LP Implementation Plan Jan2013
LP Implementation Plan Jan2013
LP Implementation Plan Jan2013
I M P LE M E NTATION P LAN 1
JAN UARY 2013
COPYRIGHT
Greater London Authority
January 2013
Published by
Greater London Authority
City Hall
The Queen’s Walk
More London
London SE1 2AA
www.london.gov.uk
enquiries 020 7983 4100
minicom 020 7983 4458
Page 2 of 112
LONDON PLAN IMPLEMENTATION PLAN
LONDON PLAN
IMPLEMENTATION PLAN 1
January 2013
CONTENTS
1 INTRODUCTION 4
TRANSPORT 19
WATER 23
ENERGY 35
TELECOMMUNICATIONS 43
WASTE 46
SOCIAL INFRASTRUCTURE 50
GREEN INFRASTRUCTURE 63
4 FUNDING OPPORTUNITIES 69
Page 3 of 112
CHAPTER 1
I NT R O D U CT I O N
LONDON PLAN IMPLEMENTATION PLAN
Page 5 of 112
LONDON PLAN IMPLEMENTATION PLAN
currently remains high level and has a economic circumstances and potential
number of gaps. Work will continue on a spending constraints in the public sector
range of aspects, particularly on filling are also taken into account.
data gaps through further research and/or
in cooperation with relevant delivery 1.9 The second core section (chapter 3)
agencies and as further details about addresses the strategic infrastructure
availability of resources are known. Over required to support the growth set out in
time the document will be refined and the London Plan (and particularly housing
more detail will be added. The growth) over the period to 2036.
Implementation Plan will complement the Infrastructure that is of significance
implementation and infrastructure across borough boundaries, in terms of
planning required to support Opportunity transport, utilities (water, energy, waste),
Area Planning Frameworks (OAPFs) and telecommunications, social and green
Local Plans, addressing the broad infrastructure is explored – initially on a
implementation dimension appropriate to broad London-wide basis. As far as
the level of detail of the London Plan. possible this process includes identifying
the potential infrastructure need based on
Structure and methodology transparent assumptions about future
resource demand and other aspects. The
1.7 The Implementation Plan aims to be user- provision of infrastructure to meet this
friendly, concise, transparent and easy to need, cost and potential funding
update. It is organised around two core
opportunities of strategic infrastructure
sections:
are also addressed. Funding
opportunities that apply across different
1.8 At the centre of the first (chapter 2 plus
types of infrastructure are the focus of
Annex 1) is a range of strategic chapter 4. However, it should be noted
implementation actions for the GLA that in many cases budgets, funding
Group, partner organisations and delivery
mechanisms and priorities in the public
agencies covering all policy areas. This is
sector are extremely uncertain. Therefore,
based around a comprehensive
the information provided is kept very brief
investigation into the implementation and high-level.
dimension of all policies of the Plan. The
implementation actions support and
facilitate the implementation of the Implementation Group
London Plan policies. They include
1.10 An Early Working Draft of this
significant investment initiatives and
Implementation Plan was produced in
strategies, as well as important
September 2010 to illustrate the Mayor’s
partnerships and research work. Specific
approach to implementation planning for
guidance and support for boroughs in
the London Plan Examination in Public
realising the London Plan through their
(EIP). Whilst the Implementation Plan
Local Plans is also included. For each
itself was not subject to scrutiny, many
implementation action, information about
EIP participants welcomed the Mayor’s
responsible delivery bodies, a timescale
approach and offered support for its
for delivery and a degree of certainty is
further development.
provided. No attempt is made to prioritise
individual actions over others. Rather an
1.11 An Implementation Group has been
indication is given about the firmness of
established to support the preparation
commitment expressed by key deliverers
and over time the review of the
to each action and to the dependencies in
Implementation Plan. The Implementation
terms of resources, local commitment,
Group aims to:
individual circumstances, Government
decision/guidance, technical expertise or
a) assist in providing the Mayor with
better partnership working. Potential
data or potential sources of data
barriers that have to be overcome in each
required for the development and
case are being identified. Current
updating of the Implementation Plan;
Page 6 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 7 of 112
CHAPTER 2
I M P LE M E N TAT I O N
ACT I O N S F O R
TH E LO N D O N
P LA N P O LI C I E S
LONDON PLAN IMPLEMENTATION PLAN
3
Section 24, Planning and Compulsory Purchase Act
2
GLA Act 1999, Section 334, Planning and Compulsory 2004
4
Purchase Act 2004, Section 37(6) Section 334(4), Greater London Authority Act 1999
Page 9 of 112
LONDON PLAN IMPLEMENTATION PLAN
5 6
Replaced the Housing and Communities Agency in Section 41 (4) and (5), Greater London Authority Act
London 1999
Page 10 of 112
LONDON PLAN IMPLEMENTATION PLAN
Mayor. These are included in Annex 1. population growth recorded by early data
They provide detail to help boroughs in from the 2011 census in mind.
reflecting the Plan’s policies through
their local plans. The following list Area-specific action plans and
provides an overview of the programme designations
of SPG production at the time of writing.
2.14 Mechanisms to promote development,
The indicative programme of planned improvements and regeneration in
SPGs and similar publications during specific areas of London include (not
2013 include (not exhaustive): exhaustive):
2.12 The SPGs often refer to case studies and Assessments and research
good practice. The Mayor’s London
Planning Awards also showcase and 2.17 The implementation of the Plan’s policies
promote annually such good practice. requires robust evidence. Assessments
and research studies are often
2.13 The Mayor keeps the London Plan under undertaken or supported by the GLA
continued revision to ensure it is as up-to- Group, boroughs, consultancies and
date as possible. He is currently research institutes. These can underpin
promoting Revised Early Minor the case for developers, boroughs and
Alterations to the Plan to take account of others to act in accordance with the
the National Planning Policy Framework, policies. That will often also inform the
changes to national policy on affordable evidence base of the boroughs’ local
housing and other developments. During plans in terms of infrastructure provision.
2013 he will start work on Further Annex 1 includes significant assessments
Alterations to roll the Plan forward to and pieces of research. The Mayor will be
2036, particularly with the strong discussing ways of working with boroughs
Page 11 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 12 of 112
CHAPTER 3
P R OV I S I O N
OF S T R AT E G I C
I N F R A S T R U CT U R E
LONDON PLAN IMPLEMENTATION PLAN
3.1 Paragraph 8.20 of the London Plan a) Identify strategic infrastructure within
states that the Implementation Plan ‘also the following types of infrastructure:
addresses more specifically the strategic Transport
infrastructure that is required to support Water
the growth set out in the Plan.’ This Energy
chapter in particular is also supported by Telecommunications
the National Planning Policy Framework Waste
(NPPF), which indicates that Local Social Infrastructure
Planning authorities ‘should work with Green Infrastructure
other authorities and providers to assess
the quality and capacity of transport, b) Identify for strategic infrastructure the
water supply, wastewater and its need to meet existing backlog and
treatment, energy (including heat), proposed growth by
telecommunications, utilities, health, using data/research from GLA
social care, education flood risk and Group as well as from regulators,
coastal change management, and its infrastructure providers, sub-
ability to meet forecast demand regions and boroughs
(paragraph 162). Green infrastructure, making transparent and realistic
which is also covered in this chapter, is assumptions about future
referred to separately in the NPPF and in efficiency savings, changes in
recognition of its climate change standards and behaviour
adaptation and its natural environment
role (see paragraphs 99 and 114 of the c) Identify infrastructure provision
NPPF). needed by 2031
liaising with infrastructure
3.2 This chapter aims to provide more detail providers and sub-
on the strategic infrastructure required to regional/borough representatives
support the growth of London envisaged prioritising and phasing them
in the London Plan (particularly housing).
Initially the focus is on a London-wide d) Identify infrastructure funding and
overview of infrastructure requirements. delivery for cost estimates (see
However, further work will be undertaken chapter 4 if non-specific) by
to look in more detail at Opportunity
liaising with infrastructure
Areas, Areas of Intensification and other providers, sub-regional and
strategic areas in more detail. Strategic borough representatives
infrastructure is defined as infrastructure
providing any costs available, e.g.
that is relevant across large parts of
unit costs, but highlight
London, provided on a network basis, or
assumptions
at least across boundaries, and is of a
acknowledging uncertainties, risks
certain investment scale or where there
and barriers
is a known funding gap. This chapter
also has also the potential to support the
3.4 It has to be highlighted that the baseline
boroughs’ application of the Duty to
information for each type of
Cooperate introduced through the
infrastructure in line with the approach
Localism Act 2004.
set out above is still under development
and will improve over time with
Page 14 of 112
LONDON PLAN IMPLEMENTATION PLAN
8
London First, the Infrastructure Commission, World
class infrastructure for a world city, November 2010.
7 9
As part of the Mayoral CIL - Draft Charging Schedule, Mayor of London, the Mayor’s Transport Strategy,
August 2011 May 2010.
Page 15 of 112
LONDON PLAN IMPLEMENTATION PLAN
10
The London First report contains a useful table
setting out the different ownerships and market
features/funding sources for different kinds of
infrastructure.
Page 16 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.10 The National Infrastructure Plan 2012 counted and funding sources are often
includes an infrastructure pipeline with not clearly identified. It will be necessary
over 550 projects/programmes worth to revisit borough data in the near future,
over £330 billion to 2015 and beyond. and the Mayor intends to work with
This is a UK wide figure and no regional boroughs and other stakeholders to find
breakdown is given, though there are ways to improve the presentation and
regional examples of infrastructure use of this information.
improvements. (Taking London as 15%
of the UK would give almost £50 billion). 3.13 All this said, these estimates are a
London First quotes a report by the think valuable basis for a “bottom-up”
tank Policy Exchange of £500 billion assessment of need to complement the
over the next decade for the UK as a “top-down” ones referred to earlier. For
whole, but do not provide a London this purpose, a number of assumptions
estimate. (Taking 15 per cent again, it have been made:
would be £75 billion). No breakdown or
prioritisation of investment need is made The costs of transport schemes to be
by category of infrastructure in either funded predominantly by national
report. government, Transport for London or
Network Rail have been excluded.
3.11 The Mayor’s Transport Strategy These are included in the estimates
addresses costs and funding for given earlier, and more information
London’s transport system, including the about them will be given about these
national railway as well as the modes for later.
which the Mayor is responsible. It Borough figures for education, health
quotes a figure of £4.8 billion a year for and leisure have been used as given,
the next five years and continuing although they often include
investment of £3.5 billion to £4.5 billion a assumptions about Government
year in the period up to 2031. funding which may no longer be valid
(because of the review of the Better
3.12 A further source of information about Schools for the Future programme,
London’s infrastructure needs is the core for example)
strategies and infrastructure delivery Assumptions have been made about
plans drawn up by London borough funding of particular infrastructure
councils as part of their local (the Thames Tideway Tunnel being a
development frameworks. There are good example), which should be
limitations in using this information – not discounted.
all boroughs have assessed and
published their infrastructure On this basis, information from 24
requirements; those documents that boroughs has been used (over 70 per
have been produced have appeared at cent of the total).
different times and with different
assumptions about sources of potential 3.14 If this information is used to provide an
funding (before and after the results of average of borough estimates of need,
the 2010 Comprehensive Spending and this average is then used to provide
Review, for example). They look over a 33-borough estimate. This is shown in
different time periods, and often deal Table 2:
with widely differing types of
infrastructure (some focus on that for
which boroughs themselves have
responsibility, while others include that
provided by the Mayor and/or national
government). Infrastructure serving more
than one borough is sometimes double-
Page 17 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 18 of 112
LONDON PLAN IMPLEMENTATION PLAN
11
Government’s statement of the outputs it requires
from the National Rail network for the next five year
control period.
12 14
London Underground (LU), London Overground ibid, figure 20 (p 73) and figure 22 (p 75)
15
(LO), other National Rail (NR), DLR and Tramlink ibid, figure 32 (p121)
13 16
Mayor of London, The Mayor’s Transport Strategy, ibid, figure 26 (p85)
2010, figure 2 (page 36)
Page 19 of 112
LONDON PLAN IMPLEMENTATION PLAN
Source: MTS
Source: MTS
Page 20 of 112
LONDON PLAN IMPLEMENTATION PLAN
Source: MTS
Page 21 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 22 of 112
LONDON PLAN IMPLEMENTATION PLAN
21
Environment Agency, Water for people and the
environment - water resources strategy for England and
Wales, 2009: http://publications.environment-
agency.gov.uk/PDF/GEHO0309BPKX-E-E.pdf. Note:
an update to the water stress methodology was under
consultation at the time of writing.
Page 23 of 112
LONDON PLAN IMPLEMENTATION PLAN
population density combined with limited around 270 mega litres a day by 2031 23.
resources means that we need to This compares to an anticipated demand
carefully manage and plan the water of around 2500 mega litres a day before
resources in London. Water demand in any demand and leakage savings that
London is higher than the average for companies are able to make. The
England and Wales. During 2011/12 anticipated deficit figure includes definite
each Londoner used on average of 164 and likely sustainability reductions, but
litres of water a day compared to the reductions that are yet unknown are not
average of 145 litres per person per day included and could substantially add to
for England and Wales. this figure..
3.40 Due to climate change and requirements 3.42 Figure 4 shows the supply-demand
from legislation such as the Water balance in 2012 based on the current
Framework Directive there is currently WRMPs (2010-2035). Currently there is
some uncertainty over the amount of a small deficit in Sutton and East
water that will be available to supply Surrey’s East Surrey Water Resource
London in the future. Where water Zone (WRZ) and a larger deficit in the
abstraction may be causing Essex WRZ of Essex and Suffolk Water.
environmental damage it may be This means that customers face a
necessary to reduce or revoke a water greater chance of water restrictions in a
abstraction licence to protect the dry year.
environment. These cases are known as
sustainability reductions. Where
investigations have shown sustainability
reductions to be likely, the Environment
Agency has informed the water
companies and these reductions have
been included in the draft Water
Resources Management Plans
(WRMPs) for the period 2015-2040
which are under development.
23
Calculated from indicative Statements of Need
published on water company websites in advance of
consultation on new draft Water Resource Management
Plans (WRMPs) in early 2013.
Page 24 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 25 of 112
LONDON PLAN IMPLEMENTATION PLAN
23
The AMP5 leakage reduction and metering programmes listed above are currently proceeding at a reduced rate as
they have not to date received funding from OFWAT.
Page 26 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.47 Essex and Suffolk Water’s Essex WRZ completion in 2013 (the additional
supplies water to north east London resources provided will result in a
including Dagenham, this zone is surplus to 2026 and beyond, as shown in
currently in deficit. The company is Figure 5). An overview of the preferred
currently addressing this through the programme is provided as Table 4.
Abberton scheme, which is due for
Table 4: Essex and Suffolk Water’s preferred programme for London (2010 to 2035)
Programme Short term (2010- Medium term (2015- Long term (2020-
2015) 2020) 2035)
Essex and Suffolk Water (Essex WRZ)
Leakage 200km of mains 200km of mains
reduction replacement. replacement
Replacement of Replacement of 2,000
2,000 common common supply pipes
supply pipes in in Dagenham
Dagenham
Pressure Pressure
management management
Active leakage Active leakage control
control
Metering Change of occupier Compulsory metering
metering to achieve to achieve 81% meter
60% meter penetration for 2020
penetration and 89% for 2025)
Water Enhanced water Enhanced water Enhanced water
efficiency efficiency efficiency programme efficiency
programme programme.
Resource Abberton Scheme, None needed Possible need for
development increases water new water resource.
available by 64Ml/d.
Source: Essex and Suffolk Water, Final WRMP
3.48 Figure 5 below shows the supply- companies plan to manage supply and
demand balance in 2026, which takes demand highlighted above.
into account population growth
projections and the options water
Page 27 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 28 of 112
LONDON PLAN IMPLEMENTATION PLAN
25
http://www.thameswater.co.uk/cps/rde/xbcr/corp/londo
n-tideway-improvements-the-case-for-the-thames-
tunnel.pdf
26
Environment Agency, State of the Environment for
London Report, June 2011:
http://data.london.gov.uk/documents/SOE-2011-
report.pdf
27
http://files.thamestunnelconsultation.co.uk/files/thame
stunnel/1-100-RG-PNC-00000-
900007%20Needs%20Report.pdf
28
http://www.thamestunnelconsultation.co.uk/consultatio
n-documents.aspx
Page 29 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 30 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.54 As part of its Business Plan for 2010- sewage treatment works and to
2015 (AMP5) Thames Water is construct the Lee Tunnel. The cost of
developing and implementing a the Thames Tideway Tunnel is
proposal for a major upgrade of currently expected to be £4.1 billion, but
Deephams STW to provide sufficient the precise figure depends on a number
capacity to accommodate growth up of external factors. The upgrade to
to 2026. This project will not be Deephams STW is expected to cost
completed until the 2015-2020 period several hundred million pounds. There
(AMP6). The Deephams STW upgrade may also need to be additional
as well as the Thames Tideway Tunnel investment in local sewers and sewage
are specifically referred to in the treatment works to accommodate
National Planning Statement on Waste growth up to 2031. The Environment
Water, which was published in March Agency’s London Environmental
2012. Infrastructure Needs: A Strategic Study’
(LEINS) report estimated that an
3.55 To support the proposed housing additional £335 million may need to be
growth in London beyond 2021, invested in London’s sewage treatment
Thames Water may have to increase its works over this period to prevent
overall sewage treatment capacity to deterioration in water status and that
cope with an increased population of further investment will be needed to
around 740,000 by 2031 29. Some of improve London’s water quality.
London’s smaller treatment works,
away from the Thames Tideway, may 3.57 In reality, the cost of managing water
require some extra capacity before quality is expected to be even higher,
2021. Future provision after 2021 will as there are other costs that are not
be identified and planned for by included in the above figures. The
Thames Water through their future additional costs may include future
business plans. investment driven by measures in the
Thames River Basin Management Plan,
c) Wastewater infrastructure sewer network improvements, sewer
funding and delivery flood alleviation schemes, sewage
treatment work expansions to cope with
3.56 The funding for investment in greater effluent volume and
wastewater infrastructure is raised improvements to sewage sludge
through charges to water company disposal.
customers. Thames Water will seek
approval from the Water Services
Regulation Authority (OFWAT) to invest
in strategic growth schemes through FLOOD RISK MANAGEMENT
the five-yearly periodic review of water INFRASTRUCTURE
company prices 30. The next periodic
review will be in 2014. Under recent a) Strategic flood risk
changes to the periodic review process, management infrastructure
water companies have established new
3.58 London is at risk from flooding from a
Customer Challenge Groups (CCG),
number of sources including tidal,
which are consulted on business plan
fluvial, groundwater, surface water and
options. In the period 2010-2015,
sewer flooding. The Environment
Thames Water expects to invest some
Agency has a strategic overview role
£1.3 billion to upgrade five of London’s
for all forms of flooding, and an
operational role to manage flood risk
from rivers and the sea 31. Lead Local
29
Environment Agency, London Environmental
Infrastructure Needs: A Strategic Study (LEINS), 2010. Flood Authorities lead on the local
30
Thames Water’s Investment programme from 2010-
2015
31
http://www.thameswater.co.uk/cps/rde/xbcr/corp/our- Flood and Water Management Act 2010
plans-for-2010-2015.pdf http://www.legislation.gov.uk/ukpga/2010/29/contents
Page 31 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 32 of 112
LONDON PLAN IMPLEMENTATION PLAN
Figure 7: The occurrence of Flood Zones across Greater London (areas benefiting
from flood defences are also shown)
Page 33 of 112
LONDON PLAN IMPLEMENTATION PLAN
36
http://environment-
agency.gov.uk/research/library/consultations/106100.as
px
37
Environment Agency’s Programme for Flood and http://www.environment-
Coastal Risk Management Schemes (South East) agency.gov.uk/research/planning/118129.aspx
Page 34 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 35 of 112
LONDON PLAN IMPLEMENTATION PLAN
Source: GLA
Page 36 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.79 However, electricity demand is – after a the above factors, particularly during
temporary decrease during the economic periods of severely cold weather 44.
downturn - forecast to return to a long-
run average increase of 1 to 4 % per 3.81 National Grid and Southern Gas also
year 43 in the medium term, and with facilitate the increasing entry of
sustained levels of population and renewable gas into the grid. Renewable
business growth the spare electricity gas is expected to become more
capacity in London’s 11 kV network is important in the future and is a way of
significantly diminishing. In particular in de-carbonising the gas grid. The
Central London and in Opportunity Areas Government is introducing a Renewable
such as Vauxhall, Nine Elms, Battersea Heat Incentive that is intended to assist
(VNEB), developers and businesses are in the development of the renewable gas
concerned about electricity infrastructure industry. As a result of the predicted
provision, and some development is at stabilisation in peak day demand no
least held up by negotiations to agree major ‘general’ reinforcement works are
necessary reinforcements to the currently expected within the LDZ.
distribution network. In the City, there However, local reinforcement may be
has also been a significant increase in required as part of future mains
demand for capacities exceeding 5 MW replacement strategies and to provide
to meet a particularly high IT use, and gas to new developments such as
UK Power Networks are constructing a Opportunity Areas, for example to serve
new 33 kV distribution network to meet their energy centres and associated gas-
these demands. It is expected that fired CHPs.
through engagement with National Grid,
UKPN and SSEPD a comprehensive 3.82 Much of National Grids North London’s
and spatial overview of areas with old metallic gas mains have now been
potential future capacity shortfalls (if no replaced, with over 60% of all mains in
new substations are provided) is the city now polyethylene. Although the
included in the next version of this current replacement programme is
document. currently under review with the HSE,
replacement of the old metallic mains will
3.80 Gas is currently the most significant continue, In Outer London the focus will
source of energy in the UK; excluding be on replacing significant lengths of
the transport sector it provides the smaller low pressure pipes however the
majority of the energy used in London, city centre has a high proportion of very
directly or by fuelling electricity large diameter old Victorian medium
generators. National Grid’s 2011 gas pressure mains and any future
consumption forecast indicates that total replacement of these will require careful
annual gas demand will decrease by 7.6 planning and close engagement with
% by 2020, with gas usage in North other service providers and stakeholders
London expected to drop from 57 TWh in to ensure opportunities and synergies
2011 to 53 TWh by 2020. A number of are fully explored.
factors are contributing to this decline
including the anticipated state of the 3.83 There are around a dozen active low-
economy, affordability and increased pressure gasholder sites in London. It is
utilisation efficiency and new likely that all of these will be
technologies such as Smart Metering. decommissioned during this decade
Peak day demand is expected to remain resulting in brownfield land being
relatively stable or experience a modest released for development. The Mayor is
reduction, as this is less influenced by considering the preparation of planning
guidance for hazardous installations in
2013 that will also cover gas holders.
43
Increase in electrical appliances in
households/businesses, also potential increasing need
44
for cooling in summer due to climate change National Grid, UK Future Energy Scenarios, 2011
Page 37 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.84 An additional national challenge from the design of National Grid’s substations
Transmission and Distribution depends on the location and specific
Companies’ perspective will be the less requirements but a gas insulated
predictable and less controllable nature substation can typically occupy an area
of some of the renewable sources of up to 250m x100m with a height of
across the UK such as large-scale wind below 15 m.
power45 and how the network can
accommodate such additional 3.87 UK Power Networks plans to invest in
generation. However, these issues have electricity distribution infrastructure in
to be addressed to facilitate the London spending approx. £600m in the
implementation of the Mayor’s five year regulatory period to March
decentralised energy target. 2015. This investment involves
establishing a number of new main
3.85 Whilst different from infrastructure needs substations where electricity is
addressed above, the infrastructure transformed from 132 kV to 11 kV, and
opportunities of decentralised energy this, in turn requires the installation of
provision in particular through medium new 132 kV cables. Such substations,
and large-scale heat networks fed which typically require a footprint in
initially by CHP generation and sources excess of 1000m2 and a minimum
of waste heat should be highlighted. The headroom of 10m, require a construction
largest renewables opportunity within period of about two years although this
London is in the wide-scale deployment may increase for a complex site. UKPN
of small ad medium-scale renewable is also developing a new 33 kV network
heat and power technologies, particular to supply new loads greater than 5MVA
photovoltaics. It is projected that in the vicinity of the City. It is often not
renewables could supply more than possible to install 132 kV cables using
10,000 GWh of energy or 12 % of “open cut” techniques, and hence UKPN
London’s total energy supply and is currently constructing a deep tunnel
decentralised energy as a whole in from New Cross to The City. This forms
excess of 25% of London’s energy part of an overall reinforcement strategy
needs. However, there are a range of and will increase both capacity and
barriers to the realisation of the resilience in The City. UKPN has
decentralised energy opportunities recently completed a major project to
including barriers to investment in heat install six new transformers and
and electricity infrastructure and the associated switchgear at Bankside
regulatory framework. 46 substation, and is currently constructing
new 132 kV/11 kV substations at Osborn
c) Energy infrastructure provision Street and Limeburner Lane, as well as
uprating Moreton Street substation in
3.86 National Grid’s London Cable Tunnels
Pimlico to 132 kV. It is expected that
programme worth approximately £ 1 bn
further details about infrastructure
is underway. Its Phase 1 (completion by investments plans covering the next
2015) will provide a new tunnel route Business Plan period 2015 to 2023 will
from Willesden to Hackney and from
be included in the next version of this
Wimbledon to Kensal Green. At the latter
document, which will also include details
and at Finsbury Park new substations
relating to the Scottish and Southern
will be built subsequently for the
Energy Power Distribution network in
purposes, respectively, of providing west London.
traction supplies to the Crossrail project
and to support current and forecasted
3.88 In respect of gas, the following maps
demand in Central London. The size and
(Figures 9 and 10) show National Grid’s
45
and Southern Gas’ main Local
National Grid Transmission, RIIO-T1 Business Plan, Distribution System (brown/green) and
July 2011
46
Mayor of London, Delivering London’s Energy Future,
the offtakes from the National
October 2011, p. 82-84 Transmission Systems.
Page 38 of 112
LONDON PLAN IMPLEMENTATION PLAN
Figure 10: Southern Gas’ South East Local Distribution Zone (extract)
Page 39 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.89 It is expected that the information about the Mayor’s target is in the order of £ 5 –
specific significant investment schemes £ 7 billion over the next 15 years. 48
included in National Grid’s and Southern
Gas’ Business Plans that have been d) Energy infrastructure funding
submitted to the regulator Ofgem will be and delivery
included in the next version of this
document 47. 3.92 Funding for investment in the electricity
and gas infrastructure is raised through
3.90 To achieve the Mayor’s decentralised transportation and new connection
energy target the development of charges, which are paid to the network
decentralised heating and cooling operators for transmission through the
networks as well as large-scale heat and networks. The price that the companies
electricity transmission networks is can charge is regulated by Ofgem. They
essential. The London Heat Map helps set the maximum amount of revenue
to identify key locations for decentralised which the operators can take through
energy opportunities. A number of charges they levy on users of their
potential heat networks have been networks to cover their costs and earn
identified and mapped out, together with them a return in line with agreed
their potential heat sources and sources expectations. Ofgem’s upcoming price
of heat demand and these include in control reviews reflect the a new
particular the Opportunity Areas. A regulatory framework (the so-called RIIO
number of CHP plants have already model 49) which is intended to put more
been identified and policy drivers emphasis on incentives to drive the
promote them, in particular for major innovation needed to deliver a
developments. These are the following sustainable energy network at value for
CHP-led district energy schemes: money to existing and future consumers.
Olympic Park and Stratford City, Citigen, It also highlights greater opportunities to
the Pimlico District Heating Undertaking influence Ofgem and network company
(PDHU), Barkantine Heat and Power, decision-making. 50
Whitehall District Heating Scheme, the
Bunhill Energy Centre, King’s Cross 3.93 National Grid has submitted revised draft
Central and the University College Electricity and Gas Transmission RIIO-
London and Bloomsbury CHP. T1 Business Plans for 2013 – 2021 to
Ofgem in spring 2012. Demand
3.91 The Mayor’s Decentralised Energy forecasts from the DNOs have been
Programme Delivery Unit (DEPDU) taken into account. For electricity the
provides services to help others develop plan set out National Grid’s strategy for
and bring to market their decentralised infrastructure modernisation and new
energy schemes. The Mayor contributes connections and includes expenditure of
to the delivery of exemplar decentralised £ 21.9 bn (nominal) between 2013 and
energy projects such as the London 2021. Over the £14bn capital
Thames Gateway Heat Network or the expenditure programme roughly 60 %
Upper Lee Valley Energy Network, which will be spent on new connections and 40
are geared towards unlocking barriers to % on replacing existing assets largely
investment by the private sector. The built in the 1950s/1960s (above figures
cost of infrastructure for such large-scale are national). For gas there will be the
projects tends to exceed £ 100 million. need to connect new and expanding
The total investment required to achieve
48
Mayor of London, Delivering London’s Energy
Future, October 2011, p. 99
47 49
National Grid, Gas Distribution Business Plan Revenue = Incentives + Innovation + Output
50
submission for 2013 – 2021, Nov 2011, can be view at: Ofgem, RIIO: A new way to regulate energy
http://www.talkingnetworksngd.com/ networks, October 2010
Page 40 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 41 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 42 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 43 of 112
LONDON PLAN IMPLEMENTATION PLAN
Source: BT
Page 44 of 112
LONDON PLAN IMPLEMENTATION PLAN
Source: BT
Page 45 of 112
LONDON PLAN IMPLEMENTATION PLAN
63
http://www.london.gov.uk/publication/londons-
wasted-resource-mayors-municipal-waste-
management-strategy
64
http://www.lwarb.gov.uk/
Page 46 of 112
LONDON PLAN IMPLEMENTATION PLAN
65
The Mayor’s Business Waste Strategy for London,
November 2011, page 24
66
Ibid, Figure 2, page 25
Page 47 of 112
LONDON PLAN IMPLEMENTATION PLAN
100%
6% Other
3% Landfill
90% 18%
24% Incineration
25% Recycling
80% 36%
70%
17%
8%
60%
6%
50%
31%
40% 82%
30% 61%
53%
20%
30%
10%
0%
Total CDE C&I LACW
3.123 The Mayor’s key London Plan policy through a spatial redistribution process
objectives for waste, as set out in Policy known as waste apportionment.
5.16 Waste Self-Sufficiency, are to:
3.124 London Plan Table 5.3 shows the
minimise waste tonnages of apportioned LACW and C/I
increase reuse, recycling and waste boroughs are expected to manage
composting, and to through the plan period. The amounts
maximise London’s waste self- rise over time – not because waste
sufficiency – i.e. to reduce waste generated is expected to increase
exported to landfill outside London, dramatically, but because an increasing
by managing over the plan period (to proportion of waste will be managed
2031) as much of London’s waste within London as waste exports to
within London as is practicable. neighbouring regions decline and the
capital nears waste self-sufficiency.
To make sure this happens, Policy 5.17
Waste Capacity requires boroughs to c) Waste infrastructure provision
allocate land for waste to provide
enough capacity to deal with the 3.125 In order to achieve the Mayor’s objective
amounts of waste allocated to them of waste self-sufficiency, London will
Page 48 of 112
LONDON PLAN IMPLEMENTATION PLAN
need to develop infrastructure capacity 3.130 This level of investment will be met
to manage at least an additional 8.5 mt primarily through commercial funds It is
of MSW and C/I waste within its evident through LWARB’s project
boundaries by 2031. portfolio that the waste industry is keen
to help fill London’s waste management
3. 126 To develop this infrastructure, LWARB’s capacity gap, but significant additional
funds alone will not be sufficient. Given investment is necessary from banks and
the extent of the capacity gap and the other financial institutions to fill the
capital cost associated with waste market. Whilst the UK Green Investment
management infrastructure Bank is very active in the PFI/PPP
development, LWARB’s fund is only space, LWARB’s financial involvement in
capable of supporting partial fulfilment of merchant projects has been
the ‘gap’ requirements. LWARB demonstrated to help leverage private
therefore takes a targeted approach to funding to the extent that such projects
the use of its funding to make sure the become viable. It is essential that
identified capacity gaps are narrowed as LWARB continues to receive funding
much as possible, supporting scale from the government beyond 2015 to
projects and thereby reducing the overall develop projects currently in the pipeline,
capacity gap. to give certainty to the market, and to
leverage in additional funding for further
3.127 To date, LWARB has committed to projects. There are currently a number of
making loans to six infrastructure funds to leverage investment from, which
projects totalling £18.3 million – see could contribute to developing waste
Table 5. These projects will deliver a management infrastructure in London,
total of 428,000 tonnes of additional including the London Green Fund (£186
waste management capacity, for local million).
authority collected waste and C/I
waste 67. 3.131 These substantial costs could be
partially offset, however, by savings
3.128 As pointed out earlier, London currently achieved through the successful
deals with a proportion of its waste by implementation of the full range of
exporting it to other regions, mostly to Mayoral waste policies – for example:
landfill. The London Plan sets stringent,
but achievable, targets for the capital's Managing London’s LACW in the
waste authorities to progressively most optimal way through reuse,
increase internal waste management recycling and renewable energy
capacity so that the exported component generation could save London waste
decreases over time. The Mayor is authorities up to £90 million per year.
working with waste authorities in Preparing London to manage all its
neighbouring regions to monitor and plan waste (including C/I and CDE waste)
for this transition towards self sufficiency, in the most carbon efficient and
particularly against the background of economically beneficial way could
progressive exhaustion of landfill generate approximately 1260 green-
capacity outside London. collar jobs and contribute £52 million
d) Waste infrastructure funding of direct Gross Value Added (GVA)
to the economy each year to 2025.
and delivery
3.129 It is estimated that the total infrastructure
investment required for London’s waste
management needs could have capital
costs in the region of £2bn and annual
operational costs of £150 million.
67
Ibid, pages 60 and 117
Page 49 of 112
LONDON PLAN IMPLEMENTATION PLAN
68
The Mayor’s Municipal Waste Management Strategy,
November 2011, page 95
Page 50 of 112
LONDON PLAN IMPLEMENTATION PLAN
EDUCATION
a) Education infrastructure need
69
This does not take account of some spare capacity
within some schools nor take account of London’s
higher mobility of children across borough boundaries
70
Mayor of London. Projected Demand for Places at
Higher Education Institutions in London, Intelligence
update 13-2011.
http://data.london.gov.uk/datastore/package/projected-
demand-places-higher-education-institutions-london
Page 51 of 112
LONDON PLAN IMPLEMENTATION PLAN
Table 6: Actual and projected demand for full-time undergraduate places at London
HEIs
Table 7: Actual and projected demand for full-time postgraduate places at London HEIs
3.137 Tables 6 and 7 show that on current before they can accept new
trends, the rate of increase is projected international students and restricting
to be higher among overseas students applicants to study one course only)
(particularly non-EU) than among
The supply of student accommodation in
domestic students. However, it is
London and the affordability of rents are
important to note that the Government
key considerations for students and
proposals below will affect future
factors in the choice of the institution and
demand for places from students and
the overall attractiveness of HEIs in
these are not factored into the above
London. Strategic planning is essential if
projections:
the projected demand for new bed
spaces in student accommodation is to
Change to tuition fees for domestic be met.
students and more specifically
London
Immigration policy to address non-
economic routes of migration into the
UK (the introduction of higher English
language requirements for incoming
students, limitations to the amount of
international students education
providers can accept, standards that
education providers need to meet
Page 52 of 112
LONDON PLAN IMPLEMENTATION PLAN
71
This is calculated by London Councils as a shortage 3.145 In 2011 the Government allocated an
of 78,923 primary school places and 12,227 secondary extra £260 million to the capital to
school places across London, between 2011/12- address the serious shortage of places
2015/16. They estimate total cost of meeting such a needed in primary schools in the next
shortfall as £2.3bn by 2015.
Page 53 of 112
LONDON PLAN IMPLEMENTATION PLAN
four years. The 2012 Autumn Statement Parliament. This will include new
with £1 billion to expand ‘good’ schools specialist maths Free Schools for 16-
and build 100 new Free Schools and 18 year olds, supported by strong
academies (national figures). London university maths departments and
authorities can use the capital funding academics; and
they receive from the DfE to establish invest an additional £600 million to
new schools, with a statutory support those local authorities with
presumption that these should be the greatest demographic pressures
Academies or Free Schools. Free – the majority of which are in
School groups can also access capital London. This funding is enough to
funding through the Free School deliver an additional 40,000 school
application process run by the DfE. Yet places.
many are struggling to find suitable sites
in their area of choice. 3.149 Planning obligations can be secured to
ensure delivery of new facilities and
services (see London Plan Policy 8.2). A
Higher education
number of boroughs are also bringing
3.146 Higher education in London is funded by forward proposals to use CIL for this
Higher Education Funding Council for purpose. Further investigations will be
England (HEFCE). HEFCE recurrent carried out on funding opportunities
funding allocated to universities and associated to higher education and
directly-funded colleges in London primary and secondary facilities.
totalled £1,386 million in 2011-12.
HEFCE’s grant is reducing to reflect the
higher proportion of funding available to
institutions through increased tuition fee
income from 2012-13 – the first year with
students paying fees of up to £9000 per
year. Total national HEFCE grant
available for 2012-13 is £5,311 million
(with £3,213 million for teaching)
compared to £6,507 million (£4,339
million for teaching) in 2011-12. This will
affect all London institutions
differentially, though most will see cash
reductions in their funding from HEFCE.
72
Do the Maths: tackling shortages of primary school
places in London. London Councils, April 2009.
Page 54 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.153 The planning of new facilities will take shifting care closer to home and out of
account of local commissioning priorities hospitals, including the early detection
which in turn are influenced by current and treatment of long-term conditions
and future health needs and demand for will place greater pressure on primary
services. London continues to and community care. Local decision
experience significant population growth making will also seek to integrate
and an increasingly ageing and services across primary and secondary
ethnically diverse population. Increased care and social care organisations.
demand for services, coupled with Health and wellbeing boards and their
Page 55 of 112
LONDON PLAN IMPLEMENTATION PLAN
partners undertake and contribute to the the focus on estate modernisation and
Joint Strategic Needs Assessment and efficiency that this level of new build
Joint Health and Wellbeing Strategy that development will continue. However,
inform GP commissioning plans and local authority and private sector
support the integration of delivery. regeneration and development schemes
offer an opportunity to deliver new
3.154 No infrastructure requirements for facilities and partially fill a funding gap
secondary care are provided at this through s106/CIL.
stage as further work is needed to
assess the implications of QIPP plans, c) Health infrastructure funding
hospital reconfiguration plans and and delivery
reviews of mental healthcare services.
Individual hospital sites will also be 3.159 The Spending Review 2010 has reduced
subject to rationalisation as different NHS capital funding by 17%, with the
institutions take out clinic and bed expectation that NHS organisations will
capacity. achieve £20 billion savings through
quality and productivity improvements by
b) Health infrastructure provision 2014. The Operating Framework for the
NHS in England states that there will be
3.155 Currently health estate planning is driven no automatic capital allocations for
by PCT clusters who are developing PCTs, with necessary funding being
estate strategies. Making better use of granted on a case-by-case basis. The
the NHS estate in London is a key priority for capital funding will be on
element of QIPP with a focus on maintenance and essential smaller
providing greater access to services and improvement schemes. It is likely that
improving the quality and efficiency of capital funding for new build schemes
the estate. New premises should be able will be tightly constrained. Also,
to deliver sufficient capacity to meet the additional demand for healthcare
needs of existing and future patients and services generated by rapid population
deliver care closer to home, which will increases and transient populations will
include investment in out-of-hospital generate significant revenue costs which
services. are not immediately picked-up in PCT
allocations.
3.156 Specialist hospital services are being
centralised and community health 3.160 Based on estimated housing capacity
services have been transferred to and population increase on large sites in
hospital trusts. Plans are underway to the designated Opportunity Areas and
reconfigure hospital services in north Areas of Intensification from, it is
east London, in north London and in estimated that broad health
south east London. infrastructure costs will be around £ 1 –
1.5 bn. 73 This figure includes both
3.157 The NHS estate in London (valued at primary and secondary capital and
current use at approx £6 billion) is revenue costs.
complex, comprising some 2,000 sites
operated by many different
organisations, many of whom are
undergoing major reorganisation. The
ownership and management of the PCT
estate is changing. Some properties
have been transferred to community
service providers, whilst PCTs retain the
residual estate for the time being.
73
3.158 During 2010/11, 21 new primary care London Strategic Housing Land Availability
centres were opened. It is unlikely given Assessment and Housing Capacity Study
(SHLAA/HCS) and the HUDU Model
Page 56 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 57 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.168 The sport facility stock in London Table 9: Unit costs for key community
changes on a regular basis with new sports facilities
sites opening and some sites closing.
The Mayor’s technical report on Sports Facility Facility Costs
Facilities in London 76 is both used by the Type Details
GLA (Mayor’s Capital Legacy Fund) and
Sport England via their investment Pools 25m pool
£3,120,000 77
programmes to inform their decision (5 lane)
making processes in relation to the
capital grants that they allocate in Sports hall 1 court - 4 £800,000 -
London. This helps to ensure that the court £2,685,000
investment is targeted to have the
Artificial
maximum impact. The data from the £690,000 -
grass
technical report is also used by National £1,185,000
pitches
Governing Bodies as part of the
production of their National Facility
Strategies which delineate the priorities Source: Sport England
for facilities for those sports in London
77
http://www.sportengland.org/facilities__planning/plannin
76
Ibid. http://www.london.gov.uk/who-runs- g_tools_and_guidance/planning_kitbag/facilities_costs.
london/mayor/publications/planning aspx
Page 58 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 59 of 112
LONDON PLAN IMPLEMENTATION PLAN
Strategic 5 units
Deployment
Facilities5
Pan-London 4 units
Training Facilities
Specialist Undetermined
Operational
Training Facilities
Regional Ware- 4 units
housing Facilities
Page 60 of 112
LONDON PLAN IMPLEMENTATION PLAN
Source: Cgms
Page 61 of 112
LONDON PLAN IMPLEMENTATION PLAN
3.177 New buildings, whether homes or 3.180 The LFB’s Asset Management Plan
business premises, will be built to a describes the intentions for the location
modern standard and many will have fire and regeneration of fire stations in
protection measures incorporated. There London. This is based on modelling work
is a relationship between the risk of fire which has identified the best locations
and deprivation, but improving living for fire stations (and the number of
standards which new homes will bring, vehicles they need to accommodate)
and greater public awareness of the and a detailed review of the LFB’s
causes and risks of fire should see a property estate.
reduction in the number of incidents. It is
expected that London will continue to 3.181 The 2009 Asset Management Plan
see an overall reduction in the number of identified 30 priorities for property
incidents attended by the London Fire improvement. Of these, 19 priorities are
Brigade up to 2030. currently addressed – 9 replacement fire
stations as part of a Private Finance
3.178 The LFB looks at when and where Initiative (PFI) project (Dagenham,
incidents have happened in the past to Dockhead, Leytonstone, Old Kent Road,
determine the future demand for their Orpington, Mitcham, Plaistow, Purley
emergency response service. The LFB and Shadwell), Harold Hill (construction
have detailed incident records going completed) and Walthamstow
back to 2000 and are able to use such (construction underway), and a new site
data to accurately model and plan for the to replace West Norwood fire station
future. Over the past decade the LFB (subject to planning permission). 3
have been successful in reducing the stations are awaiting potential
number of emergency incidents they development proposals as part of the
have to attend (through their community LFB’s Corporate Property Project
and regulatory safety work). This (Lambeth, Kentish Town and
however does not directly lead to a Clerkenwell) and 4 stations have been
reduction in the number of staff or included in the Capital Programme
vehicles they need as the complexity of (Deptford, Holloway, Plumstead and
East Ham) for either rebuild or
79 refurbishment.
Fourth London Safety Plan 2010/2013
Page 62 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 63 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 64 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 65 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 66 of 112
LONDON PLAN IMPLEMENTATION PLAN
c) Green infrastructure funding 3.197 The Mayor is far from alone in providing
and delivery support for green infrastructure across
London. Stakeholder programmes that
3.194The precursor to the ALGG was the East are helping to deliver the ALGG include:
London Green Grid. Many of the projects Heritage Lottery Fund’s Parks for People
identified in this sub region received as well as Landscape Partnerships
funding through the Government’s funds; the Environment Agency’s river
Thames Gateway Parklands initiative. In restoration programme; and funding
the current economic climate it is unlikely secured by a wide range of third sector
that similar levels of resource will be organisations to deliver a wide range of
available directly from the public purse nature conservation, food-growing and
for the expanded ALGG. tree-planting projects.
3.195However, alternative funding streams 3.198 The supplementary guidance on
and new ways of resourcing green preparing tree and woodland strategies,
infrastructure are being explored as part advocates the incorporation of the
of the ongoing development of the green valuation of these assets as a
infrastructure concept. Quantifying the mechanism for identify their full value to
costs and benefits of investing in green communities. In London the Capital
infrastructure is one of the key objectives Asset Valuation for Amenity Trees
of the Government’s recently launched (CAVAT) 84 is followed by TfL and a
83
Green Infrastructure Partnership . This number of boroughs, and the i-tree 85
will highlight the multi-functional nature methodology has also been used. It is
of green infrastructure, which means the hoped to extend the use of i-tree across
opportunity to be provided and London.
resourced as a component of, or
complementary to, other infrastructure 3.199 Developer contributions are of high
and services such as flood and water importance to the funding of green
management, transport and public infrastructure: London Plan Policy 5.10
health. requires major developments within the
CAZ to contribute to green infrastructure
3.196 Mayor’s direct delivery programme for towards the Mayor’s target and Policy
the ALGG is via his London’s Great 2.18 requires developments in deficiency
Outdoors initiative and includes the areas for Regional or Metropolitan Parks
Mayor’s Street Trees initiative and his to contribute appropriate elements of
Pocket Parks fund. It also includes: the green infrastructure. Boroughs may also
former Help a London Park programme; consider the inclusion of green
the ‘Big Green’ fund, which will support a infrastructure investment into a local
number of exemplary strategic scale Community Infrastructure Fund (CIL).
projects or clusters of projects; other
green space enhancements delivered 3.200 The Opportunity Areas and large-scale
through Transport for London’s public regeneration schemes provide specific
realm programme; the Outer London opportunities for the integration of green
Fund and the Mayor’s Regeneration infrastructure from the outset.
Fund. These have and will continue to
enable Londoners to gain access better 3.201 A key issue for green infrastructure is the
quality spaces; increasing opportunities cost of maintenance as well as the
for coming together, relaxing and original capital expenditure. The London
playing; for healthy living, food growing Parks and Green Spaces Forum and the
and a little more contact with nature. London Benchmarking Group have
developed an annual benchmarking
84
CAVAT - Capital Asset Valuation for Amenity Trees.
83
http://www.defra.gov.uk/environment/natural/green- 2010. London Tree Officers Association
85
infrastructure/ Green Benefits in Victoria, Victoria BID June 2012
Page 67 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 68 of 112
CHAPTER 4
FU N DI NG
OP P O R T U N I T I E S
LONDON PLAN IMPLEMENTATION PLAN
Page 70 of 112
LONDON PLAN IMPLEMENTATION PLAN
Other potentially relevant funding 4.4 The Mayor is seeking greater financial
opportunities include: independence and aims to influence
Government on its review of local
o local government bonds Government finance that started in
(which were used by TfL to summer 2011. In particular he would like
finance £600m of investment to see changes to the criteria for funding
in the Tube system between allocation recognising the generation of
2004-2006) outputs and tax income, which are
o the Private Finance Initiative significantly higher in London than in all
(subject to a robust other parts of the country. Currently it is
evaluation to ensure value for only based on expenditure need. This is
money and government also of importance as the density of
support) development in London creates an
o encouraging local added imperative for investment
government pension funds to because the downside risks of
invest in delivering breakdown are so much greater in a
infrastructure projects large, crowded, city than elsewhere in
o placing local authority assets the country. 88 The London Finance
into special purpose vehicles Commission has been set up by the
(e.g. local housing companies Mayor to look at new ways of devolving
or urban regeneration funding to London. Comprising a number
companies) to promote of experts, the Commission will examine
investment in partnership with the potential for greater devolution of
private developers both taxation and the control of
o Other central and local funds resources (capital and revenue) to
which could be used to improve the tax and public spending
support infrastructure. arrangements for London. It will report to
the Mayor in Spring 2013.
88
GLA Economics, Public Spending Priorities in
London, 2010
Page 71 of 112
CHAPTER 5
C O N C LU S I O N S
AN D LO O K I N G
AH E A D
LONDON PLAN IMPLEMENTATION PLAN
Page 73 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 74 of 112
LONDON PLAN IMPLEMENTATION PLAN
5.13 The Implementation Group will over whilst the sub-groups will continue to
time establish its role in supporting the communicate virtually as and when
revisions of the Implementation Plan. It new data/information for a specific
will also be a useful forum to share type of infrastructure are emerging.
expertise and enable cooperation The Mayor is planning to undertake
between its members and beyond. This further work and mapping the
could be important in the light of the strategic infrastructure required to
demonstrated complexity of deliver the optimum level of
implementation planning and the lack of Opportunity Areas and Areas of
capacity of public sector planning staff in Intensification. Only for a few
this area. The group may also help to Opportunity Areas (draft) Planning
identify aspects that are of importance in Frameworks have been produced
policy terms and should be considered that address strategic infrastructure
for the next London Plan review. Work requirements in detail. The work on
on a comprehensive Further Alterations the VNEB OAPF is exemplary in this
document is expected to start during respect and similar studies have
2013. been prepared for the Olympic
Legacy SPG and White City. This
5.14 There is a clear link between the and the infrastructure need and
Implementation Plan and the Annual provision for other emerging OAPFs
Monitoring Report (AMR). Whilst the should be informed by the VNEB
latter looks at past performances to example and this Implementation
identify trends, the Implementation Plan Plan and vice versa to ensure some
is focusing on current and future actions degree of consistency and over time
to facilitate policy implementation and to build up an overview of the
improvements. However, the regular cumulative infrastructure
updating of the Implementation Plan requirements of these growth areas.
provides a monitoring mechanism in The Mayor is considering to promote
itself indicating if the identified actions a common London approach to the
are carried out and adding further action production of IDPs and CIL Charging
to support policies and strategic Schedules in close cooperation with
infrastructure required. A lack of the London boroughs. This would
implementation mechanisms for certain also facilitate their application of the
policies or infrastructure requirements Duty to Cooperate. In terms of CIL
could also be identified linking this further guidance could include the
Implementation Plan similarly to the infrastructure to be covered, common
AMR back to the review of policy. The timescales (short, medium and long-
AMR will continue to be published terms), a common approach to cost
annually at the end of February whilst estimates and information about
the Implementation Plan will be updated funding sources.
every summer. This will allow them to
inform each other where appropriate. 5.16 The Mayor is also keen to facilitate the
co-ordination of underground
5.15 The following specific issues lie ahead infrastructure works to minimise
for the further development and next disruption on residents and road users. In
iteration of the Implementation Plan: September 2011, he introduced his
‘Roadworks Pledge’, which set out the
There is the opportunity to discuss standards Londoners should expect to
updates and additions with see adhered to at all works sites in the
stakeholder groups. capital. He recently agreed a
The Implementation Group will meet strengthened Roadworks Code of
once or twice per year, as the Conduct, setting out joint targets for
differences between the various improving the management of roadworks
types of infrastructure would not and reducing traffic disruption. The
warrant more frequent meetings, London Permit Scheme for Roadworks is
Page 75 of 112
LONDON PLAN IMPLEMENTATION PLAN
Page 76 of 112
ANNEX 1
S U M M A RY O F K EY
I M P LM E N TAT I O N
ACT I O N S
LONDON PLAN IMPLEMENTATION PLAN
Page 78 of 112
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
LONDON'S PLACES
The London Context
PL.1 Eurocities - cooperation Partnership 2.1 London Europe Office, other Strong
with other major cities in Eurocities commitment
Europe to promote urban
policies
PL.2 C40 Leadership Group - Partnership 2.1 GLA, leaders of participating world Strong
sharing good practice on cities commitment
requirements to be
explored further
PL.12 Regeneration Schemes - Investment 2.14, 2.9 Boroughs, GLA Group, Strategic Dependent on
include integrated spatial Partnerships, HCA, developers individual
policies and initiatives that circumstances
bring together
regeneration,
development and
transport proposals with
improvements in learning
and skills, health, safety,
employment, environment
and housing implemented
through locally-based
plans and strategies,
particularly in inner
London
PL.13 Compulsory Purchase Action plan / 2.14, 2.15, GLA Group, boroughs Dependent on
Orders - in particular to designations 7.26 individual
enable for example circumstances
regeneration, town centre
renewal, wharf re-
activation
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
Functional Areas within London
PL.14 Town Centre SPG – give Strategy / 2.15, 2.16, GLA, developers 2013 Strong
detailed guidance for guidance 4.2, 4.5- commitment
policies in relation to town 4.9
centre land uses (retail,
leisure, culture, tourism,
offices, housing, social
infrastructure and mixed
Equalities
PE.1 Implement Economic Strategy / 4.12 GLA Group and other London Dependent on
Development Strategy - guidance stakeholders resources
support Londoners to
enter and sustain
employment
PE.2 Improve cooperation Partnership 3.2 GLA, NHS London Dependent on
between GLA and NHS better
London - to reduce health partnership
inequalities and improve working
the health of all
Londoners.
PE.3 Health Impact Research / 3.2 GLA, boroughs, developers Dependent on
Assessment (HIA) - for assessment resources and
major applications and on local
OAPFs and review commitment
progress
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
PE.4 Implement Health Strategy / 3.2 GLA Strong
Inequalities Strategy guidance commitment
and its action plan - by
setting up plans and
actions that contribute to
Objective Five: Healthy
Places
PE.5 Update Best Practice Strategy / 3.2 London Councils, GLA, Hudu 2012 Dependent on
Guide on Planning for guidance resources
Housing
PE.6 Strategic Housing Land Research / 3.3 Boroughs, developers and 2013/14 Strong
Availability Assessment assessment landowners commitment
PE.7 Local Annual Monitoring Research / 3.3 Boroughs Annually Statutory
Reports - updating local assessment requirement
housing trajectories
PE.8 Housing SPG - guidance Strategy / 3.3, 3.4. GLA Published Nov 2012 Strong
on delivering increased guidance 3.5, 3.7, commitment
housing output including 3.8. 3.10,
guidance on housing 3.12, 3.13,
design, affordability and 3.16 -3.19,
social infrastructure 7.4
requirements
PE.9 Density Matrix - guidance Strategy / 3.4 Boroughs 2014 Dependent on
for boroughs - can be guidance local
refined in light of local commitment
circumstances regarding
transport capacities, local
character, infrastructure
needs and provision for
play and open space
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
PE.10 London Housing Design Strategy / 3.5 GLA, HCA 2010 Strong
Guide - at the core of the guidance commitment
guide are new minimum
space standards, also
advocates improvements
in the development and
procurement process so
that design remains
valued from vision to
guidance to boroughs on
providing for the play and
recreation needs of
children and young people
and the use of benchmark
standards in the
preparation of Play
Strategies
PE.12 Play Strategies - Strategy / 3.6 Boroughs Ongoing as part of Dependent on
strategies to identify play guidance Local Plans resources
space requirements and
mechanisms for ensuring
access to high quality play
spaces and facilities
PE.13 Planning Framework - Strategy / 3.7 Developers Strong
for sites over 5 hectares guidance commitment
or capable of
accommodating 500
dwellings
PE.14 Update London wide Research / 3.8, 3.12 GLA 2014 Strong
Strategic Housing assessment commitment
Market Assessment
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
PE.15 Sub regional Strategic Research / 3.8, 3.12 Boroughs, sub regional partners, Completed 2011/12 Strong
Housing Market assessment GLA commitment
Assessments - to identify
housing requirements
PE.16 Update Best Practice Strategy / 3.8 GLA 2010/11 Dependent on
Guide on Wheelchair guidance resources
Accessible Housing - for
boroughs and developers.
Advice to be incorporated
Strategy - investment
through the Targeted
Funding Stream from HCA
London to boroughs
PE.18 Local Annual Housing Strategy / 3.15 CLG, boroughs, GLA Annually Dependent on
Improvement guidance local
Programme (HIP) - commitment
improvement programme
for all local authority
homes to the Decent
Homes Standard, purpose
to inform local housing
strategies, allows
comparisons across the
region and monitor central
government developments
Affordable housing
PE.19 Economic viability Research / 3.12 Boroughs, GLA During local plan Strong
assessment of assessment preparation commitment
affordable housing - to
inform local targets
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
PE.20 Update to affordable Strategy / 3.13 GLA, HCA 2013 Strong
housing toolkit - to assist guidance commitment
in appraising the viability
of schemes
PE.21 Affordable housing Research / 3.13 Developers On submission of Strong
toolkit assessments - assessment applications commitment
toolkit is designed to
indicate the financial
viability of developments
affordable housing
PE.23 Mayor's Housing Strategy / 3.13 GLA 2013 Strong
Strategy - includes guidance commitment
commitment to delivery
affordable homes
PE.24 Thresholds in Local Strategy / 3.14 Boroughs, GLA Strong
Development guidance commitment
Frameworks - for
affordable housing
Social infrastructure
PE.25 Extend proposed Strategy / 3.16, 3.17 GLA, Hudu, boroughs, NLSA 2013 Dependent on
guidance Shaping guidance resources
Neighbourhoods -
Lifetime
Neighbourhoods and
Neighbourhood
Planning SPGs - social
infrastructure
requirements - especially
at the sub-regional and
Londonwide level
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
PE.26 MPA/MPS Estate Strategy / 3.16 MPA/MPS 2013 Strong
Strategy - provide the guidance commitment
strategic framework for
the management of their
estates
PE.27 Partnership working for Partnership 3.17 GLA, NHS London, boroughs, Dependent on
new health facilities - PCTs, Hudu Government
coordination of planning decision /
and needs guidance
capital
PE.29 Londonwide Sports Strategy / 3.2, 3.19 GLA, boroughs, Sport England Dependent on
Facilities Strategy - guidance resources
building on completed
analysis
LONDON'S ECONOMY
Employment land
EC.1 London Office Policy Research / 4.2 GLA Regularly – latest Strong
Review - regular assessment update published commitment
monitoring of the London Sept 2012
Office Market
EC.2 London Office Review Research / 4.2 GLA Regularly Strong
Panel (LORP) - review of assessment commitment
office market, trends and
prospects with expert
panel
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
EC.3 Industrial demand study Research / 2.17, 4.4 GLA, TfL, boroughs, property 2011 Strong
- to complement supply assessment agents commitment
side study and provide
update of industrial land
release benchmarks and
borough categorisations
EC.4 Land for Industry, Strategy / 2.17, 4.4, GLA Published Sept 2012 Strong
Employment and guidance 6.2, 7.26, commitment
Transport SPG - 5.17, 5.14
other uses
Tourism and culture
EC.5 Tourism marketing and Partnership 4.5 London & Partners, tourism and Dependent on
promotion – London & regeneration partnerships, Tourism resources
Partners to work with local for All
networks to develop and
promote outer London
tourism products
EC.6 Green Tourism Scheme Strategy / 4.5 Green Business UK, business Dependent on
- certification scheme to guidance operators, Visit London, individual
improve tourism circumstances
businesses' environmental
performance and local
supplier networks
EC.7 Hotel Demand Study – Research / 4.5 GLA 2013 Strong
inform policy and assessment commitment
guidance on visitor
accommodation related
issues
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
EC.8 Accessible Hotels in Research / 4.5 GLA, boroughs, hotel operators and 2011/12 Strong
London Study - advice to assessment developers commitment
boroughs and developers
on the provision of
wheelchair accessible
hotel bedrooms. Advice
to be incorporated into
Town Centres SPG as
appendix C.
management
EC.10 Identify sites for Cultural Action plan / 4.6 Boroughs, GLA, London & Partners, Ongoing through Dependent on
Quarters - designate designations cultural agencies, tourism and local plans local
places to accommodate regeneration partnerships, Sport commitment
new arts, cultural and England
leisure activities as the
basis for exploring the
potential for leisure offers
of wider importance
Retail and emerging economic sectors
EC.11 Strategic retail needs Research / 4.7 GLA Every 4-5 years Strong
assessment - London assessment commitment
wide retail needs study to
inform strategic retail
planning
EC.12 Local retail needs Research / 4.7 Boroughs Ongoing through Strong
assessment - detailed assessment local plans commitment
retail needs study to
inform retail planning
policies in LDFs and Town
Centre Strategies
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
EC.13 London's retail street Research / 4.8 GLA 2010 Strong
market study - provides a assessment commitment
spatial and economic
analysis of London's retail
street markets and
presents key trends
affecting sector
EC.14 Explore Green Action plan / 4.10 GLA, boroughs, developers OAPFs are underway Strong
Enterprise Districts - designations commitment
performance of new
buildings
CC.5 Mayor's retrofit Action plan / 3.15, 5.1, GLA Dependent on
programmes – designations 5.4, 5.7 resources
RE:CONNECT, RE:FIT
and RE:NEW - improve
environmental
performance of identified
areas, existing public
sector buildings, existing
homes: RE:CONNECT:
10 low carbon zones,
each of which has signed-
up to deliver a 20.12%
reduction in CO2
emissions by 2012,
RE:NEW: 1.2 million
homes by 2015, RE:FIT:
40 % of public sector floor
space retrofitted by 2025
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
CC.6 Decentralised Energy Strategy / 5.5, 5.6 GLA, boroughs, developers, energy Dependent on
Programme Delivery guidance / providers individual
Unit - supporting the partnership projects
commercialisation of
large-scale decentralised
energy projects by offering
commercial and legal
advice and helping to
secure the investment
Management Plan - assessment 5.12, 5.13 GLA, Environment Agency, Thames commitment
address flooding from Water, TfL, London Councils
surface water and
borough requirement to
produce Preliminary Flood
Risk Assessments, Maps
of Flood Risk Areas and
Flood Hazard Maps.
CC.15 Thames Tideway Sewer Investment 5.14 Thames Water By 2015 (Lee Tunnel) Strong
Tunnels - prevent sewer and 2023 (Thames commitment
overflow Tunnel)
CC.16 Wastewater Treatments Investment 5.14 Thames Water 5 completed by 2014, Strong
Works Upgrades - Deephams by 2020 commitment
improve capacity and
performance
CC.17 River Basin Strategy / 5.14, 7.28 Environment Agency working with 2013/14 (covering Dependent on
Management Plan - guidance key sectors on action plan 2015-2022) resources
improve water
environment
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
CC.18 Water Resource Investment 5.15, 5.3 Water Companies 2013/14 (covering Strong
Management Plans - 2015-2040) - review commitment
address how to meet every 5 years
future potable water
demand
CC.19 Measures to achieve Research / 5.15, 5.3 London Water Group, GLA, Dependent on
and maintain Water assessment Environment Agency resources
Neutrality - reduce water
demand
process to follow to
determine development
proposals potentially
affected by hazardous
installations
LONDON'S TRANSPORT
Transport capacity and connectivity
TR.1 The Mayor's Transport Strategy / 5.8, 6.1, TfL, GLA Summer 2010 - Statutory
Strategy - the transport guidance 6.11 regular review requirement
component of the Mayor's
strategic policy framework
TR.2 Sub-regional Transport Strategy / 6.1, 2.5, TfL, sub-regional partnerships, Regular updates Strong
Plans - five year plans, guidance 6.4 boroughs commitment
translate MTS into sub-
regional priorities
TR.2A Local Implementation Strategy / 6.2, 6.9, Boroughs Statutory
Plans - delivering the guidance 6.10, 6.11, requirement
MTS through borough 6.12, 7.14
initiatives
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
TR.3 Negotiation with Partnership 6.2 Boroughs, developers, TfL Dependent on
developers - to safeguard resources
land for transport
schemes
TR.4 Transport Assessments Research / 6.3 Developers, boroughs, TfL Statutory
- in line with Best Practice assessment requirement
Guidance
TR.5 Travel Plans - in line with Action plan / 6.3 Developers, boroughs, TfL Statutory
Guidance for Workplace designations requirement
transport investments,
includes behavioural
change, effective
operational planning as
well as provision of new
infrastructure
Public transport
TR.7 Major public transport Investment 6.4, 2.8 TfL, Government, train operating See Table 6.1 Dependent on
schemes - listed in Table companies (TOCs), funding through resources
6.3 of London Plan, DfT, Network Rail and TfL
including connectivity of
outer London
TR.8 Crossrail s106/CIL SPG - Strategy / 6.5, 8.2, Mayor/TfL in consultation with 2013 Strong
provides guidance on guidance 8.3 boroughs and developers commitment
funding and replaces SPG
from 2010
TR.9 Bus/tram schemes - Investment 6.7 TfL, boroughs, funding through TfL Varies - see Table Dependent on
listed in Table 6.3 London 6.1 - buses ongoing, resources
Plan - including bus trams post 2020
network development
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
TR.10 Feasibility study on Research / 6.8 TfL, boroughs, developers Completed in 2012 Strong
coach hubs - to reduce assessment commitment
travel from/to Victoria
Coach Station
Cycling and walking
TR.11 Cycling Schemes - listed Investment 6.9, 4.5 TfL, boroughs, funding through TfL Varies - see Table Dependent on
in Table 6.1 of London 6.1 – Superhighways resources
Plan - including expansion until at least 2015
Lifetime 3.19
Neighbourhoods and
Neighbourhood
Planning SPG - to
provide guidance on the
implementation of the LTN
principles
PS.2 Characterisation Studies Research / 7.1, 7.3, Boroughs, developers 2015 Dependent on
- evidence to underpin assessment 7.4, 7.5, technical
amongst others local 7.7 expertise / data
neighbourhood strategies
and decisions on
appropriate balance
between security and
permeability in different
areas
PS.3 Local Infrastructure Strategy / 3.1, 7.1 Boroughs, social and physical Dependent on
Plans - setting out new guidance infrastructure providers technical
infrastructure priorities to expertise / data
meet needs of existing
and new communities
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
PS.4 Accessible London SPG Strategy / 7.2 GLA, boroughs, developers, Access 2013 Strong
- update - provides guidance Forums, deaf and disabled people's commitment
guidance to boroughs on organisations (DDPOs)
implementing the
principles of inclusive
design and achieving an
inclusive environment.
Advice to form part of the
Shaping Neighbourhoods
PS.20 Habitat Regulation Research / 7.19 GLA, boroughs, Natural England, Statutory
Assessments - for assessment developers requirement
appropriate Opportunity
Area Planning
Frameworks (OAPFs) and
Areas of Intensification
(AoIs)
PS.21 Foundation SPG – site Action plan / 7.20 London Geodiversity Partnership - SPG: Published
designation and evidence, designations led by Natural England, with GLA, March 2012, GAP:
Geodiversity Action boroughs, British Geology Society Until 2013
Plan to assist in
understanding and
protection of designated
sites
PS.22 Mayor's Trees initiative Investment 5.9, 7.21 GLA, Forestry Commission Ongoing to 2015 Strong
– increasing street tree commitment
cover
PS.23 Regional Forestry Strategy / 7.21 Forestry Commission By 2015 Dependent on
Framework - revision to guidance resources
reflect recent Mayoral
priorities for street trees
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
PS.24 Trees and Woodlands Strategy / 7.21 GLA, Forestry Commission Published July 2012 Dependent on
SPG - guidance on guidance resources
preparation of Borough
Tree strategies
PS.25 Implementation of Food Strategy / 7.22 GLA, London Food Board, boroughs Ongoing to 2012 Strong
Strategy - revision of guidance commitment
implementation plan
PS.26 Capital Growth - financial Investment 7.22 GLA, boroughs providing sites for 2,012 new growing Dependent on
support and advice voluntary groups spaces by 2012 individual
provision
Blue Ribbon Network
PS.28 Implement River Piers Strategy / 7.25 TfL, River Service Concordat Strong
Plan - provide additional guidance Group, boroughs, developers, Port commitment
piers where required to of London Authority
support river passenger
transport
PS.29 Investment in cruise Investment 7.25 Developers, boroughs, GLA, Port of 1 planning permission Strong
liner requirements - to London Authority granted in 2011 commitment
provide improved cruise
liner facilities
PS.30 Safeguarded Wharves Strategy / 7.26 GLA, TfL, Port of London Authority, Completion of review Strong
Review – water freight guidance Canal and Rivers Trust by early 2013, commitment
demand forecast and reviews every 5 years
current capacity estimate,
assessment of all
safeguarded sites and
recommendation of
revised set of safeguarded
wharves to Government to
initiate required changes
to Safeguarding Directions
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
PS.31 Investment in re- Investment 7.26 GLA, TfL, Port of London Authority, 3 by 2015 Dependent on
activating wharves - cargo operators, boroughs resources
bring currently vacant /
unused wharves into
operation for river freight
PS.32 Enjoying Water project - Research / 7.27 Environment Agency, boroughs Completion in 2011, Dependent on
regional study in London assessment annual reviews resources
and the South East to
explore need and
facilities in London to
address shortfall
PS.34 Maintain London Rivers Action plan / 7.28 Environment Agency, boroughs Dependent on
Action Plan - interactive designations resources
database of opportunities
for restoration projects
PS.35 Development/update of Action plan / 7.28, 7.29 Boroughs, existing partnerships Dependent on
Thames Strategies - designations (Hampton-Kew, Kew-Chelsea, East) local
tools to ensure commitment
coordinated action related
to the river and inform
local policy
IMPLEMENTATION, MONITORING AND REVIEW
MR.1 London Plan Strategy / 8.1, 8.4 GLA, Implementation Group Published Jan 2013, Strong
Implementation Plan guidance updated annually commitment
during summer
action implementation action action type London key deliverers timescale certainty for
no Plan 2010 2013 post on- notes key deliverers
policies to to 2018 going
supported 2012 2018
MR.2 Annual Monitoring Research / 3.3, 4.2, Boroughs, GLA, LDD using borough Annually in early Statutory
Report (AMR) - includes assessment 8.1, 8.4 returns spring requirement
monitoring performance
against KPIs, housing
targets, office market
benchmarking and other
issues
MR.3 Implement Mayoral CIL Strategy / 8.3, 6.5 Mayor, Transport for London, Review of the Strong
in conjunction with London guidance boroughs and other London Mayor's CIL in 2014, commitment
AC R O N Y M S A N D
AB B R E V I AT I O N S
LONDON PLAN IMPLEMENTATION PLAN
ANNEX 2:
ACRONYMS AND
ABBREVIATIONS
AMR Annual Monitoring Report
ALGG All London Green Grid
BAP Biodiversity Action Plan
BID Business Improvement District
BPG Best Practice Guidance
CAZ Central Activities Zone
CBI Confederation of British Industry
CCMES Climate Change Mitigation and Energy Strategy (GLA)
CDE Construction, Demolition and Excavation [waste]
CHP Combined Heat and Power
C/I Commercial and Industrial [waste]
CIL Community Infrastructure Levy
CLG Communities and Local Government
CSR Comprehensive Spending Review
DDPO Deaf and Disabled Peoples' Organisation
DE Decentralised Energy
DECC Department for Energy and Climate Change
DEPDU Decentralised Energy Programme Delivery Unit
DLR Docklands Light Railway
DNO Distribution Network Operator
DPD Development Plan Document
EiP Examination in Public
ERDF European Regional Development Fund
ESCO Energy Service Company
GIGL Greenspace Information for Greater London
GOL Government Office for London
HCA Housing and Communities Agency
HEI Higher Education Institution
HIA Health Impact Assessment
HIP Housing Improvement Programme
HRA Habitats Regulation Assessment
HSE Health and Safety Executive
HUDU Healthy Urban Development Unit (NHS)
IAPF Intensification Area Planning Framework
IDP Infrastructure Delivery Plan
IRF Inter-regional Forum
You will need to supply your name, your postal address and state the
format and title of the publication you require.
Chinese Hindi
Vietnamese Bengali
Greek Urdu
Turkish Arabic
Punjabi Gujarati