Impact Management Questions

An environmental management plan (EMP) is a core part of impact management and should include mitigation, monitoring, implementation schedule and cost estimates, and contingency plans. Impact management plans are often compulsory. A key step in developing an EMP is not reviewing EIA legislation in different countries but rather describing recommended mitigation measures. A contingency plan is a plan of actions to prevent and respond to emergencies. In Honduras, an EMP is only requested for projects categorized as high impact.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
245 views1 page

Impact Management Questions

An environmental management plan (EMP) is a core part of impact management and should include mitigation, monitoring, implementation schedule and cost estimates, and contingency plans. Impact management plans are often compulsory. A key step in developing an EMP is not reviewing EIA legislation in different countries but rather describing recommended mitigation measures. A contingency plan is a plan of actions to prevent and respond to emergencies. In Honduras, an EMP is only requested for projects categorized as high impact.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Impact Management questions

5.1 A core part of Impact Management is developing an EMP – environmental management plan.
Please indicate which items from the list below are contents of the EMP (select all that apply)
a. Mitigation
b. Monitoring
c. Capacity Development
d. Implementation Schedule and Cost Estimates
e. Contingency plans
f. TOR

5.2 True or False? Impact Management plans are often compulsory.

5.3 What is NOT a key step in developing an EMP?


a. Summary of the potential impacts of the proposal.
b. A review of EIA legislation in 5 different countries
c. Description of the recommended mitigation measures.
d. Statement of their compliance with relevant standards.
e. Allocation of resources and responsibilities for plan implementation.
f. Schedule of the actions to be taken.
g. Program for monitoring and auditing.

5.4 What is a contingency plan? (select the best answer)


a. A set of guidelines ensuring that the development project will remain within its boundaries.
b. A plan of actions to prevent an emergency and to be taken when emergencies occur.
c. A plan describing the measures that will be taken to contain or treat any waste produced by
the development project.

5.5 True or False? In Honduras, an EMP is only requested for project in category 4 (High impact).

EIA Report questions

6.1 What specific aspects does a good EIA report and review include? (select all that apply)
a. Assessment, mitigation measures and related plans
b. A terms of reference (TOR)
c. A generalized set of assumptions about the project benefits described in highly technical
terms.
d. A satisfactory prediction of the adverse effects of proposed actions and their mitigation
using conventional and customized techniques.
e. Information that is helpful and relevant to decision making.