At Intersection: Wall Base Reinforcing

The document contains a table providing lap splice length requirements for reinforcing bars of various sizes in beams, columns, and walls. The table includes material strengths, standard hook dimensions, and minimum lap splice lengths for different bar diameters under tension. It also lists the unit weight of different structural members like beams and columns. The requirements are based on ACI 318-05 code provisions for development and splicing of reinforcement.

Uploaded by

Jet Arca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
150 views9 pages

At Intersection: Wall Base Reinforcing

The document contains a table providing lap splice length requirements for reinforcing bars of various sizes in beams, columns, and walls. The table includes material strengths, standard hook dimensions, and minimum lap splice lengths for different bar diameters under tension. It also lists the unit weight of different structural members like beams and columns. The requirements are based on ACI 318-05 code provisions for development and splicing of reinforcement.

Uploaded by

Jet Arca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

PARAMETERS TABLE OF LAP SPLICE

MAT'L psi MPa ACI 318- 05 DEV'T &


f'C 3000 21 SPLICE LENGTH
CONTINUOUS HOR. REINF. fy 60000 414 16mm & HIGHER
fyh 40000 276 12mm & LOWER
10 STIRRUPS 10
fyt 40000 fyt 40000 TENSION LAP SPLICE (mm)
UNIT WT.
W= 120 MAX. STANDARD HOOK (mm) BEAM COLUMN
ANCHORAGE BEAM COMP. LAP (kg/m)
(FOR W= 1200 PLUS- Ldh (mm.)
(mm.) LENGTH (mm) SPLICE (mm) CLASS Top Bar Bottom Bar Tied Spiral
@ 400 O.C. CONSULT
A 380 300
200 STRUCTURAL ENGR.) 200 10 600 150 160 110 120-120 300 300 300 0.616
B 490 390
A 450 350
CHB WALL 12 710 710 200 120 130-130 300 350 350 0.888
B 590 460
A 910 700

SEE NOTE NO. 5


CHB WALL 16 950 350 260 130 160-160 460 700 700 1.579
B 1180 910
VERT. BAR A 1140 870
20 1180 440 320 160 200-320 580 B 1480 1130 870 870 2.466
CHB VERT. REINF.
CHB VERT. REINF.
(See Sched. of Reinf.) A 1780 1370
(See Sched. of Reinf.) WINDOW 25 1900 550 400 200 250-400 720 1370 1370 3.854
B 2310 1780
CHB VERT. REINF. DOWELS OPENING

H
SEE NOTES NO.5

A 1990 1530
(To Match Vert. Reinf.) 32 2590 700 480 260 810 2590 1990 1530 1530 4.833
B
CHB HOR. REINF. A 2560 1970
(See Sched. of Reinf.) 36 2990 790 650 360 1040 1900 1900 7.991
B 3330 2560

SUSPENDED SLAB
VERT. BARS MAIN REINFORCEMENTS
TO BE CONTINUOUS

25mm

T/3
T/3
@ 400 O.C. SLAB
SEE NOTE @ 300 0.C
NO.5
100/
40mm
150mm
CHB WALL W= 120 MAX.
(FOR W= 1200 PLUS-
CONSULT
STRUCTURAL ENGR.)

D/3
200 200

D/3

D
D/3
BAR
VERT. BAR
CHB VERT. REINF.
(See Sched. of Reinf.) CHB HOR. REINF. BEAM
400mm

ALTERNATELY PLACED (FOR 3M CMU (See Sched. of Reinf.)


WALL HEIGHT) TYPICAL SLAB AND BEAM
I CONSTRUCTION JOIN DET.
S2.02 NOT TO SCALE.

AT INTERSECTION H CONTINUOUS HOR. REINF.


TYP. CHB STIFFENER DOOR

E BEAM DETAIL C WALL BASE REINFORCING OPENING

S2.02 NOT TO SCALE . S2.02 NOT TO SCALE.


VERT. BARS

FLOOR LINE

ELASTIC SEALANT

CHB VERT. REINF. ALTERNATELY PLACED (FOR 3M F DOOR OPENING ELEVATION


(See Sched. of Reinf.) CMU WALL HEIGHT) S2.02 NOT TO SCALE .

250mm
BAR
POLYURETHANE BEAM/ SLAB
BACKING

CHB WALL
R.C. COLUMN/
R.C. WALL
DRILLED DOWEL BARS W/
EPOXY TO MATCH VERT. REINF.
CHB VERT. REINF. TYP. CHB STIFFENER COLUMN IN PVC PIPE SLEEVE OR FELT
(See Sched. of Reinf.)
E DET. ON CHB WALLS PAPER
S2.02 NOT TO SCALE .
CHB HOR. REINF.
VERT. BAR (See Sched. of Reinf.) POLYURETHANE SEALANT W/
SEE NOTE BACKER ROD ON BOTH SIDES
NO. 5
CHB WALL

AT R.C COLUMN/ WALL CHB VERT. REINF.


(See Sched. of Reinf.)
D WALL REINFORCING
N
S2.02 NOT TO SCALE.
TIO
MA PY
IN FONRCE CO
AT BOTTOM OF BEAM/ SLAB R RE
FO REFE
H INTERIOR WALL SUPPORT
S2.02 NOT TO SCALE.

ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
WF-2

SLOPE ELEV.
C1- F1 (RAMP) C1- F1 C1- F1 C1- F1 C1- F1 C1- F1
WF-1 WF-1 WF-1 WF-1 WF-1 SC-1

SC-1 SC-1 SC-2

WF-2
ELEV. ELEV. ELEV.

WF-2
WF-1
WF-1

WF-1
SC-1
SF-1

WF-1

WF-1

WF-1
WF-1

WF-1
WF-1
WF-2 ELEV.

WF-1
WF-1
WF-1 WF-2 WF-2 WF-2
SC-1 SC-1

WF-1
SC-1 100mm SLAB ON FILL

WF-1
WF-1 ELEV.
C3- F3 WF-2

WF-2
ELEV.

WF-2
WF-1
C2- F2 C1- F1 C1- F1 ELEV. SPACE @ 0.40M.O.C
SC-1
SC-1 WF-1
SC-1 C1- F1
SC-1
WF-1 WF-1 WF-2 WF-1
C1- F1 C1- F1

WF-1

WF-1
WF-1

WF-1
ELEV.

C1- F1 C1- F1 C1- F1


WF-1 WF-1
C1- F1 SC-1 SC-2 SC- 1
C1- F1
C2- F2 WF-1 WF-1 SC- 1

ELEV.

WF-2
WF-1

WF-1
WF-1

WF-1
WF-1

WF-1
100mm SLAB ON FILL
WF-1

WF-1

ELEV.
SPACE @ 0.40M.O.C
100mm SLAB ON FILL
WF-1

WF-2 ELEV.
SPACE @ 0.40M.O.C
ELEV.
SC-2 SC-2
SC- 1 SC- 1 C1- F1
WF-2 WF-1 WF-1 WF-1 WF-1 SC- 1 WF-1
C1- F1 C1- F1 C1- F1 C1- F1
C2- F2

N
A TIO
M PY
IN ENC FOR CO
E
FOR FER
RE

ABBREV.

C1 COLUMN- 1
F1 FOOTING- 1
WF-1 WALL FOOTING- 1
SF-1 SLAB FOOTING- 1

ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
CANOPY LINE
CANOPY LINE

N
A TIO
M PY
N F ORCE CO
R I REN
FO REFE

ABBREV.

ALMANA
CONSTRUCTION &
DEVELOPMENT CORPORATION
2"x 3" C- PURLINS GA. 24
SPACED AT 700mm.o.c

RF-3
S4 S8 SEE DETAIL (RF- 3)

PARAPET LINE

C O N C R E T E G U T T E R C O N C R E T E G U T T E R

RF-2
S4 S9 SEE DETAIL (RF- 2)

CANOPY LINE

TRUSS- 1
RAFTER- 1

RAFTER- 1

RAFTER- 1

RAFTER- 1

RAFTER- 1

RAFTER- 1
RAFTER- 2

RAFTER- 2

RAFTER- 2

RAFTER- 2

RAFTER- 2

RAFTER- 2

RAFTER- 2

RAFTER- 2

RAFTER- 2

RAFTER- 2
2 21" x 2 21" x 3mm ANGLE
TRUSS- 1
BAR RAFTER FRAMES
(See TRUSS- 1 Det.)

TRUSS- 1
CANOPY LINE

2 21" x 2 21" x 3mm ANGLE


BAR RAFTER FRAMES
(See TRUSS- 2 Det.)
TRUSS- 1

TRUSS- 1

PARAPET LINE

N
A TIO
M PY
N F ORCE CO
I EN
FOR EFER
R

ABBREV.

RB- 1 ROOF BEAM- 1


RB- 2 ROOF BEAM- 2

ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
Slope
Storm Storm Storm Storm Storm Storm
Drain Drain Drain Drain Drain Drain

CONCRETE GUTTER CONCRETE GUTTER

Slope

CANOPY LINE

Slope

Slope

Slope

Slope

Slope
Slope
PRE- PAINTED 4mm
PRE- PAINTED 4mm RIB- TYPE LONG SPAN
RIB- TYPE LONG SPAN ROOFING (SEE MRF's SPECS)
CANOPY LINE

ROOFING (SEE MRF's


SPECS)

Slope

100mm THK. CHB PARAPET 100mm THK. CHB PARAPET

TI ON
MA
N F ORCE COPY
R I REN
FO REFE

ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
SC-01
S6 S7 Vert. Bars

FFL

NGL

Gravel Bed

I
I
FFL

NGL

N
ATIO
M PY
N F ORCE CO
R I EN
FO REFER

ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
G.I PLAIN SHEET
S1-1
100mm THK CHB FLASHING GA. --
S8 S8
PRE- PAINTED LONG 100mm THK CHB
RAFTER STAINLESS STEEL
PRE- PAINTED LONG SPAN ROOFING
STORM DRAIN
SPAN ROOFING (See Detail)
SPACED @ 400mm. o.c
S2-2 2- 2 21" x 2 21" x 3mm ANGLE SPACED @ 400mm. o.c
S8 S8 BAR RAFTER FRAMES
PRE- PAINTED LONG
SPACED @ 400mm. o.c SPAN ROOFING

S2-1
S8 S8 SPACED @ 400mm. o.c

2- 2 21" x 2 21" x 3mm ANGLE


BAR RAFTER FRAMES

R o o f B e a m R o o f B e a m R o o f B e a m
STEEL BAR
S4-4
S8 S8 STEEL BAR
S5-5 @ 150mm.o.c
S8 S8
Roof Beam

S3-3 PIPE DOWN SPOUT


S8 S8

MEMBER (WELDED ON
2- 2 21" x 2 21" x 3mm ANGLE FRAMES)
BAR RAFTER FRAMES
(WELDED)

2- 2 21" x 2 21" x 3mm ANGLE


BAR RAFTER FRAMES
(WELDED)
2"x 3" C- PURLINS
MEMBER (WELDED ON GA. 16 (WELDED)
FRAMES)

BAR BRACING
(WELDED)

R o o f B e a m

10mm x 50mm
EXPANSION BOLT R o o f B e a m

2 21" x 2 21" x 3mm ANGLE


BAR RAFTER FRAMES
10mm x 50mm (WELDED) PLANTED/ EXTENDED
2- 2 21" x 2 21" x 3mm ANGLE
EXPANSION BOLT COLUMN 2"x 3" C- PURLINS
PLANTED/ EXTENDED BAR RAFTER FRAMES 10mm x 50mm
COLUMN GA. 16 (WELDED)
(WELDED) BARS EXPANSION BOLT
G.I SHEET FLASHING
GA. 0.4mm
SAG ROD 4" THK PARAPET
WALL
MEMBER (WELDED ON
SPACED @ 400mm. o.c
BAR BRACING FRAMES)
(WELDED)
2- 2 21" x 2 21" x 3mm ANGLE
ROOF
BAR RAFTER FRAMES
2 21" x 2 21" x 3mm ANGLE SEALANT
(WELDED)
BAR RAFTER FRAMES
(WELDED)
ROOF
10mm x 15mm
SEALANT
GROOVE

Roof Beam Roof Beam

4" THK PARAPET


WALL

Column Column

N
A TIO
M PY
IN RENC FOR CO E
OR
F EFE R

ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
S1-01
S7 S7

C O N C R E T E G U T T E R

CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL

RF-3
S7 S7

S2-02
S7 S7

RF-3
S4 S8

RF-3
S7 S7

Conc. Gutter

CORBEL
Roof Beam
227

N
A TIO
M PY
I N FONRCE CO
R RE
FO REFE
150

ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
-
- -

SD-02
S9 S9

Pc-1 Pc-1 Pc-1 Pc-1 Pc-1


500

4" THK. CHB PARAPET LINE

B1-01

TRUSS- 2
S9 S9

CANOPY LINE
TRUSS- 2

TRUSS- 2

TRUSS- 2

TRUSS- 2
CENTER GIRT- 1 CENTER GIRT- 1 CENTER GIRT- 1 CENTER GIRT- 1

CANOPY LINE
SD-01
S9 S9
B1-01 CANOPY LINE
S9 S9

S1-01
S7 S7

RF-2
SCED. 40 (7.11mm THK.) S4 S9

B1-01
S9 S9

500

O N
M ATI
N FORCE COPY
R I EN
FO REFER

2- 1 21" x 1 21" x 3mm ANGLE


BAR RAFTER FRAMES
(WELDED)

SD-02
MEMBER (WELDED ON
S9 S9
FRAMES)

SD-01
S9 S9

ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION

You might also like