The document discusses the technical specifications for a SCADA/DMS system under Part A of the R-APDRP program. It describes the system's ability to collect and store sequence-of-events data with timestamps from remote terminal units with 1ms resolution at the control center. It also requires the system to support programming in IEC 61131-3 or other languages and allows operators to perform supervisory control functions on digital and analog points using select-check-before-operate sequences either individually or in groups.

Uploaded by

renv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views1 page

SCADA Project Guide - 14

The document discusses the technical specifications for a SCADA/DMS system under Part A of the R-APDRP program. It describes the system's ability to collect and store sequence-of-events data with timestamps from remote terminal units with 1ms resolution at the control center. It also requires the system to support programming in IEC 61131-3 or other languages and allows operators to perform supervisory control functions on digital and analog points using select-check-before-operate sequences either individually or in groups.

Uploaded by

renv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Power Finance Corporation

SCADA/DMS, system under Part A –R-APDRP


Model Technical specification
MGVCL/RAPDRP/SIA/1140

1.2.7 Sequence-of-Events data

Sequence-of-events (SOE) data shall be chronological listings of ‘status change


events with time stamp’ acquired from RTUs /FRTUs/FPIs. The SOE data shall be
collected from all RTUs/FRTU/FPI either in normal polling or periodically/on
demand . SOE data collection shall have lower priority than supervisory control
actions and normal data acquisition. The SOE data collected from different
RTUs/FRTU/FPI shall be merged for chronological listings and stored for
subsequent review. Atleast latest 1000 SOE data shall be available for display.
The SOE resolution of RTU/FRTU is defined in respective sections for
RTU/FRTU. SCADA/DMS system at control centre shall have 1ms SOE
resolution. However, as SOE time stamping is done at RTU/FRTU/FPI level ,
the same shall be in line with resolution defined for RTU/FRTU/FPI.
All SOE data collected from all RTU/ FRTU/FPIs shall be stored in daily RDBMS
database of ISR system.

1.2.8 SCADA language

The SCADA system shall have capability to write various programs using IEC
61131-3 SCADA language or C/C++ or any non proprietary language . It will
facilitate user (programmer) to write various programs/ logics using points defined
in the database .

1.2.9 Supervisory Control

The operator shall be able to request digital status control, set-point control and
raise/lower control on selected points and analogs using Select check before
operate (SCBO) Sequence.

Supervisory control shall allow the SCADA system to remotely control switching
devices. A control action shall require a confirmation-of-selection-prior-to-execution
response. Initiation of the control execute step shall occur after the dispatcher
confirms that the correct point and control action have been selected.

After the dispatcher/DMS function initiates control execution, the RTU/FRTU shall
be addressed for verification that the correct point has been selected at the
RTU/FRTU and then the control action shall be executed. It shall also be possible
to reset the flag in FPI through a command.

It shall be possible to issue control commands as a group control from SCADA


where switching devices pertaining to different RTUs/FRTU or a RTU/FRTU may
be controlled as a group. The SCADA system shall send the control commands
sequentially (without dispatcher intervention), if the commands pertain to switching
devices in the same RTU/FRTU, using the Selection Check before operate

SECTION-2, CHAPTER-1 : SCADA FUNCTIONS page 14 of 17