0% found this document useful (0 votes)
62 views2 pages

2017 Generic Portable Powertool Quartery Check List

Cogbill Construction's portable power tool checklist details tools by brand, serial number, and inspection status. The checklist is to be completed by operators daily and reviewed by supervisors, noting any tools requiring maintenance, repair, lubrication, or replacement. Special comments and inspection dates are included.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views2 pages

2017 Generic Portable Powertool Quartery Check List

Cogbill Construction's portable power tool checklist details tools by brand, serial number, and inspection status. The checklist is to be completed by operators daily and reviewed by supervisors, noting any tools requiring maintenance, repair, lubrication, or replacement. Special comments and inspection dates are included.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Cogbill Construction, LLC (Month) 2017

Portable Power Tool Check List (Detail brand and serial number)

er

r ts
igg
y
er

pa
Tr
att

e
s/
/B

ag
ob
h

m
itc

nd

Kn

Da

ol
w

ou

iss sc

to
ys

s/

g/
Gr

i
on

e/ / D

ial

:
et

ds

By
in
/

ec
utt

id
af

os es
rd

ar

ed
flu
/S

Sp
Co

Gu

Lo lad

M
lb

rm
Off

ng

k/
ro

/B
er

ty

s
rfo

te
uc
tti

e
nt
ol

fe
/

ts

t
On

No
Da
Co

Cu

Ch
Po

Pe
To

Sa

Bi
Circular (Skill) Saw
1
2
3
4
Chop Saw
1
2
Jig Saw
1
2
Porta Band Saw
1
2
Power Metal Sheer
1
2
Portable Drill Press
1
2

Key- I: Inspected R: Replaced/Repaired M: Maintenance required L: Lubed


*Inspected by the OPERATOR at the beginning of daily operation and monitored *Supervisor will be notified of any changes the status of any item listed
Special Comments: throughout day. *Power on/ test after checklist completion.
Date: ___________________________________________________________________ Date: _______________________________________________
Date: ___________________________________________________________________ Date: _______________________________________________
Date: ___________________________________________________________________ Date: _______________________________________________
Revision By: Nicole Smith

You might also like