At Intersection: Wall Base Reinforcing
At Intersection: Wall Base Reinforcing
H
SEE NOTES NO.5
A 1990 1530
(To Match Vert. Reinf.) 32 2590 700 480 260 810 2590 1990 1530 1530 4.833
B
CHB HOR. REINF. A 2560 1970
(See Sched. of Reinf.) 36 2990 790 650 360 1040 1900 1900 7.991
B 3330 2560
SUSPENDED SLAB
VERT. BARS MAIN REINFORCEMENTS
TO BE CONTINUOUS
25mm
T/3
T/3
@ 400 O.C. SLAB
SEE NOTE @ 300 0.C
NO.5
100/
40mm
150mm
CHB WALL W= 120 MAX.
(FOR W= 1200 PLUS-
CONSULT
STRUCTURAL ENGR.)
D/3
200 200
D/3
D
D/3
BAR
VERT. BAR
CHB VERT. REINF.
(See Sched. of Reinf.) CHB HOR. REINF. BEAM
400mm
FLOOR LINE
ELASTIC SEALANT
250mm
BAR
POLYURETHANE BEAM/ SLAB
BACKING
CHB WALL
R.C. COLUMN/
R.C. WALL
DRILLED DOWEL BARS W/
EPOXY TO MATCH VERT. REINF.
CHB VERT. REINF. TYP. CHB STIFFENER COLUMN IN PVC PIPE SLEEVE OR FELT
(See Sched. of Reinf.)
E DET. ON CHB WALLS PAPER
S2.02 NOT TO SCALE .
CHB HOR. REINF.
VERT. BAR (See Sched. of Reinf.) POLYURETHANE SEALANT W/
SEE NOTE BACKER ROD ON BOTH SIDES
NO. 5
CHB WALL
ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
WF-2
SLOPE ELEV.
C1- F1 (RAMP) C1- F1 C1- F1 C1- F1 C1- F1 C1- F1
WF-1 WF-1 WF-1 WF-1 WF-1 SC-1
WF-2
ELEV. ELEV. ELEV.
WF-2
WF-1
WF-1
WF-1
SC-1
SF-1
WF-1
WF-1
WF-1
WF-1
WF-1
WF-1
WF-2 ELEV.
WF-1
WF-1
WF-1 WF-2 WF-2 WF-2
SC-1 SC-1
WF-1
SC-1 100mm SLAB ON FILL
WF-1
WF-1 ELEV.
C3- F3 WF-2
WF-2
ELEV.
WF-2
WF-1
C2- F2 C1- F1 C1- F1 ELEV. SPACE @ 0.40M.O.C
SC-1
SC-1 WF-1
SC-1 C1- F1
SC-1
WF-1 WF-1 WF-2 WF-1
C1- F1 C1- F1
WF-1
WF-1
WF-1
WF-1
ELEV.
ELEV.
WF-2
WF-1
WF-1
WF-1
WF-1
WF-1
WF-1
100mm SLAB ON FILL
WF-1
WF-1
ELEV.
SPACE @ 0.40M.O.C
100mm SLAB ON FILL
WF-1
WF-2 ELEV.
SPACE @ 0.40M.O.C
ELEV.
SC-2 SC-2
SC- 1 SC- 1 C1- F1
WF-2 WF-1 WF-1 WF-1 WF-1 SC- 1 WF-1
C1- F1 C1- F1 C1- F1 C1- F1
C2- F2
N
A TIO
M PY
IN ENC FOR CO
E
FOR FER
RE
ABBREV.
C1 COLUMN- 1
F1 FOOTING- 1
WF-1 WALL FOOTING- 1
SF-1 SLAB FOOTING- 1
ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
CANOPY LINE
CANOPY LINE
N
A TIO
M PY
N F ORCE CO
R I REN
FO REFE
ABBREV.
ALMANA
CONSTRUCTION &
DEVELOPMENT CORPORATION
2"x 3" C- PURLINS GA. 24
SPACED AT 700mm.o.c
RF-3
S4 S8 SEE DETAIL (RF- 3)
PARAPET LINE
C O N C R E T E G U T T E R C O N C R E T E G U T T E R
RF-2
S4 S9 SEE DETAIL (RF- 2)
CANOPY LINE
TRUSS- 1
RAFTER- 1
RAFTER- 1
RAFTER- 1
RAFTER- 1
RAFTER- 1
RAFTER- 1
RAFTER- 2
RAFTER- 2
RAFTER- 2
RAFTER- 2
RAFTER- 2
RAFTER- 2
RAFTER- 2
RAFTER- 2
RAFTER- 2
RAFTER- 2
2 21" x 2 21" x 3mm ANGLE
TRUSS- 1
BAR RAFTER FRAMES
(See TRUSS- 1 Det.)
TRUSS- 1
CANOPY LINE
TRUSS- 1
PARAPET LINE
N
A TIO
M PY
N F ORCE CO
I EN
FOR EFER
R
ABBREV.
ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
Slope
Storm Storm Storm Storm Storm Storm
Drain Drain Drain Drain Drain Drain
Slope
CANOPY LINE
Slope
Slope
Slope
Slope
Slope
Slope
PRE- PAINTED 4mm
PRE- PAINTED 4mm RIB- TYPE LONG SPAN
RIB- TYPE LONG SPAN ROOFING (SEE MRF's SPECS)
CANOPY LINE
Slope
TI ON
MA
N F ORCE COPY
R I REN
FO REFE
ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
SC-01
S6 S7 Vert. Bars
FFL
NGL
Gravel Bed
I
I
FFL
NGL
N
ATIO
M PY
N F ORCE CO
R I EN
FO REFER
ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
G.I PLAIN SHEET
S1-1
100mm THK CHB FLASHING GA. --
S8 S8
PRE- PAINTED LONG 100mm THK CHB
RAFTER STAINLESS STEEL
PRE- PAINTED LONG SPAN ROOFING
STORM DRAIN
SPAN ROOFING (See Detail)
SPACED @ 400mm. o.c
S2-2 2- 2 21" x 2 21" x 3mm ANGLE SPACED @ 400mm. o.c
S8 S8 BAR RAFTER FRAMES
PRE- PAINTED LONG
SPACED @ 400mm. o.c SPAN ROOFING
S2-1
S8 S8 SPACED @ 400mm. o.c
R o o f B e a m R o o f B e a m R o o f B e a m
STEEL BAR
S4-4
S8 S8 STEEL BAR
S5-5 @ 150mm.o.c
S8 S8
Roof Beam
MEMBER (WELDED ON
2- 2 21" x 2 21" x 3mm ANGLE FRAMES)
BAR RAFTER FRAMES
(WELDED)
BAR BRACING
(WELDED)
R o o f B e a m
10mm x 50mm
EXPANSION BOLT R o o f B e a m
Column Column
N
A TIO
M PY
IN RENC FOR CO E
OR
F EFE R
ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
S1-01
S7 S7
C O N C R E T E G U T T E R
CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL CORBEL
RF-3
S7 S7
S2-02
S7 S7
RF-3
S4 S8
RF-3
S7 S7
Conc. Gutter
CORBEL
Roof Beam
227
N
A TIO
M PY
I N FONRCE CO
R RE
FO REFE
150
ALMANA
CONSTRUCTION AND
DEV'T. CORPORATION
-
- -
SD-02
S9 S9
B1-01
TRUSS- 2
S9 S9
CANOPY LINE
TRUSS- 2
TRUSS- 2
TRUSS- 2
TRUSS- 2
CENTER GIRT- 1 CENTER GIRT- 1 CENTER GIRT- 1 CENTER GIRT- 1
CANOPY LINE
SD-01
S9 S9
B1-01 CANOPY LINE
S9 S9
S1-01
S7 S7
RF-2
SCED. 40 (7.11mm THK.) S4 S9
B1-01
S9 S9
500
O N
M ATI
N FORCE COPY
R I EN
FO REFER
SD-02
MEMBER (WELDED ON
S9 S9
FRAMES)
SD-01
S9 S9
ALMANA