Calfornia Bearing Ratio Test: Sample No Date of Casting Location Date of Testing Source Mdd/Omc
Calfornia Bearing Ratio Test: Sample No Date of Casting Location Date of Testing Source Mdd/Omc
Calfornia Bearing Ratio Test: Sample No Date of Casting Location Date of Testing Source Mdd/Omc
M/S Simplex Infrastructures Limited M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo Tech Consultants Pvt Ltd
Corporation Limited
Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length 20.683km) on Daboka Dimapur section(Dimapur by pass)on NH36&NH39 on EPC basis under phase -A of SARDP-NE in the State
of Nagaland
20
20
18
18
16
16
14
14
12
12
10
10
8
8
6
6
4
4
2
2
0 0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Mould No : Mould No :
CBR Value @ 2.5mm Penetration CBR Value @ 2.5mm Penetration
CBR Value @ 2.5mm Penetration CBR Value @ 2.5mm Penetration
20
CBR Value
Mould No Penetration CBR Value
18
16
14
12
10
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Penetration (mm)
Mould No :
CBR Value @ 2.5mm Penetration
CBR Value @ 2.5mm Penetration