In-Plant Training Report: Rajarshi Shahu Institute of Management
In-Plant Training Report: Rajarshi Shahu Institute of Management
In-Plant Training Report: Rajarshi Shahu Institute of Management
MANAGEMENT
Aurangabad
OF
Submitted by
Santosh D. Amilkanthwar
M.B.A. 2nd Year (FINANCE)
Guided By :-
Prof. Adnan
B.G.P.S.
RAJARSHI SHAHU INTITUTE OF
MANAGEMENT
DECLERATION
I hereby declare that this project report submitted by me in my
partial fulfillment of Master of Business Administration is a
genuine work of mine.
It has not been submitted either fully or partly to this or any other
institute prior, in any other connection.
Santosh D. Amilkanthwar
M.B.A. (3rd SEM) (Finance)
INDEX
1. OBJECT
3. TRADE UNION
4. DEPARTMENTS
4.5. Manufacturing
4.7. Marketing
4.8. Finance
4.9. Retrofit
5. CONCLUSION
6. BIBLIOGRAPHY
1. OBJECT
1.1. Object of the In plants training
In the modern day there is an essential of In plant training for
the partial fulfillment of the Master of business administration. It is
give the knowledge practical knowledge of the work environment to
the Management student. Therefore study of this project is an
important. Following are the main objectives of the In plant training.
society.
ISO CERTIFICATES
Re – Certified in 2001
Re – Certified in 2002
ABB is well acknowledged in India
Helen Keller Award
By National Centre for the Promotion of Employment for
Disabled People (NCPEDP) for supporting the differently-
abled with livelihood
CNBC
Top Nifty stock performer 2005
Business Standard
Star MNC of the year
Nasik : MV Switchgear
Mumbai
Satpur MIDC,
Nashik.
Established : 1979
1. INDOOR SWITCHGEAR
2. OUTDOOR SWITCHGEAR
3. PURCHASING DEPARTMENT
4. QUALITY ASSURANCE
5. MANUFACTURING
6. HR
7. FINANCE
8. RETROFIT
Purchasing:-
VENDOR EVALUATION:
Vendor evaluation is carried out to ascertain the capacity and
capability of the vendor to supply products of right quality at the right
time and at the right cost. Evaluation is carried out for both existing
vendor as well as new vendors. Evaluation is carried out with the help
of other functions like Quality, design, manufacturing and finance.
The main criteria for evaluation and approval are as mentioned below:
a) Method of handling customers order delivery requirement.
b) Process control.
c) Calibration method.
d) Method of identifying WIP accepted and rejected goods.
e) Layout of house keeping.
DISQUALIFICATION OF VENDOR:
If the vendor rating is found below 40, his performance is to
be reviewed with concerned function. This decision, whether the
vendor is to be disqualified or not, is taken during this review and
records are maintained. The factors responsible for disqualifying a
vendor are:
a) Functional criticality of the article
b) Availability of alternate source
c) Time required for development of new source.
REINSTATEMENT:
A disqualified vendor is allowed to appeal for reinstatement
provided he has made change for improvement and demonstrate the
evidence. In such a case an evaluation is made with higher degree of
precaution before reinstatement. A vendor is discontinued if the type
of article or service is no longer used in product of DMS.
Purchasing data:
Purchase order indicates the following details:
1. Drawing no. Description and rev no. of article ordered.
2. Commercial terms.
3. Packaging instruction if any
4. Quantity ordered and schedule.
5. Rate per unit of measurement.
6. Any other information if required.
7. Test certificate if required.
8. Shelf life requirements if applicable.
9. Verification and product release requirement.
PLATING:
The plating shop is responsible for surface treatment and silver
plating of copper and aluminum components, tinning of copper bus
bars and jumpers and tumbling operation.
The plating shop has the following inputs-
1) LF order from planning department.
2) LT order from planning department.
3) Machined jobs from m/c shop.
4) Chemicals
5) Other articles from stores for silver plating.
PROCESS:
1) The jobs are loaded in plating shop as per schedule given by
planning.
2) There are four processes in plating shop-
a) Silver plating on copper jobs.
b) Silver plating on aluminum jobs.
c) Tinning of busbars and jumpers as per drawing.
d) Deburring.
PASSIVATION BATH:
Fill tank with water add .025 to .037 ml/lt. of solution mix
thoroughly and heat the solution to 55-60 deg C. dip phosphate
component in solution for 2-3 min.
POWDER COATING:
Before powder coating the material is checked for dust particles,
powdery patches, rust, oil patches. Components are loaded o conveyer.
Powder coating operation is carried out inside the booth. Precaution
before coating is powder flow of the gun, earthing, voltage. Each side
4-5 coating is applied to get the required thickness of 40-60 microns.
For external component virgin powder is used and inside component
recycled powder. Powder coated jobs cured at 180 to 200 deg C for
15-20mins.
Assembly-line production
products are made in a work-
centers
Components and sub-
assembly units are
delivered through
integrated logistic system
Final assembly is organized by
“nest” system through
assembly teams
AIS - Assembly of low-voltage compartment
4.5 Marketing:-
MARKETING NETWORK
REGION SOUTH :
Banglore, Hyderabad, ishakapatnam, Chennai, Coimbatore,
Neyveli, Cochin
REGION NORTH :
New Delhi, Chandigarh, Jaipur, Lucknow, Ludhiana
REGION EAST :
Calcutta, Bhubaneshwar, Bhilai, Jamshedpur
REGION WEST :
Mumbai, Baroda, Pune, Indore, Jabalpur
The marketing department, formerly known as COU
(commercial operating unit), hands out the front end services to the
organization. As part of the newly dynamic organization structure, the
department has a major role to play in preparing all the tenders and
offers from the department itself.
When the order indent comes into the hands of the engineer he
has to prepare the schematics including the mechanical and the
electrical writing diagrams and then send them to the customer for
approval. There is some standard software available for the drawings
like PROMIS and PROMPTOOL which aid the engineer in converting
the items in the bill of material into a scheme acceptable to the
customer. In between if there is any discrepancy in the requirement
then the same is taken up with the design department. Then the
drawings get made ad sent. After the drawings are approved by the
customer the same is forwarded to the manufacturing shop wherein the
wiring is done according to the scheme prepared by the engineer. Then
after the manufacturing process starts according to which the engineer
has to give a tentative date to the customer for inspection. This calls
for good planning skills. When the customer comes for inspection the
engineer has to look after him and see to it that he is satisfied with the
quality of inspection the engineer has to look after him and see to it
that he is satisfied with the quality of the product being offered to
him. He has to be in touch with the quality department too to ensure
that the quality is maintained at all levels. After this when the job is
finished and is ready for dispatch the engineer has to arrange for the
dispatch clearance and make sure that the material is dispatched in a
proper condition. Even after the job is completed the engineer has to
keep track of the customer complaints and suitably address to the
customer satisfaction.
There is some application engineering going on in the
department too which takes care of the cost cutting measures at the
same time maintaining the quality of the product.
Also the engineer has to enter the status of the work he is doing
in a system known as SAP, which is a single platform wherein all the
plant process are integrated. It serves the function of maintaining the
accountability of a particular job with a person concerned.
INCOMING MATERIAL
Green channel:
It is direct channel of developed items to manufacturing /assembly
line for use where inspection is skipped.
4.8. Finance:
Financial management at ABB includes planning, organizing,
directing, and controlling financial activities in the organization. In
ABB all financial activities are headed by the corporate centre of the
company in Bangalore.
More than 1500 nos. breakers are retrofitted and are working
satisfactory in India and abroad.
Retrofitting of circuit breakers of various companies like NGEF,
Voltas, Jyoti which have closed down and are unable to support the
product in the market.
The retrofit division at Nasik’s MV plant plans to achieve 20%
of BAU’s revenue from services, spares and retrofit.
It also plans to appoint channel partners in region for spares to
increase market reach, generate more enquiries & faster response to
customers needs.
STRANGTHS
The company has many Bank facilities like long credit time
WEEKNESSES
THEREAT
OPPORTUNITIES
increase.
THEREAT
is very unstable.
There are so many other factors like environment, political and
regional.
CONCLUSION
In a giant company like ABB which is fastest growing in the field of
automotives & power generation, work is carried out in a very systematic,
sophisticated & technical manner. In the ABB is distinctly ahead today, the
market share in automotives & power generation is about 34%. So it’s good
sign that Indian technology is growing with quality.
Today world is full of competition, which has become more prominent and
distinct in this period of globalization and each aspect of the company needs
attention to survive, retain and grow in the market.
SUGGESITION
1) ABB LTD. should develop managerial skill particularly to
identify the weaker section to reach the benefits the social and
economic objects.