CPM and Balanced Scorecard With SAP: Dr. Marco Sisfontes-Monge
CPM and Balanced Scorecard With SAP: Dr. Marco Sisfontes-Monge
Bonn 폷 Boston
085.book Seite 5 Freitag, 3. November 2006 10:13 10
Contents at a Glance
Foreword ............................................................................ 13
Acknowledgments ............................................................. 15
Contents
Foreword ................................................................................................. 13
Acknowledgments .................................................................................... 15
7
085.book Seite 8 Freitag, 3. November 2006 10:13 10
Contents
8
085.book Seite 9 Freitag, 3. November 2006 10:13 10
Contents
9
085.book Seite 10 Freitag, 3. November 2006 10:13 10
Contents
10
085.book Seite 11 Freitag, 3. November 2006 10:13 10
Contents
11
085.book Seite 37 Freitag, 3. November 2006 10:13 10
Using the foundations developed at Analog Devices (ADI) and with the
improvements created by Norton and Kaplan (1996), SAP combines this
knowledge into a powerful tool that links the theoretical and practical imple-
mentation of a Balanced Scorecard with SAP CPM. This chapter explores the
basic functionalities available in CPM.
Companies are complex systems; therefore, managers can lose focus on the
basic strategy of the company and fail to create value for its customers, share-
holder, and its employees. Similarly, having an integrated computer system
that controls and supports management to simplify the collection of infor-
mation of key processes is a very valuable tool.
37
085.book Seite 38 Freitag, 3. November 2006 10:13 10
Ultimately, every SAP project has allocated resources, time frames, require-
ments, and managers that want results at the end. This is the purpose of the
initial Blueprint and the Project Management meetings, to make sure that
those expectations are achieved and maintained.
Both the Managerial and Systems approaches are required in SAP CPM to
configure the system and it also guarantees that the different SAP projects
deliver real benefits to the company. SAP CPM supports high-level decision
making to provide tools to reduce the pressures coming from outside and
inside the company. The use of the BSC helps to provide the required strate-
gic focus and control.
How do you, as a manager, see the forest for the trees? How should you
ensure that there is continuous improvement in your products and pro-
cesses? How do you balance this improvement while maintaining profitabil-
ity in your global operations, with satisfied employees and customers and
with stakeholder confidence in long-term earnings?
38
085.book Seite 39 Freitag, 3. November 2006 10:13 10
SAP R/3 and all its components guarantee that information flow inside and
outside the corporation runs smoothly and that there are no holes that com-
promise financial reports, budgets and strategic planning. SAP CPM
addresses these needs with the integration of the SAP platform with Strategic
and Performance Management with multiple tools to support the process of
translating strategy into action.
Some of the pressures that a company is exposed are analyzed in Figure 3.1.
In Figure 3.1, SAP is at the center of the organization providing information
to fulfill all external and internal pressures to satisfy different entities inside
and outside the company.
In this way, SAP CPM gives the direction to where all the SAP architecture
has to be directed based on the managerial insights coming from top-level
management. All the factors shown in Figure 3.1 are general and can be con-
sidered as the main elements that drive the performance of any multina-
tional corporation.
Financial Responsibility
(Sarbanes-Oxley)
Strategic Planning
The SAP platform is continually exposed to all these factors shown in Figure
3.1, and they affect the new requirements and satisfaction of Management
with the resources allocated, information, and data generated from the dif-
39
085.book Seite 40 Freitag, 3. November 2006 10:13 10
ferent SAP systems in the long run. Strategy and Performance Measurement
direct the development of the SAP platforms inside the organization, and all
its factors continuously influence the new requirements.
SAP CPM requires not only technical but also managerial expertise and a
broad knowledge of the company’s core processes to deliver value and sup-
port the strategic processes. All these efforts are driven by a coordinated and
organized Strategic and Performance Measurement System using the Bal-
anced Scorecard.
Let us look at the Systems Approach that was referred to in Section 3.1. This
approach reveals the tools available to managers to achieve strategic results
as long as corporations have implemented an efficient and realistic process
that translates the strategy into action inside with the appropriate leadership,
resources, and technology levels.
Strategic Results
STRATEGY IMPLEMENTATION
Strategic SAP Platform
HR Integration
HR Integration
40
085.book Seite 41 Freitag, 3. November 2006 10:13 10
The strategic structure of the SAP CPM platform allows any organization to
achieve the results in the upper section of Figure 3.2, as long as the imple-
mentation was been correctly coordinated and supported by top manage-
ment. The Balanced Scorecard process is a mature and high-level managerial
tool that can support the long-term and short-term goals of any organization.
Remember that the SAP CPM functionalities and the BSC by itself do not
guarantee the millions of dollars in cost reductions that every manager
expects with almost no resources!
The underlying strategic process behind SAP CPM determines how an orga-
nization creates, controls and achieves strategies, objectives, and measures
that manage its core competencies. However, tools by themselves do not
generate the strategic results displayed in Figure 3.2, only the way that a
company utilizes these tools to improve the strategic feedback and continu-
ous improvement is how results are generated.
Some of the key tools that are explored within the present textbook are
shown in Figure 3.2 such as the Value Tree, Strategy Maps using the Strategy
Builder, Measure Builder to identify and establish relationships of specific
performance drivers that affect the organization at different levels, and the
Balanced Scorecard and Management Cockpit to present information and
provide a feedback system to monitor and determine the key processes in
the organization rapidly.
Note that SAP CPM will support the decision-making processes with a struc-
tured and well-defined platform to deliver strategic information with clear
assigned responsibilities and during specifics time frames.
In the next section, we will review in more detail the Strategy and Perfor-
mance Measurement modules that integrate SAP CPM, and they are the core
components to either implement the Balanced Scorecard or the Management
Cockpit.
41
085.book Seite 42 Freitag, 3. November 2006 10:13 10
The Strategy Management module is where the BSC elements are created
and displayed as shown in Figure 3.4. It consists of 10 objects or submenus
that allow you to access different configuration and presentation screens to
create a Balanced Scorecard framework. However, depending on your role in
the implementation and the level of authorization granted by your system
administrator, it is possible that not all the objects displayed in Figure 3.4 are
available to you.
42
085.book Seite 43 Freitag, 3. November 2006 10:13 10
The Balanced Scorecard Launchpad and the Balanced Scorecard Wizard pro-
vide a web-oriented application to create and display the same functional-
ities as the Graphical User Interface (GUI) environment. This book focuses
on use of the GUI functionalities rather than reviewing the SAP Web Appli-
cation Server (WAS), since both provide similar capabilities. Figure 3.5 gives
a brief overview of the contents of the Balanced Scorecard Wizard.
MyBalanced Scorecard
MyBalanced Scorecard is essentially an object that defines a default view.
This object accesses the SAP CPM presentation mode inside the GUI environ-
43
085.book Seite 44 Freitag, 3. November 2006 10:13 10
ment, and allows the user to predefine a default view of a Scorecard. This
functionality allows establishing a link or a shortcut to a particular Scorecard,
so every time the user clicks on MyBalanced Scorecard object the selected
Scorecard view is displayed automatically without the need of performing
any type of navigation or additional steps.
This functionality is quite useful for a user who would simply like to display
the Scorecard that he or she is involved to improve or maintain. In compar-
ison, the object Balanced Scorecard provides a similar environment to
MyBalanced Scorecard, but does not display the default view and additional
navigation steps are required.
Objective
Measure
Perspective
Figure 3.6 MyBalanced Scorecard View for Demo Scorecard PC4YOU Group
As seen in Figure 3.6, the screen presented can be used to display informa-
tion related to strategies, goals, measures, graphic status of budget and quar-
terly reported measures, and much more. Feel free to navigate and get famil-
iar with the environment. For example, if you have an IDES platform
available, follow these steps:
44
085.book Seite 45 Freitag, 3. November 2006 10:13 10
Review other examples available in your SAP CPM system that have similar
characteristics to this Scorecard. If you do not have access to the SAP IDES
demo platform, simply reviewing the screen of Figure 3.7 should be suffi-
ciently clear, as you will be creating something similar in Chapter 4.
4
2
45
085.book Seite 46 Freitag, 3. November 2006 10:13 10
Now suppose the display settings for the chart available in Figure 3.7 have to
be displayed in another chart type such as Bar or Columns chart that was cre-
ated for this particular measure and it is available to be selected by the user.
For this let us say that we want to see another chart previously configured in
our measure in the PC4YOUGROUP Scorecard. Follow these steps to review
and display any additional charts available for a measure:
1. Go to the Graphic List seen in Step 1, Figure 3.7.
2. Select the second chart available in the measure seen in Step 2.
3. The new chart should be displayed on your screen, and depending on the
type selected or configured, the complete data set displayed in Step 3 is
also graphed.
4. Review the new chart, if any, on your screen, Step 4.
Figure 3.7 showed how the information displayed in a Measure can be cus-
tomized to meet more advanced graphic requirements and provide a clear
overview of the measure, its status, score, and values during a selected time
frame. It is also possible to attach BW Reports, Planning Layouts, Value
Driver Trees, and Measure Trees depending on the function of the measure
and its interaction with other structures.
Note
It is important to recognize the different menu options within any complete Score-
card. These menus are displayed on the top of Figure 3.7. Take your time to navi-
gate and understand the differences and functionalities for each of them.
The functionalities for each of the above menus are described in more detail
in the sub-sections that follow.
Views
These buttons allow you to move within the available views with two
options: previous and next. To save a view, simply click on the Views menu
on the SAP window as shown in Figure 3.8, and select Save View. Follow the
options and save the view as Display View for Presentation. Now go back to
the Views menu, and select Choose View to see any previously saved views
and the one we just created. To navigate between views, simply use the icons
or go to Views in the SAP menu:
46
085.book Seite 47 Freitag, 3. November 2006 10:13 10
3. Click the check mark icon to display it, as shown in Figure 3.8 Step 3.
4. Review the created view and note that the left-hand side columns that
display the Scorecard list are hidden, as shown in Figure 3.9.
To retrieve this information again, simply click on the Show Hierarchy but-
ton, shown on the top of the Balanced Scorecard structure as shown in Fig-
ure 3.9.
Finally use the Maintain Views option from the View menu to explore the
settings of the view and/or modify its order, rename, and delete the view.
47
085.book Seite 48 Freitag, 3. November 2006 10:13 10
Overview
Click on the Show Hierarchy button to reset the Scorecard to its standard
display view as shown in Figure 3.10. In other words, this view can be con-
sidered as the home menu of this screen.
Analysis
This button allows the user to access the window shown in Figure 3.11. With
this option, the information stored in the value fields such as Trend, Assess-
ment, Score, From, To, and others, that can be analyzed based on their status
using colors.
These graphic indicators become quite useful when many measures and val-
ues have to be analyzed and compared. For example, the trend indicator
linked to a value field is displayed based on the variation in time within a
predefined range. It can quickly provide information to the user if the values
are increasing, decreasing, or constant.
48
085.book Seite 49 Freitag, 3. November 2006 10:13 10
Scorecard
Drilldown
Filters
Colors
describe its
Status &
Score
Information
Cause-Effect Chain
This menu performs exactly what its name stands for, Cause-Effect Analysis
over a Scorecard structure. In comparison with the previous menu, Figure
3.12 provides a detailed view of the relationships between Perspectives,
Objectives, Triggering Objectives, and their Status.
49
085.book Seite 50 Freitag, 3. November 2006 10:13 10
Drilldown
This menu provides the drilldown functionality applied to the Scorecard ele-
ments. As shown in Figure 3.13, the drilldown menu has different options to
display the information contained in a Scorecard.
If the object does not have a previously defined Scorecard structure associ-
ated with it, an error message appears. This drilldown functionality is basi-
cally navigation between different levels of the Scorecard. For example, the
drilldown between Scorecard A and Scorecard B is only possible as long as
they are linked with a hierarchy.
In another example, if there are two measures A and B, the drilldown func-
tionality does not provide a link between measures only between structures.
To display such type of information the Measure Tree or Value Driver Tree
can deliver these requirements.
For now, choose the PC4YOU Group Scorecard to perform Drilldown Anal-
ysis. Select Percentage of Employee with Accounting Degree and perform
the drilldown based on strategies as shown in Figure 3.14.
Drilldown based
on Strategies
50
085.book Seite 51 Freitag, 3. November 2006 10:13 10
Scorecard Comparison
This menu produces exactly what the name implies: it compares different
Scorecards. When performing this functionality, the different elements and
value fields from one Scorecard are displayed and can be compared with
those of another one. It is quite useful for creating Scorecards and for bench-
marking purposes, derived Scorecards, or simply identifying differences
between two or more Scorecard structures.
Let us review the IDES Scorecard PC4YOU Group. We’ll add a comparison
between this structure and Strategic Business Unit Hardware, a structure at a
lower level, as shown in Figure 3.15. The additional Scorecard is added as a
column next to our current PC4YOU Group Scorecard as shown in Figure
3.15, and the displayed information can be controlled by using a drilldown
operation as shown in Step 1 in the same figure. This drilldown operation
allows navigation within any Scorecards related to a higher-level Scorecard,
depending on the level of aggregation.
In addition, the Period shown in Step 2 in Figure 3.15 controls the time
frames displayed for both Scorecards, and allows the user to restrict the
information for a particular time period. However, this comparison can be
performed only as long as the Scorecards to be analyzed have the same fiscal
year variant information, which is set up at the Scorecard level in the settings
options.
Figure 3.15 shows a typical screen for the Scorecard Comparison, and
reviews how the Status Indicators (color items) reflect the value based on
predefined criteria inside each of the Scorecards. Also, this information accu-
rately reflects the status and values of the data values extracted from each
DataSource for each Measure. For a Scorecard Comparison you need to per-
form the following steps seen in Figure 3.16.
Figure 3.15 Scorecard Comparison for PC4YOU Group and Strategic Business Unit Hardware
51
085.book Seite 52 Freitag, 3. November 2006 10:13 10
1
2
Perform the same procedure to add any Scorecard to the screen, and com-
pare it with another one. Other icons available on this screen are simplified
in Figure 3.17. In addition, the Status/Score button changes the displayed
values based on the specific criteria to display either the Status or the value
of the Score associated with each element of the Scorecard.
Display Options
52
085.book Seite 53 Freitag, 3. November 2006 10:13 10
Status
The status/score icon simply changes the display of the data values from one
to the other. For example, Figures 3.18 and 3.19 provide the same informa-
tion with either status or score data. The Score values simply show the
results that caused the Status (graphic indicator) to appear with the desig-
nated color.
Score
Note
For each Scorecard the detail is shown based on the Display option Perspec-
tive/Measure, presenting each Perspective and the number of measures associ-
ated to each Scorecard underneath to Perform the comparison based on Status.
Not all Scorecards have the same Measure, but information is shown indepen-
dently for each Measure as seen in Figure 3.20.
53
085.book Seite 54 Freitag, 3. November 2006 10:13 10
Now that the important aspects of the MyBalanced Scorecard menu have
been covered, let’s examine this important question. Why is there a MyBal-
anced Scorecard and a Balanced Scorecard option in the Strategy Manage-
ment menu? The answer is simple: The MyBalanced Scorecard menu allows
you to select one of the created views and make it a default.
With this default view in place, every time you click on MyBalanced Score-
card, in the Strategy Management menu, the displayed information main-
tains the standard view. This functionality is quite useful especially in the
Production Environment when a manager simply needs to quickly navigate
and review the status of specific parts of the Scorecard and nothing else.
3. Now, having a default view does not mean that the other views are
unavailable. Use the previous and next icons shown in Step 3 in Figure
3.21 to move between Views, or simply go to the Views menu, and select
54
085.book Seite 55 Freitag, 3. November 2006 10:13 10
Choose View to specifically access a View’s name. Use the Maintain View
option in the Views menu to manage and delete any unwanted informa-
tion.
4. The screen displayed in Figure 3.22 is displayed, so you can save the cur-
rent screen as a View, and to give it a name.
5. Select the check box as shown in Figure 3.22 to assign the view as the Per-
sonal Default View for MyBalanced Scorecard. (The next time you access
MyBalanced Scorecard, this default is displayed.)
6. Save the View, and try it out to see the results.
Balanced Scorecard
In comparison with MyBalanced Scorecard, this menu has the same options,
with one difference: there is no Default View.
55
085.book Seite 56 Freitag, 3. November 2006 10:13 10
Strategy Templates
CPM provides a list of available templates that can be used as a reference to
develop similar Scorecards, or as reference for finding measures and their
definition to integrate them with new Scorecards. To access the Strategy
Templates simply select the object with the same name as shown in Figure
3.23 from the Strategy Management menu.
After double clicking on the Strategy Templates object shown in Figure 3.23,
a list of Business Content or predefined SAP material is available with infor-
mation for different industrial sectors to guide and support any implementa-
tion. For example, identify the following information inside the Strategy
Template: Chemical Industry 폷 Innovation 폷 Base Strategy 1 Innovation.
Then click on Details on the upper part of the screen as shown in steps 1 and
2 in Figure 3.24
After accessing the Details menu in Figure 3.24 there is an extensive expla-
nation of Strategy 1. Use the Business Content to support any similar proc-
esses inside your company, or add this information into your Scorecard
structures and modify it.
Review with more detail the measures associated with the selected strategy
in Figure 3.24 and note that the Measure can be executed by clicking on the
icon shown in Figure 3.25 to access the information related to the measure
coming directly from the Measure Builder, to be reviewed in Chapter 4.
56
085.book Seite 57 Freitag, 3. November 2006 10:13 10
Execute
Button
57
085.book Seite 58 Freitag, 3. November 2006 10:13 10
Now, let us execute the selected Measure by clicking on the clock icon as
seen in Figure 3.25, and review the information presented in Figure 3.27.
Notice that the Measure is contained in a SAP Measure Catalog delivered as
part of the SAP Business Content. A Measure Catalog describes and groups
the different measures with a common classification, and works similarly as
a Scorecard Hierarchy. The Measure Catalog can be considered to be the
center of SAP CPM, and without a good definition of measures and catalogs,
there is no data. It is impossible for SAP CPM to function without Measure
Catalogs and this topic is extensively discussed and reviewed in Chapter 4.
1: SAP Measure
Catalog
3: Measure
Configuration
2: Measure
58
085.book Seite 59 Freitag, 3. November 2006 10:13 10
Now, let us suppose that the Economic Profit Measure contained in the SAP
Business Content Catalog has to be transferred to a real Scorecard. In this
case, go back to the original Strategy Templates window and perform the
following steps:
1. Select the Strategy that contains the measure of interest. In this case, the
measure Economic Profit is included in Strategy 1 (Figure 3.28, Step 1).
2. Click on the Activate button located at the top of the window as shown in
Step 2 in Figure 3.28.
3. The window in Figure 3.29 prompts you to select or create a Target Score-
card that will receive the information contained in the Measure for a given
Layout Period.
4. If you know which Scorecard to assign the Measure to, simply select the
icon shown in Figure 3.29 to find the required object. Otherwise, the
Measure appears to be unassigned in the Measure Builder and you can
return later on to correct it.
Select a
Scorecard
Figure 3.29 Identifying the Target Scorecard for SAP Business Content
59
085.book Seite 60 Freitag, 3. November 2006 10:13 10
Activate your
Measure
Select your
Measure here
8. Click on the Activate button located on the top of the screen in Figure
3.30, to transfer the measure to the selected Scorecard PC4YOUGROUP.
9. Confirm the selections on the screen.
10. The screen called Selection for Activation appears and selects all the
checkboxes available. Click on the Execute icon, represented by the clock
with a check mark, and move to the next step.
11. The system prompts you for the definition of a Customizing Request to
move the objects from SAP Business Content into the new location in a
real Balanced Scorecard structure as shown in Figure 3.31.
2: Accept the
Customizing Request
1: Create
60
085.book Seite 61 Freitag, 3. November 2006 10:13 10
12. Click on the create icon or the icon on the left-side of the Own Request
button, to generate the request and click on the check mark icon to con-
tinue.
13. The system prompts you with the screen shown in Figure 3.32 to notify
you that Activation Completed.
Transferred SAP
Measure
16. Ensure the Period layout selected in Figure 3.33 includes the created
time frame when choosing the Scorecard.
Finally, with all these steps you will have successfully transferred SAP Busi-
ness Content delivered with SAP CPM in the Strategy Templates to be part of
any of your selected Scorecards. Now, the big challenge lies in reviewing if
your data, structures, and architectures have been constructed correctly and
without errors that compromise the performance of your different objects.
61
085.book Seite 62 Freitag, 3. November 2006 10:13 10
For this, SAP CPM delivers the Balanced Scorecard Monitor in the Strategy
Management module as the main component to perform validations and
revisions over your complete Scorecard components and the data being
extracted from SAP BW.
왘 Checking if different users have set the Status for their Scorecard elements
correctly.
왘 Reviewing if the Assessments have been entered for the Scorecard ele-
ments.
왘 Checking if the Score values fall above or below the specified limits.
왘 Listing Scorecard elements with a manually set status.
왘 Automatic email to the person responsible of the Scorecard element.
왘 Automatic insertion of tasks in the task list.
왘 Scheduling BW data to be entered into the buffer as a background job.
Risk Catalogs
Risk Catalogs perform a similar job as the Measure Builder, discussed in
Chapter 4, but are specifically created for the Risk Management module. The
Risk Catalog is the place where risk measures are created, managed, and inte-
grated into the Scorecard.
62
085.book Seite 63 Freitag, 3. November 2006 10:13 10
The Value Driver Tree provides a similar functionality to that given by the
Balanced Scorecard Launchpad, since it also runs in the Web Application
Server (WAS) environment. However, this application can also be accessed
in the Strategy Management 폷 Value Driver Tree Design menu using the GUI
Environment.
63
085.book Seite 64 Freitag, 3. November 2006 10:13 10
The Value Driver Tree is a sophisticated tool available in SAP CPM, and must
only be used for advanced implementations of the module when complex
cause-effect relationships of the measures need to be identified and quanti-
fied.
Design
The design screen is where everything happens, meaning this is where each
of the Scorecard elements are created, configured, and assigned to different
objects. From a SAP CPM stand point, the Design screen shown in Figure
3.36 is the center of the Balanced Scorecard configuration and provides a
quick overview of the main components involved in the creation of a Bal-
anced Scorecard object. However, for purposes of this book only the major
components of SAP CPM are reviewed. I will leave it up to you to further
explore it later.
64
085.book Seite 65 Freitag, 3. November 2006 10:13 10
65
085.book Seite 66 Freitag, 3. November 2006 10:13 10
The main difference between the Management Cockpit and the Balanced
Scorecard (BSC) is the level of flexibility. While the BSC needs different
architecture the same is not true for the Management Cockpit, as it is more
structured and maintains the traditional approaches developed by Norton
and Kaplan (1996).
Management Cockpit
The Management Cockpit is the GUI presentation environment that shows
the information of the activated and ready-for-presentation Cockpits. Figure
3.37 presents a general overview of the Management Cockpit presentation
environment, and notice on the left-hand side of the screen the Cockpit List.
The Cockpit List displays the different Cockpit Hierarchies previously created
in the Design component of the Management Cockpit menu. The Cockpit List
displays those cockpits that have been activated and are ready for presenta-
tion. For example, let us select the PC4YOU Cockpit if you are using the IDES
platform and double-click on its name or any available cockpit in your system.
66
085.book Seite 67 Freitag, 3. November 2006 10:13 10
Active Cockpits
Figure 3.38 displays Walls, Logical Views, and the Frames, which are the
Charts, Links, and/or Documentation, inside the Logical Views. This infor-
mation is discussed in detail in Chapter 6.
67
085.book Seite 68 Freitag, 3. November 2006 10:13 10
Both procedures access the same object: Measure Builder. There is no differ-
ence between accessing the Measure Builder in the Strategy Management 폷
Design or in the Performance Measurement 폷 Design menu, because it is
simply the same object but with different names.
As shown in Figure 3.40, The Measure Builder is the core component of SAP
CPM. Without a correct configuration of the Measure Catalogs, BEx Queries,
and DataSources there is simply no data.
68
085.book Seite 69 Freitag, 3. November 2006 10:13 10
Measures
Data Sources
BEx Queries
To analyze a cockpit in the Cockpit Monitor follow these steps based on Fig-
ures 3.41 and 3.42:
69
085.book Seite 70 Freitag, 3. November 2006 10:13 10
1 4
Figure 3.42 Final Output for the BW Data Availability Check (No Errors Found)
70
085.book Seite 71 Freitag, 3. November 2006 10:13 10
Identify any possible errors or problems in the cockpit components for the
selected period. Figure 3.42 displays that there are no errors in the system
and thus every single component must have a green indicator next to its
name. Otherwise, any errors in the structures for a particular time period are
displayed as shown in Figure 3.43.
1. Measure 2. Problem!
Figure 3.43 Final Output for BW Data Availability Check (Errors Identified)
Based on Figure 3.43, the Cockpit Monitor identified that there was a prob-
lem with the measure Net Sales Monthly for the Period 006/2005. By dou-
ble-clicking on the Measure Net Sales Monthly and reviewing the screen dis-
played in Figure 3.43, the system prompts a message box that describes the
problem as No Value. In other words, there are no values for the SAP BW
data extracted for the selected measure in this particular period.
Design
The Design menu in the Performance Measurement 폷 Management Cockpit
is as important as the one in the Strategy Management module and is shown
in Figure 3.44. This is where the actual cockpits elements are created, config-
ured, integrated, and released for presentation.
The most important part of the structure is the object Management Cockpit
Design 폷 Management Cockpit which is the initial area for cockpit creation
and definition. Figure 3.44 shows the initial screen of Performance Mea-
surement 폷 Design. The major components of this are reviewed in Chapter 6.
71
085.book Seite 72 Freitag, 3. November 2006 10:13 10
With this complete review of the major components of the two modules of
SAP CPM, Strategy Management and Performance Measurement, it is possi-
ble to extract additional information from other SAP systems such as FI, CO,
BW, and perform additional operations. These elements are briefly discussed
in the following sections to provide a general overview of additional consid-
erations that might impact the implementation of SAP CPM.
72
085.book Seite 73 Freitag, 3. November 2006 10:13 10
and linked to a specific measure. Now the importance of the Measure Cata-
log is much clearer, because it allows SAP CPM to interact with the rest of the
SAP platforms, including the R/3 system, using SAP BW as the source of all
data transactions.
73
085.book Seite 74 Freitag, 3. November 2006 10:13 10
However, the update routines or the frequency that the core data is run is a
major issue, especially with financial information that is time sensitive, so
make sure to consider these elements before integrating information from
MyFinancials in SAP CPM.
1
2
74
085.book Seite 75 Freitag, 3. November 2006 10:13 10
For the Management Cockpit the drilldown process has two options:
The structure presented in Figure 3.47 should be familiar since it is the de-
sign view of any Management Cockpit. The structure presented in Figure
3.48 enhances the navigation capabilities based on a set of characteristics that
the user is allowed to modify at the Frame level during Presentation Mode.
75
085.book Seite 76 Freitag, 3. November 2006 10:13 10
2 3
1
5
4
76
085.book Seite 77 Freitag, 3. November 2006 10:13 10
Summary 3.5
Step 1:
Click here
Step 2:
Drilldown
Settings
3.5 Summary
This chapter was a quick overview of the capabilities of SAP CPM. In later
chapters I will discuss how to create and implement the Balanced Scorecard
and the Management Cockpit Structures in more detail.
For now, let us assume that various managers, as well as, an implementation
team have successfully completed a blueprint that describes the overall scope
and contents of your SAP CPM project. Otherwise, I hope that someone in
the team has a clear vision of what has to be achieved and can see the
requirements as an architect, ready to build a great cathedral. Remember,
SAP CPM is not about software but about strategy, focus, communication,
planning, feedback, and an elegant design that puts the pieces together.
77
085.book Seite 383 Freitag, 3. November 2006 10:13 10
Index
A BIC 73
Blueprint 38
ABAP 249, 373 BPS 73
ABC Analysis 375 BPS layout 263
Account Model 29 BSC 21
Accounts Payable 369 Business Content 83, 105, 111
Activity Based Costing 22 Business Explorer 82
Actual Data 187 Business Intelligence 37
Administration 98 Business Planning and Simulation 35
ADP 375 BW 188, 371
Approximation 375 BW Buffer 85
Architecture 30, 371 BW Data 62, 70
ASCII 34 BW Key Figure 95, 96
Assessment 232 BW Report 46, 193
Assessment/Status 62 BW Transaction Data 45
Association 375
Attributes Tab 86, 98 C
B Cause-Effect Analysis 22, 49
Cause-Effect Chain 49
Balance Sheet 178 Cause-Effect Relationships 64
Balanced Scorecard 37, 65, 79, 81, 85, CCA 73
110, 353 Change Measure 82, 86, 92
Balanced Scorecard elements 42 Chart Editor 157, 196, 199
Balanced Scorecard Launchpad 43, 66, Charts 164
271 Chemical Industry 56
Balanced Scorecard Monitor 62, 250 Cluster 375
Balanced Scorecard process 21 Cockpit 81, 110
Balanced Scorecard Wizard 43, 265, 267 Cockpit Hierarchy 67, 157
Balanced Scorecard, Management Cock- Cockpit List 67
pit 103 Cockpit Monitor 69
Benchmark 87, 101 Cockpit Structures 159
Benchmark data 101, 102 Cockpit Transport 177
Benchmarking 98 Content Release 98
BEx 28 Control 274
BEx Analyzer 95 Control Point 369
BEx Queries 68, 275 Controlling 37
BEx Query 290 CO-PA 73
BEx Query Analyzer 96 Corporate Governance 363, 368
BEx Reports 29, 35, 72, 97, 182, 200, Corporate Performance Monitor 37
263 Corporate Scorecard 162
383
085.book Seite 384 Freitag, 3. November 2006 10:13 10
Index
384
085.book Seite 385 Freitag, 3. November 2006 10:13 10
Index
M P
Maintain Views 47 Parameters 76
Management Cockpit 34, 65, 66, 74, 81, PC4YOU Cockpit 67
85, 111, 153, 192, 216, 225, 290, 353, PC4YOU Group Scorecard 50
371, 372 PC4YOUGROUP 60
Management Cockpit Applications 85 Percent Employees with Acd. Degree 45
Management Cockpit Menu 67 Performance Commitment 269
Management Cockpit Monitor 66, 214 Performance Indicators 80
Management Cockpit Structures 77 Performance Measurement 34, 65, 74,
Management Cockpit Web Version 66 111
Managerial Approach 38 Performance Measurement Menu 68
Market Risks 230 Performance Measurement Module 66
Marketing Analysis 198 Performance Measurement System 72
Materials Management 37 Performance Measurement/Manage-
Measure 81, 90, 97, 114, 193 ment Cockpit 71, 76
Measure Builder 33, 69, 79, 81, 96, 97, Period 109
101, 106, 110, 115, 166, 225, 228, 264 Period Layout 61
Measure Catalog 58, 67, 72, 81, 82, 87, Periodization 159
89, 93, 95, 98, 101, 106, 109, 111, Perspectives 22, 25, 43, 49, 263, 372
264, 280, 283 Plan Data 187
Measure Definition 87 Planning Layouts 46
Measure Group 87, 89 Predefined Range 48
Measure Hierarchy 87 Presentation Mode 223
Measure Tree 46, 50, 263, 290 Product Category 188
Measures 26, 43, 79, 81, 159, 228, 261, Production 178
372 Project Management 38
Measures and Benchmarks 66, 68 Provider Measure 103, 105
MM 34
Monitor 274 Q
MS Windows Explorer 84
MySAP ERP Financials 73 Quality Function Deployment 24
Queries 98, 180
N
R
Net Sales 251
No Value 70 Radar Chart 207
Non-financial 80 Remote Function Call 186
Restricted Key Figures 32, 95, 97
O Restricted Measures 72
RFC Destination 193
Objectives 26, 43, 49, 79, 81, 261, 263, Risk Activities 235, 251
264, 267 Risk Analysis 232
Operand 90 Risk Assignments 234
Operating Expenses 193 Risk Catalog 233
Operating Profit 193 Risk Control 232
Operational Data Store 97 Risk Handling 232
Operative Risks 230 Risk Identification 232
Organizational Objective 261 Risk Indicators 227
385
085.book Seite 386 Freitag, 3. November 2006 10:13 10
Index
Risk Management 81, 85, 110, 225, 227 Strategy and Vision 25
Risk Management Module 372 Strategy Management 34, 62, 65, 72, 87,
Risk Management Monitor 249 111, 158, 216, 372
Risk Setting 233 Strategy Management Module 65, 71,
Risk Value Fields 235 155
Strategy Management/Design/Score-
S cards 85
Strategy Map 261, 263, 266, 271, 272,
Sales Growth 92, 95, 105 274, 291
SAP Basis 177 Structure 97
SAP Business Content 58, 60, 83, 103 Supplier Relationship Management 37
SAP BW 27, 34, 72, 85, 95, 97, 115, 184, Supply Chain Management 37, 83
233, 249, 252, 262 System Performance 29
SAP BW Reports 98 Systems Approach 40
SAP Catalog 85
SAP CPM 39, 72 T
SAP GUI 291, 353
SAP HR 72 Tachometer Chart 185
SAP Measure Catalog 105, 111, 114 Target System 180, 234, 251
SAP Platform 39 Target-Based Activities 154
SAP R/3 39, 73, 365 Technical Name 86, 176
Sarbanes-Oxley Act 38, 229, 363, 373 Time Variables 159
Scheduling BW Data 62 Top-level Support 27
Scorecard 33, 81 Transactional InfoCubes 35
Scorecard Comparison 51 Transport 176
Scorecard Hierarchy 58 Transport Organizer 179
Scorecard Structure 109 Transport Process 178
Search Button 85 Transport Request 178
Securities and Exchange Commission Triggering Objectives 49
363
Selection Criteria 168, 187 U
SEM 3.2 105
SEM 6.0 107, 108, 157 Units 98
Simulation VDT 263 URL 95, 182
Six Sigma 198 URL tab 86, 93
Stairway-Lego 29, 32
Status 49 V
Status Indicators 51
Strategic and Performance Measurement Value Driver Tree 46, 50, 64, 81, 85, 95,
System 40 98, 103, 110, 261, 263, 274, 373
Strategic Business Unit 154 Value Fields 33, 98
Strategic Effects 231 Value Type 98, 188
Strategic Feedback 23 Variable 230
Strategic Risks 230 VDT 274, 280, 291, 373
Strategy 23, 26, 43, 79, 81, 261, 263 View menu 47
Strategy and Performance Measurement
40
386
085.book Seite 387 Freitag, 3. November 2006 10:13 10
Index
387