AMSA - NCW - TP - COB4 - Oven200 - App3 - Work Schedule

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TECHNICAL AND COMMERCIAL OFFER | April 2019 | rev.

00
Enquiry N219011 - Battery N4 Oven 200 through wall repair
Appendix 3. Work schedule COB#4 199-200 AMSA NewCastle Rev.00

Work schedule AMSA NewCastle Battery N4 Oven 199 through wall repair (FW Enquiry - N219010)

Calendar days of repair


№ Description

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
1
2
3
4
5
6
7
8
9
Preparation works before cooling of heating walls 199,200-
inspection of anchorage system, bracing of backstays,
installing of packages for passage of coal charging car and
1
crossover, coke pushing from chambers under repair
198,199,200 and buffer chambers 197, installing of façade
and front bridges
Switch off heating, cooling and dismantling heating walls
2
199,200 under repair

Removal/installing equipment under repaired chambers


3 198,199,200 and heating walls 199,200 (gas outlet
standpipes, frames, flash plates, upper part of backstay,
upper tie-rods, frames of charging hole)
Bricklaying of heating walls 199,200 and roofing of chamber
4
198,199,200
Heating up of heating walls 199,200 through temporary
5
stoves
Works executed from the beginning of heating up till start of
operation of buffer chamber under repair. Control of load
pressure of reinforcing, blowing and pouring grooves of
transverse tie bars, removing of packages for passage of
6
coal charging machine, crossover, fixing beam for backstays
and tie rods, removing bracing bulkheads from buffer and
chamber under repair, blowing of coke chamber
sole(bottom)
Coke charging of buffer ovens and repaired ovens 197, 198,
7
199,200