Rehabilitation of GGPS Sangina Uper Kurram District
Rehabilitation of GGPS Sangina Uper Kurram District
Rehabilitation of GGPS Sangina Uper Kurram District
Electrification 55,172
2 ROOF TREATMENT
Second class tile roofing consisting of 4"
earth and 09--02
1" mud plaster with gobri leeping etc
infront of
Sft rooms
block
infront of
Cft rooms
block
Cft 2.52947 1106.643125
around pcc
Tuff tile
infront of
sft rooms
block
S# Description Ref: MRS 19 Length Width Depth/ Height Estimated Quantity Unit Unit Rate Estimated Cost (PKR) Remarks
Excavation in foundation
1 of building, bridges etc 03-25-d 4.00 3.00 0.75 9.00 Cft 9.29 83.63
complete : in
Plain Cement Concrete
shingle/gravel
including placing,
2 compacting, finishing & 06-05-i 4.00 3.00 0.75 9.00 Cft 180.07 1620.61
curing (Ratio 1:4:8)
Total 21408.91
Rehabilitation of GGPS Sangina uper kurram District
Bill of Quantities of Washing Pad
Sub Head mRS 2019 Nomenclature Description Reference L B D/H
No. Location Ft Ft Ft
Excavation in
foundation of
building, bridges etc
complete : in Excavation
1 03-25-d shingle/gravel for 7 5.67 0.83
Foundation
Plain Cement
Concrete including PCC (1:3:6)
4 06-05-h placing, compacting, 7 5 0.33
finishing & Curing 4" thick
(Ratio 1:3:6)
Marble Tile
(Trevera) Front 7 8.25 Perimeter
1 57.75 Sft
2 7.08 Sft
2 3.75 Sft
2 0.75 Sft
69.33 Sft
6.93 Sft
44,904.85
GGPS Sameer
BOQ: New Latrine b
Ref: MRS Length
S# Description Width (ft)
19 (ft)
1 Cement plastring 1:4 upto 20' height 1/2" thick 11-09-b
Both wash room Long Wall and short wall Lum sam 200
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
3 Cement Pointing Struck joints, on wall upto 20' height: Rati 11-18-b
Long Wall 12.25 0
Short Wall 6.5 0
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
11-21-b-
Distempering Old surface : Two coats 02
4
Long Wall (intrernal ) 5
Short Wall (internal) 5
Roof 5 5
Deduction
Doors 2.5 0
Ventilators 1.5 0
Total
Total Estimated Cost (PKR)
GGPS Sameer
BOQ: New Latrine block
Estimated Estimated Cost
Depth (ft) No Unit Unit Rate
Quantity (PKR)
200 Sft
Sft
Sft
200 Sft 27.6369 5527.38
9 2 220.5 Sft
9 2 117 Sft
Total 338 Sft
Sft
7 2 35 Sft
1.5 2 4.5 Sft
39.5 Sft
298 Sft 28.45 8478.1
9 2 221 Sft
9 2 117 Sft
Total 338 Sft
7 2 35 Sft
1.5 2 5 Sft
40 Sft
298 Sft 29.21 8704.58
3 4 60 Sft
3 4 60 Sft
2 50 Sft
Total 170 Sft
Sft
7 2 35 Sft
1.5 2 5 Sft
40 Sft
131 Sft 4.3 561.15
ed Cost (PKR) 23271.21
Remarks
Around plaster
*
GGPS Sameer
Bill of Quantities of sanitation fixtures
S# Description Ref: MRS 19 Estimated Quantity Unit
Providing and Fixing CP soap
1 dish. 14-13 2 Each
Providing and Fixing glazed
earthen ware low down
2 flushing cistern 3 gallons 14-10-a 2 Each
capacity : White
Total
Supply and fixing of 1.0 HP Monoblock water pump 1.25"x1" single phase upto 88 ft head (Type DE-S2) i/c all acce
on fixtures
Unit Rate Estimated Cost (PKR) Remarks
836.1 1672.26
3238.4 6476.80
49.6 15872.00
331.9 39826.80
18271.0 18271.00
32217.9 32217.85
17377.0 17376.96
50000.0 50000.00
181713.67
Room 2
Room1 Verandah
Proposed
flag post
Main Gate
kurram District
Toilet block
Washing
Pad