This construction drawing document provides details for a proposed 4-story twin office building development on Lots 520 and 521 in Mukim 7, Seberang Perai, Pulau Pinang, Malaysia. The drawing includes information on the owner, architect, consultants, contractor, project title, scale, and was drawn by Mohamad Fitri, checked by IR. Ahmad Salleh, with a scale of 1:200 and date of April 2020.

Uploaded by

nuraisyahyunos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views1 page

Detailing Pile Cap

This construction drawing document provides details for a proposed 4-story twin office building development on Lots 520 and 521 in Mukim 7, Seberang Perai, Pulau Pinang, Malaysia. The drawing includes information on the owner, architect, consultants, contractor, project title, scale, and was drawn by Mohamad Fitri, checked by IR. Ahmad Salleh, with a scale of 1:200 and date of April 2020.

Uploaded by

nuraisyahyunos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PRODUCED BY AN AUTODESK STUDENT VERSION

CONSTRUCTION
DRAWING

OWNER :

ARCHITECT :

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

C&S CONSULTANT :

MAIN CONTRACTOR :

QS CONSULTANT :

M&E CONSULTANT :

PROJECT TITLE:

CADANGAN MEMBINA PEJABAT


BERKEMBAR 4 TINGKAT DI ATAS LOT 520
DAN 521, MUKIM 7, DAERAH SEBERANG
PERAI, PULAU PINANG

SUBJECT:

DRAWN BY Mohamad Fitri

CHECKED BY IR. Ahmad

SCALE 1 : 200

DATE April 2020

JOB NO. 4SO/2020

DWG. NO.