SCADA Project Guide - 14
SCADA Project Guide - 14
The SCADA system shall have capability to write various programs using IEC
61131-3 SCADA language or C/C++ or any non proprietary language . It will
facilitate user (programmer) to write various programs/ logics using points defined
in the database .
The operator shall be able to request digital status control, set-point control and
raise/lower control on selected points and analogs using Select check before
operate (SCBO) Sequence.
Supervisory control shall allow the SCADA system to remotely control switching
devices. A control action shall require a confirmation-of-selection-prior-to-execution
response. Initiation of the control execute step shall occur after the dispatcher
confirms that the correct point and control action have been selected.
After the dispatcher/DMS function initiates control execution, the RTU/FRTU shall
be addressed for verification that the correct point has been selected at the
RTU/FRTU and then the control action shall be executed. It shall also be possible
to reset the flag in FPI through a command.