0% found this document useful (0 votes)
29 views2 pages

Power System Analysis & Design (Lab) : Students Having The Mentioned Reg. No

Students are instructed to submit assignments for deficient CLOs by Thursday before 4 PM. Assignments should clearly mention the deficient CLO number and subject name, but not assignment number. Assignments marked for all classes should be submitted by the whole class. Assignments marked for specific registration numbers are to be submitted by those students only. The document then lists 6 CLOs with minimum percentages missing and lists registration numbers and tasks that need to be completed for each CLO.

Uploaded by

ZA IN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views2 pages

Power System Analysis & Design (Lab) : Students Having The Mentioned Reg. No

Students are instructed to submit assignments for deficient CLOs by Thursday before 4 PM. Assignments should clearly mention the deficient CLO number and subject name, but not assignment number. Assignments marked for all classes should be submitted by the whole class. Assignments marked for specific registration numbers are to be submitted by those students only. The document then lists 6 CLOs with minimum percentages missing and lists registration numbers and tasks that need to be completed for each CLO.

Uploaded by

ZA IN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Power System Analysis & Design (Lab)

Submit your respective Deficient CLO Assignment by Thursday, before 4 PM.


Clearly mention the Deficient CLO Number and Subject Name on each respective assignment
you submit.
Don’t mention Assignment Number on your submitted assignment.
Assignment regarding any CLO having marked (All Class), shall be submitted by whole class.
Assignment regarding any CLO having marked (Reg. No. X, X. X), shall be submitted by the
students having the mentioned Reg. No.

CLO 1 (Minimum 2 % missing) (Reg. No. 89, 87)


 Differentiate between single line diagram, impedance diagram and reactance diagram.
 Describe the general procedure for performing the Newton-Raphson based power flow
solution.
CLO 2 (Minimum 2 % missing) (Reg. No. 88, 77)
 Describe the requirement of short circuit analysis for stable operation of power system.
 Describe contingency analysis for a power system in relation to the short circuit analysis.
CLO 3 (Minimum 2 % missing) (Reg. No. 12, 23, 77, 83)
 Name the different software tools that can be used for performing the load flow analysis
of a power system.
 Develop an equivalent model of transmission line by using lumped parameters and
distributed parameters model.
CLO 4 (Minimum 2 % missing) (Reg. No. 67)
 Describe the general procedure for Gauss-Siedel based power flow solution
CLO 5 (Minimum 10 % missing) (Reg. No. 4, 67, 68, 53, 79, 80, 88, 89)
 Describe the individual and equipment safety requirements for low voltage, medium
voltage and high voltage levels.
 Describe the operation and importance of surge arrester and guard wire regarding the safe
operation of a power system
CLO 6 (Minimum 10 % missing) (Reg. No. 21, 67, 88, 89)
 Describe the importance of load flow analysis and short circuit analysis for a power
system
 Differentiate the bus impedance and bus admittance matrices and describe their
importance in the load flow analysis.

You might also like