRIPTION P&ID

4
3
2
1

X
X

1 CLOSE SDV-250 Close SDV-250 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

2 CLOSE SDV-400 Close SDV-400 AR1810.00-PRO-DRW-002-sht 2 of 3


CAUSE & EFFECT DIAGRAM OF TARFA#2

X
X

3 CLOSE SDV-1700 Close SDV-1700 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

4 CLOSE SDV-1720 Close SDV-1720 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

5 CLOSE ESDV-1100 Close SDV-1100 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

6 CLOSE SDV-4051 Close SDV-1150 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

7 CLOSE SDV-2100 Close SDV-2100 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

8 CLOSE SDV-2200 Close SDV-2200 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

9 CLOSE SDV-2300 Close SDV-2300 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

10 CLOSE SDV-2400 Close SDV-2400 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

11 CLOSE SDV-1401 Close SDV-1401 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

12 CLOSE SDV-1200 Close SDV-1200 AR1810.00-PRO-DRW-002-sht 3 of 3


X
X

13 CLOSE SDV-1201 Close SDV-1201 AR1810.00-PRO-DRW-002-sht 3 of 3


X
X

14 CLOSE SDV-1150 Close SDV-1150 AR1810.00-PRO-DRW-002-sht 3 of 3


X
X

15 CLOSE SDV-1000 Close SDV-1000 AR1810.00-PRO-DRW-002-sht 3 of 3


X
X

16 CLOSE SDV-1500 Close SDV-1500 AR1810.00-PRO-DRW-002-sht 3 of 3


X
X

17 OPEN BDV-251 Open BDV-251 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

18 OPEN BDV-401 Open BDV-401 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

19 OPEN BDV-2150 Open BDV-2150 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

20 OPEN BDV-2350 Open BDV-2350 AR1810.00-PRO-DRW-002-sht 2 of 3


X
X

21 ALARM - Audible & Visual Alarm in CCR AR1810.00-PRO-DRW-002-sht 2 of 3


Rev
Date

X
X

22 ALARM - Audible & Visual Alarm in CPF AR1810.00-PRO-DRW-002-sht 2 of 3


Client Ref
EMCO Ref
00
30/11/2018
AR1810.00-PRO-LST-002

page 3 de 5
Client Ref
CAUSE & EFFECT DIAGRAM OF TARFA#2 EMCO Ref AR1810.00-PRO-LST-002
Rev 00
Date 30/11/2018

Project: Elaboration of FEED documents for the provision of the water injection system.

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3
P&ID

-
EFFECT

Stop the Oil Transfer Pump @ LSL -1200

Start the Oil Transfer Pump @ LSH-1200


High High water level Alarm in CPF CCR

High Pressure Alarm in CPF CCR


High Oil Level Alarm in CPF CCR
High Pressure Alarm in CPF CCR

High oil Level Alarm in CPF CCR

Low oil Level Alarm in CPF CCR

Low pressure Alarm in CPF CCR


Low Pressure Alarm in CPF CCR

Audible & Visual Alarm in CPF

Audible & Visual Alarm in CPF


DESCRIPTION

Low water Alarm in CPF CCR

High level alarm in CPF CCR

Stop the Pump PBE-4000


Close of SDV-1200

Close of SDV-1201

Close of SDV-1200

Close SDV-1000

Close SDV-1500
SDV-1200

SDV-1201

SDV-1200

SDV-1000

SDV-1500

PBE-4000
TAG

-
CAUSE

ACTION
INSTRUMENT Shutdown
FUNCTION SERVICE P&ID

ALARM

ALARM

ALARM

ALARM

ALARM

ALARM

11 ALARM

12 ALARM

17 ALARM

18 ALARM

20 ALARM

21 ALARM
16 START
CLOSE

CLOSE

CLOSE

10 CLOSE

13 CLOSE
TAG NO Level

15 STOP

19 STOP
1

9
Water Skimmer MBD-1200 1
PSHL-1200 ESD Level 3 High Pressure in MBD-1200 AR1810.00-PRO-DRW-002-sht 3 of 3 2 X X X
PSHL-1200 ESD Level 3 Low Pressure in MBD-1200 AR1810.00-PRO-DRW-002-sht 3 of 3 3 X X X
LSHH-1200 ESD Level 3 High High water level in MBD-1200 AR1810.00-PRO-DRW-002-sht 3 of 3 4 X X X
LSH-1200 ESD Level 3 High oil level in MBD-1200 AR1810.00-PRO-DRW-002-sht 3 of 3 5 X X
LSL-1200 ESD Level 3 Low Oil level in MBD-1200 AR1810.00-PRO-DRW-002-sht 3 of 3 6 X X
LSL-1201 ESD Level 3 Low water level in MBD-1200 AR1810.00-PRO-DRW-002-sht 3 of 3 7 X
Water injection Tank ABJ-1000 8
LSH-1000 ESD Level 3 High water Level in ABJ-1000 AR1810.00-PRO-DRW-002-sht 3 of 3 9 X X
LSL-1000 ESD Level 3 Low water Level in ABJ-1000 AR1810.00-PRO-DRW-002-sht 3 of 3 10 X X

Water injection Tank ABJ-1500 11


LSH-1500 ESD Level 3 High water Level in ABJ-1500 AR1810.00-PRO-DRW-002-sht 3 of 3 12 X X
LSL-1500 ESD Level 3 Low water Level in ABJ-1500 AR1810.00-PRO-DRW-002-sht 3 of 3 13 X X
Booster Pump PBE-4000 14
PSH-4000 ESD Level 3 High Pressure downstream PBE-4000 AR1810.00-PRO-DRW-002-sht 3 of 3 15 X X
PSL-4000 ESD Level 3 Low Pressure upstream PBE-4000 AR1810.00-PRO-DRW-002-sht 3 of 3 16 X X

Note1: Blowdown is initiated manually in this case

page 4 de 5
Client Ref
CAUSE & EFFECT DIAGRAM OF TARFA#2 EMCO Ref AR1810.00-PRO-LST-002
Rev 00
Date 30/11/2018

Project: Elaboration of FEED documents for the provision of the water injection system.

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3

AR1810.00-PRO-DRW-002-sht 3 of 3
P&ID
EFFECT

DESCRIPTION

High Pressure Alarm in CPF CCR

High Pressure Alarm in CPF CCR

High Pressure Alarm in CPF CCR

Low Pressure Alarm in CPF CCR


Low pressure Alarm in CPF CCR

Low pressure Alarm in CPF CCR

Low pressure Alarm in CPF CCR

Low pressure Alarm in CPF CCR

Audible & Visual Alarm in CPF


Open the valve FCV-5000

Open the valve FCV-5100

Open the valve FCV-5200


Stop the Pump PBA-5000

Stop the Pump PBA-5100

Stop the Pump PBA-5200


Stop the Pump PBE-4500
PAH-4500

PAH-5000

PAH-5100

PAH-5200
FCV-5000

FCV-5100

FCV-5200
PBA-5000

PBA-5100

PBA-5200
PAL-4500

PAL-5000

PAL-5100

PAL-5200
PBE-4500
TAG

-
CAUSE

ACTION
INSTRUMENT Shutdown
FUNCTION SERVICE P&ID

ALARM

ALARM

ALARM

ALARM

ALARM

ALARM

11 ALARM

12 ALARM

15 ALARM
TAG NO Level

OPEN

10 OPEN

14 OPEN
STOP

STOP

STOP

13 STOP
1

9
Booster Pump PBE-4500 1
PSH-4500 ESD Level 3 High Pressure downstream PBE-4500 AR1810.00-PRO-DRW-002-sht 3 of 3 2 X X
PSL-4500 ESD Level 3 Low Pressure upstream PBE-4500 AR1810.00-PRO-DRW-002-sht 3 of 3 3 X X
Triplex pump PBA-5000 4
PSH-5000 ESD Level 3 High Pressure downstream PBA-5000 AR1810.00-PRO-DRW-002-sht 3 of 3 5 X X
PSH-5001 ESD Level 3 High Pressure upstream TRF #6 AR1810.00-PRO-DRW-002-sht 3 of 3 6 X X
PSL-5000 ESD Level 3 Low Pressure downstream PBA-5000 AR1810.00-PRO-DRW-002-sht 3 of 3 7 X X X
PSH-5001 ESD Level 3 Low Pressure upstream TRF #6 AR1810.00-PRO-DRW-002-sht 3 of 3 8 X X X
Triplex pump PBA-5100 9
PSH-5100 ESD Level 3 High Pressure downstream PBA-5100 AR1810.00-PRO-DRW-002-sht 3 of 3 10 X X
PSH-5001 ESD Level 3 High Pressure upstream TRF #6 AR1810.00-PRO-DRW-002-sht 3 of 3 11 X X
PSL-5100 ESD Level 3 Low Pressure downstream PBA-5100 AR1810.00-PRO-DRW-002-sht 3 of 3 12 X X X
PSH-5001 ESD Level 3 Low Pressure upstream TRF #6 AR1810.00-PRO-DRW-002-sht 3 of 3 13 X X X
Triplex pump PBA-5200 14
PSH-5200 ESD Level 3 High Pressure downstream PBA-5200 AR1810.00-PRO-DRW-002-sht 3 of 3 15 X X
PSH-5001 ESD Level 3 High Pressure upstream TRF #6 AR1810.00-PRO-DRW-002-sht 3 of 3 16 X X
PSL-5200 ESD Level 3 Low Pressure downstream PBA-5200 AR1810.00-PRO-DRW-002-sht 3 of 3 17 X X X
PSH-5001 ESD Level 3 Low Pressure upstream TRF #6 AR1810.00-PRO-DRW-002-sht 3 of 3 18 X X X

Note1: Blowdown is initiated manually in this case

page 5 de 5