Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
1-bnSMPaBl¥ti rbs;dI
(Soil particle size)
dIKWCasilakMeTckMNrEdl ekIteLIgedaysarkarswkricrilrbs;silaRKwH ¬Rkanit ERkfµkMe)ar
sila)asal; ¦.
kñúgyuKsm½yfµIenH kasikSaGMBdI IedIm,IQaneTArkKuNPaBrbs;dIkñúgkareFIRV KwHsMNg;nana vaCa
ktþacaM)ac;bMput .
enAkñgú muxviCa¢emkanicdIenH karsikSaGMBIdI EbgEckecjCaeRcIntMNak;kalepSg ² Kña .
b:uEnþ CaeKalkarN_rYm KWedIm,IKNnarklT§PaBRTRTg; nigsMrutrbs;RKwH. eKEckdIecjCa 2 Rkum
epSgKña enAeBlEdleKniyayBITMhMRKab;KW³
- RkumdIRtsuH² EdlmanBBYkRKYsnigxSac ;(Coarse grain soil )
- nigRkumdIs¥itKWBYkdIl,aym:dæ nigdI\dæ (Fine soil or cohesion soil)
1-1edIm,IsikSaGMBIbnSMPaBl¥itrbs;RKab;dI eKk_EckecjCaBIrebobEdrKWsMrab; RkumdIxSac;
nigRKYs eKeRbIkERBa©gErgva (Sieve analysis) ehIyeKKNnarkPaKry rbs;RKab;dEI dleTI
(Percentage of retained) rW RCúúH(Percentage of passing)BIkERBa©gnImYy²tamrUbmnþxageRkamenH ³
m:as;EdleTIelIkERBa©g
PaKryeTI elIkERBa©g = * 100 %
m:as;srub
PaKryRCuHú BIkERBa©g = 100% - PaKryeTIelIkERBa©g
page1
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
bnÞab;mkeKykvaeTAErgtamesrIkERBa©gdUcxageRkamenH
- 9.52 mm
- 4.76 mm
- 2.00 mm
- 1.19 mm
- 0.42 mm
- 0.21 mm
- 0.105 mm
- 0.075 mm
ehIyeyIgKNnark PaKryeTI nigPaKryRCuúH(Retained total & Passing total) srubEdl
)anmkBIkar BiesaFn_ ykeTAsg;RkahVik .
]TahrN_ ³ EdlehAfaPaKryeTIsrub eyIgsegátemIlviFIsaRsþxageRkamenH ³
ebIsinenAelIkERBa©g 9.52 mm manm:as;dIeTI 50 g enaH)anesckþIfaPaKryeTIman 10 % eday
kERBa©genaHenAelIeKPaKry eTIenaHKWCaPaKryeTIsrub dUecñH PaKryRCúHsrubKW
100 % - 10 % = 90 % .
eKyklT§plEdl)anBIkarKNnaPaKryRCúHsrub eTAsg;RkahiVkEdlmanG½kSGab;ssuI Ca
G½kS log d ¬Edl d KWCaGgát;p©itrbs;RKab;dI ¦nig G½kSGredaenCaG½kSPaKryRCúHsrub .
taraglTæplErgdI³
page2
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
d 60
enAelIRkahicV enaH eKKNnarkemKuNÉkPaB Cu d10
- d 60 KWCaTMhMRKab;Edlman 60% enAkñúgRkahVc i
- d 10 KWCaTMhMRKab;Edlman 10% enAkñúgRkahVc i
karsikSaGMBIkarErgdIenH pþl;GtßRbeyaCn_ya:gxøagM dl;karvaytMélGMBKI uNPaBdI. )anesckþI
fadIEdlmanTMhMRKab;kan;EtFM ehIymanPaKryeRcIn dIenaHkan;Etmaner:ssuI þg;FM pÞúyeTAvijebIvaman
TMhMRKab;tcU l¥iteRcInenaHer:suIsþg;rbs;vakan;EtexSay .
1-2 edIm,IsikSa GMBIbnSMPaBl¥t i rbs;RkúmdIs¥it ¬dIEdlmanTMhMRKab;tUcCag 75 m ¦ eKeRbIvFi I
(Hydrometer analysis) edayeRbI ]bkrN_ müa:g eQµaHfaGIuRdÚEm:Rt (Hydrometer)
page3
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
T - xN³ry³eBlénkarBiesaFn_KitCa min
D - Ggátp ; ©itkñúgxN³énkarBiesaFn_KitCa mm
]TahrN_ ³ kñgú xN³eBl 2 mm sItuNðPaBrbs;sUluysSúgman 23,5 ºC eKvas;eXIj
R = 33 . dUecñH R' = 33 + 0,4 = 33, 4 .
enAkñgú tarag L = 10, 08 eday s = 2,70 tamsmµtikmµenaH a = 0.99 .
eyIgGacKNna)an L
DK
T
10,8
tamtarageyIgGacKNna)an K = 0,0129 D 0,0129
2
0,03mm
eyIgGacKNna)an PaKryEdlRCúH
tamtarag eday s = 2,70 a = 0,99
R = 33
Ws = 50 g
R = 0,4 - 4 + 0,7 = - 2,9
0,4 - kMENel¥ógemIlnwgEPñk
page4
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
4 - kMENvtþman Defloculent
0,7 – kMENsItuNðPaBemIlkñúgtarag
33 2,9
P% 0,99 * *100% 59.598%
50
tarag kMENsItN
u ðPaB
page5
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
emKuN a GaRs½y s
s(g/cm3) a
2.85 0.96
2.80 0.97
2.75 0.98
2.70 0.99
2.65 1.00
2.60 1.01
2.55 1.02
2.50 1.04
s(g/cm3)
T 0c
2.50
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
page6
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
R' L R' L
0 16.2 27 11.9
1 16.1 28 11.7
2 16 29 11.5
3 15.8 30 11.4
4 15.6 31 11.2
5 15.5 32 11.1
6 15.3 33 10.9
7 15.2 34 10.7
8 15 35 10.5
9 14.8 36 10.4
10 14.7 37 10.2
11 14.5 38 10.1
12 14.3 39 9.9
13 14.2 40 9.7
14 14 41 9.6
15 13.8 42 9.4
16 13.7 43 9.2
17 13.5 44 9.1
18 13.3 45 8.9
19 13.2 46 8.8
20 13 47 8.6
21 12.9 48 8.4
22 12.7 49 8.3
23 12.5 50 8.1
24 12.4 51 7.9
25 12.2 52 7.8
26 12.0 53 7.6
page7
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
;
page8
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
rUbTI2 ³kE®Ba©gErgdIxSac;
page9
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
2-smasPaBrYmpSMrbs;dI(Soil composition)
RbsinebIeyIgykdI 1 sgIÞEm:RtKYb kñúglkçx½NÐFmµCatimksikSa eyIgeXIjfa manFatubIcUl
rYmpSMKñabegáIt)anCadI KW dI Twk nig xSl; .
dUecñHmaDsrubrbs;dIKW V=V + V + V Edl V CamaDrbs;xSl;EdlmanenAkñgú Rbehag
a w s a
Air Va
Total Total
Weight= W Volume=V WwWater Vw Vv V
Vs
Ws
(a) (b)
CamYynwgmaDrbs;RKab;dIsuT§ V eKtagvaedayGkSr e .
s
Vv Vv Vw
e n S
Vs V Vv
page10
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
srubdI V eKtagedayGkSr n .
3-kMritsMeNImM (Degree of saturation)³
EdlehAfakMritsMeNImKWCapleFobrvagmaDrbs;Tkw EdlmanenAkñúg Rbehages<atdI V w
CamYynwgmaDRbehages<atdIsrub V dUecñHeKtagvaedayGkSr S .
v
viFIsaRsþBiesaFn_ ³
-ykkMbu:gmkfwøgm:as; vatageday m . 0
-ykdIeTAdak;kúñgTUrsMgYtkñúgsItuNðPaB 105 ºC / 24 h .
-ykdIEdls¶ÜtehIymkfwøgm:as;vatageday m . 2
eyIg KNnasMeNImFmµCatitamrUbmnþxageRkamenH ³
m1 m2
*100
m2 m0
page11
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
50.8 34.92 2
page12
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
edayeKGacKitva)anecjCaTMgn;maD.
eKtagvaedayGkS ³
w
¬xñatKitCa g/cm ¦3
dUecñH d = d . g ( KN/ m ) 3
vs
dUecñH s = s . g ¬xñatKitCa KN/m ¦ 3
page13
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
9- TMnak;TMngRKb;):ar:aEmRt
n
e 1 d
w
e 1
100
s d s
e
d
S
e w
¬ dg;sIuetTwk ¦
w
viFIsaRsþBiesaFn_ ³
karKNnarkdg;sIeu tdIFmµCati ³
eKykkgsILu aMgmYyEdlsÁal;maDrbs;va V eTAføwgm:as;vatageday m . ykkgsIuLaMg 0
m1 m2
V
karKNnarkdg;sIeu txniCdI : s
dIs¶Üt Twk
EkvTeT EkvbUkdIs¶Üt dI + Twk + Ekv +TwkRtwm
EkvRtwmsñam sñamRkit
Rkit
m0 m1 m2 m3
dut 1 h – 2 h
page14
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
- eKykEkvBikNUEm:RtTeTs¶Ütmkføwgm:as;tageday m 0
eKKNnarkdg;seIu t xniCdItagrUbmnþxageRkamenH³
m1 m0
s
m1 m0 m3 m2 ¬xñatKitCa g/cm )
3
emax e
.
Dr
emax emin
page15
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
viFIsaRsþBiesaFn_ ³
eKykEkvbBaÄrEdlmansñamRkit kMNt;GMBImaDrbs;vaehIyeKeraydIxSac;s¶Üt fñm²cUleTAkñúg
EkvenaH rhUtdl;maDEdleKcg;)an. eTIbeKykvaeTArkdg;seuI tdIs¶Ütkñgú krNIdIRtsuH KW . d(min)
maDEdleKemIleXIjelIEkvRkit
bnÞab;mkeKGacKNnarkemKuNes<atkñúgkrNIRtsuHbMput .
xSac;sܶt
s d (min)
2cm3 emax
d (min)
1cm3
page16
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
bgðab;
xSac;esIm 6 PaKry
s d (max)
emin
d (max)
rUbTI3³ EkvBikNUEm:Rt
page17
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
lMhat;
dImYyRbePTCadIEq¥tTwkEdlmansMeNImFmµCatiesµnI wg 25% nwg dg;suIetxnicdIesµInwg
2,70g/cm sUm KNnarkdg;sueI trbs;dIenaH .
3
cMelIy
lMhat;
enH .
page18
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
cMelIy
KNnarkdg;sIuetdIs¶Üt d = = 2
=1.786 T/m3
1
12
1
100 100
KNnarkmaDdIEdleyIgRtÚvkarsMrab;sMercnUvKMerag enH
V=Ws / d=2000/1.786=1119.82 m3
V=1119.82 m3
page19
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-karBiesaFn_rklImIténkarrYmmaD (s)
ykkUnkMb:ugtUcEdleyIgsÁal;maDrbs;vayklabeRbgxagkñúg ykvaeTAføwgm:as;tageday
m0 .
ykdIEdlRtUvBiesaFn_dak;cUleGayeBjkñúgkUnkMb:ugenaHekos mat;vaeGayesµIykvaeTAføgw
m:as; tageday m1 .
TukkUnkMbu:genaHelIxñgTUsMgYt 1 h – 2 h edIm,IeGayvarYmmaDtamsMrYleCosvagmansñam
eRbH . bnÞab;mkeKdak;vacUlkñúgTUsMgYtkñúgsItuNPð aB 105 ºC / 24 .
eyIgykkMbu:gdIecjBITUsMgYtehIyføwgm:as;vatageday m2 .
page20
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
KNnamaDdIs¶Üt Vf
m3 m4
13,6
KNnarkm:as;TwksrubkñúgdI ³ Ww = m1 – m2
KNnarkm:as;dIs¶Üt ³ Ws = m2 – m0
Ww (Vi V f ). w
KNnarklImIténkarrYmmaD ³ s *100%
Wf
Vi maDrbs;kMbu:g
-lImIténPaBs¥itrbs;dI ( p ) :
-ykdIEdlsl;BIkarBiesaFn_rk s mYykUndum M klujCakUnsuILaMgtYc² EdlmanGgátp; ©it
3 mm rhUtTal;EtvamansñameRbHsBVsac; .
-ykkMbu:gEdlmanbg;elxmkføwgm:as;tageday m0
-dak;dEI dllujrYcdak;cUlkñúgkMbu:g ykvaeTAføwgm:as;tageday m1
-ykvadak;kñúgTUsMgYt 105 ºC / 24 h .
-ykdIs¶ÜtnigkMbu:geTAføwgm:as;tageday m2 m1 m2
eyIg KNnarklImItPaBs¥it ( p ) ³ p *100%
m2 m0
page21
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-lImIténPaBravrbs;dI ( L ) :
manviFICaeRcInenAkñúg Standard epSg² KñaEdlGacGnuBaØatieGayeKrk)annUvlImItPaBrav
EtsMrab;eyIgenAkúeñ BlenH KWeyIgeRbI Standard GaemrickaMg ASTM D 423-66 . eyIgeRbI]bkrN_
eQµaHfa Casagrande KWCaRbePT]bkrN_EdlrkeXIjedayelak Casagrande . vaCaRbePTkUnxÞH
tUcmYy EdleKGacelIkTMlak;kúñgkMBs; 1Cm eTAelIeQIrgw .
ykdIEdleyIgsl;BIBei saFn_ kñúgkarrklImItTaMg2 xagelIdak;cUleTAkñúgkUnxÞHenaHRbEhl
70g ehIyeKosvaeGayesµIragCa)atxÞH kñúgkMras;RbmaNCa 12mm ¬sUmemIlrUbP¢ab;CamYy¦.
-ykdIs¶ÜtnigkMb:ugeTAføwgm:as;tageday m2
KNnarksMeNIm rbs;deI naH m m2
1 *100%
m2 m0
0 ,121
eyIgKNnarklImItPaBravrbs;deI naH N
L
25
page22
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
N=25
L
page23
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page25
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
s p L
V maDrbs;dI
G½kSsMeNIm
s p L
I p L p
KWCa):ar:aEmRtmYyEdlGacbBa¢ak;eGayeKdwg)anGMBIPaBrwg nigTn;rbs;dI
p
IL
Ip
page26
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
nigPaBrwgrbs;dIenaH
L
Ic
Ip
page27
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page28
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
60
50
Plastic index (Ip)
40
CH
30
MH
CL
20 OH
10
CL-ML ML or OL
0
0 10 20 30 40 50 60 70 80 90 100
page29
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
Cu>4
RKYssuTm§ inÉkPaB Well graded gravel GW
ML or MH
RKYslaydIl,ay Cu<4
RKYslaydIl,ayÉkPaB Uniformity silty
gravel
GM - GP
Cu>4
RKYslaydIl,ayminÉkPaB Well graded
silty gravel
GM – GW
CL or CH
RKYslaydI\dæ Cu<4
RKYslaydI\dæÉkPaB Uniformity
clayey gravel
GC – GP
5% < %P (74 m) < 12%
Cu>4
RKYslaydI\dæminÉkPaB Well graded
clayey gravel
GC – GW
RKYslayl,aydI Cu<4
RKYslayl,aydI\dæÉkPaB Uniformity
clayey silty
GC - GM –
GP
CL - ML \dæ gravel
Cu>4
RKYslayl,aydI\dæminÉk Well graded
clayey silty
GC - GM –
GW
PaB gravel
RKYslaydICIv Cu<4
RKYslaydICIvsaRsþÉkPaB Uniformity
organic gravel
GO - GP
OL or OH saRsþ Cu>4
RKYslaydICIvsaRsþminÉk Well graded
organic gravel GO - GW
PaB
ML or MH
RKYslaydIl,ay Silty gravel GM
CL or CH
RKYslaydI\dæ Clayey gravel GC
% P (74 m ) >12%
CL – ML
RKYslayl,aydI Clayey silty
gravel
GC – GM
\dæ
OL or OH
RKYslaydICIv Organic gravel GO
saRsþ
page30
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
5% Cu>6
xSac;suT§mni ÉkPaB Well graded sand SW
ML or MH
xSac;laydIl,ay Cu<6
xSac;laydIl,ayÉkPaB Uniformity silty
sand
SM - SP
Cu>6
xSac;laydIl,ayminÉkPaB Well graded
silty sand
SM – SW
xSac;laydI\dæ Cu<6
xSac;laydI\dæÉkPaB Uniformity SC – SP
5% < %P (74 m) < 12%
CL or CH clayey sand
Cu>6
xSac;laydI\dæminÉkPaB Well graded
clayey sand
SC – SW
CL - ML
xSac;layl,aydI Cu<6
xSac;layl,aydI\dæÉkPaB Uniformity
clayey silty sand
SC - SM –
SP
\dææ Cu>6
xSac;layl,aydI\dæminÉk well graded SC - SM –
clayey silty sand SW
PaB
xSac;laydICIv Cu<6
xSac;laydICIvsaRsþÉkPaB Uniformity
organic sand
SO - SP
OL or OH saRsþ Cu>6
xSac;laydICIvsaRsþminÉk Well graded
organic sand SO - SW
PaB
ML or MH
xSac;laydIl,ay Silty sand SM
CL or CH
xSac;laydI\dæ Clayey sand SC
% P (74 m ) >12%
CL – ML
xSac;layl,aydI Clayey silty
sand
SC – SM
\dæ
OL or OH
xSac;laydICIv Organic sand SO
saRsþ
page31
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
%R(0.42mm)>50%
xSac;RKab;FM Coarse sand
%R(0.21mm)>50%
xSac;RKab;mFüm Medium sand
%R(0.21mm)<50%
xSac;RKab;tUc Fine sand
sPaBhab;rbs;dIxSac;
kMritebomTwkrbs;dI
page32
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
15%<%R(0.074mm)<30%
%S > %G
dI\dæst¥i exSaylayxSac; Lean clay with
sand
%S < %G
dI\dæst¥i exSaylayRKÜs Lean clay with
gravel
%S > %G %G <15%
dI\dæst¥i exSayl,ayxSac; Sandy lean clay
CL %G >15%
dI\dæst¥i exSayl,ayxSac; Sandy lean clay
with gravel
%R(0.074mm)>30% lay RKÜs
%S <%G %S <15%
dI\dæst¥i exSayl,ayRKÜs Gravelly lean
clay
%S > 15%
dI\dæst¥i exSayl,ayRKÜs Gravelly lean
clay with sand
layxSac;
%R(0.074mm)<15%
dI\dæst¥i xøaMg Fat clay
15%<%R(0.074mm)<30%
%S > %G
dI\dæst¥i xøaMglayxSac; Fat clay with
sand
%S < %G
dI\dæst¥i xøaMglayRKÜs Fat clay with
gravel
%S > %G %G <15%
dI\dæst¥i xøaMgl,ayxSac; Sandy fat clay
CH %G >15%
dI\dæst¥i xøaMgl,ayxSac; Sandy fat clay
with gravel
%R(0.074mm)>30% lay RKÜs
%S <%G %S <15%
dI\dæst¥i xøaMgl,ayRKÜs Gravelly fat clay
%S > 15%
dI\dæst¥i xøaMgl,ayRKÜs Gravelly fat clay
with sand
layxSac;
%R(0.074mm)<15%
dIl,ays¥itxøaMg Elastic silt
15%<%R(0.074mm)<30%
%S > %G
dIl,ays¥itxøaMglayxSac; Elastic silt with
sand
%S < %G
dIl,ays¥itxøaMglay RKÜs Elastic silt with
gravel
%S > %G %G <15%
dIl,ays¥itxøaMgl,ay Sandy elastic
silt
MH xSac;
% R(0.074mm)>30% %G >15%
dIl,ays¥itxøaMgl,ay xSac; Sandy elastic
silt with gravel
lay RKÜs
%S <%G %S <15%
dIl,ays¥itxøaMgl,ay RKÜs Gravelly elastic
silt
%S > 15%
dIl,ays¥itxøaMgl,ay RKÜs Gravelly elastic
silt with sand
layxSac;
page33
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
%R(0.074mm)<15%
dIl,ays¥itexSay Silt
15%<%R(0.074mm)<30%
%S > %G
dIl,ays¥itexSaylay Silt with sand
xSac;
%S < %G
dIl,ays¥itexSaylay Silt with gravel
ML
RKÜs
%S > %G %G <15%
dIl,ays¥itexSayl,ay Sandy silt
xSac;
%R(0.074mm)>30% %G >15%
dIl,ays¥itexSayl,ay Sandy silt with
gravel
xSac; lay RKÜs
%S <%G %S <15%
dIl,ays¥itexSayl,ay Gravelly silt
RKÜs
%S > 15%
dIl,ays¥itexSayl,ay Gravelly silt with
sand
RKÜs layxSac;
%R(0.074mm)<15%
l,aydI\dæ Silty clay
15%<%R(0.074mm)<30%
%S > %G
l,aydI\dæ lay xSac; Silty clay with
sand
%S < %G
l,aydI\dæ lay RKÜs Silty clay with
gravel
%S > %G %G <15%
l,aydI\dæ l,ay xSac; Sandy silty clay
CL
%G >15%
l,aydI\dæ l,ay xSac; Sandy silty clay
with gravel
-
ML %R(0.074mm)>30% lay RKÜs
%S <%G %S <15%
l,aydI\dæ l,ay RKÜs Gravelly silty
clay
%S > 15%
l,aydI\dæ l,ay RKÜs Gravelly silty
clay with sand
layxSac;
page34
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
rbwgrbs;dIs¥it
rbwgrbs;dI Consistancy of soil
er:sIusþg;dIFn;nwgkarsgát;
bM)ak;(KPa)
RCay Very soft qu<25
page35
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
eKGacKNnark a ; b ; c ; d )anenAkñúgtaragxageRkam ³
sMrab;dEI dlman Ig kan;EttUcKWCaRbePTdIEdlmanlkçN³l¥kñúgkarbgðab; cMENkÉdIEdlman Ig
kan;EtFMKW CaRbePTdIEdlmanlkçN³bgðab;minl¥ .
sMrab;BBYkdI A-1a ; A-1b ; A3 ; A-2-4 ; A-2-5 KWCaBBYkdIEdlmanlkçN³l¥RbesIr .
cMENkÉdI A2-6 ; A2-7 ; A-4 ; A-5 ; A-6 ; A-7 ; A7-5 ; A7-6
KWCaBBYkdIEdlmanlkçN³BIGn;eTA Gn;bMput .
]TahrN_ ³ dIeyIgCaRbePT ³
% R (74m) = 38% % P (74 m ) = 100 – 38 = 62 % RkumdIs¥it
L = 28% ; p = 15% L = 28 % < 40 % RkumdIs¥itexSay
%R (2mm) = 15 % I = 13 % >10 % dI\dæs¥itexSay
p
%R (0,42mm) = 20%
page36
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
%P(2mm) <50
%P 0.074mm <15 <25 <10 <35 <35 <35 <35 >35 >35 >35 >35
page38
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page39
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
1,85
d 1,78 g / cm3
3,85
1 1
100 100
d
dmax RkaPic sat
0 opt
bnÞab;mkeKKNnarksMeNIMmEq¥tTwksMrab;Bum<nimYy² tamrUbmnþxageRkamenH ³
1 1
sat w .100%
d s
ehIyeKyktMélEdlKNnaeXIjenaHeTAedA enAelIRkaPicCamYyRkaPicxagelI .
page40
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
karbgðab;EckecjCa 5 RsTab;
kñúgmYyRsTab;eKbgðab; 55 jjÜr
jjÜrmanTMgn; 4,53 kg
sMrab;karbgðab;eKRtUvkarm:as;dsI ¶Üt EdlErgecjBIkERBa©g 19,05 mm cMnYn 5,5 kg .
cMnYnjjÜrbgðab;sMrab;1 25 25 56
RsTab;
cMnYnRsTab; EdlRtÚv 3 3 3
bgðab;
famBl bgðab; 591.3 kN-m/m3 591.3 kN-m/m3 591.3 kN-m/m3
page41
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
cMnYnjjÜrbgðab;sMrab;1 25 25 56
RsTab;
cMnYnRsTab; EdlRtÚv 5 5 5
bgðab;
famBl bgðab; 2696 kN-m/m3 2696 kN-m/m3 2696 kN-m/m3
page42
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
rUbTI5³ ]bkrN_BiesaFn_bgðab;dI
page43
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
viFIsaRsþBiesaFn_ ³
bnÞab;BITTYl)annUvtMél Optimum rbs; Proctor modified eKeFVkI arbgðab; Proctor modified
mYy eTot kñúgkMrit Optimum . bnÞab;BeI naHeKmanviFBI Ir KWeKrk C.B.R kñúgkrNIRtaMTwk KWeKykBum<
Edlbgðab;rYc eTAdak;RtaMTwk 4éf¶ 4yb; edayeKvas;PaBehImrbs;vaehIybnÞab;mkeTIbeKykvaeTAdak;
enAeRkamm:asInu sMBaF ehIyeTIbeKsgátB; enøcsIuLaMgtan; Edlmanmuxkat; 19,5 cm edayeKvas;kMlaMg
2
page44
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
P/kgf/cm2
P(5,08)
kMlaMgsMBat
P(2,54)
2,54 5,08
0 S (mm)
1 2 3 4 5 6 7
00 1 20 3 4 5 6
0
page45
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
sMrab;eFIfV ñl;TUeTA
cMNat;fñak;dI
USCS AASHTO
OH, CH, MH, CL A5, A6, A7
OH, CH, MH, OL A4, A5, A6, A7
OL, CL, ML, SC, SM, SP A2, A4, A6, A7
GM, GC, SW, SM, SP, GP A1b, A2-5, A3, A2-6
GW, GM A1a, A2-4, A3
page46
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page47
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
CM
r:UT,ÚrlIg bnÞkú efr 8 eTA 15 dg 20 eTA 25
r:ULÚekAs‘U
m:UT½rGUtmU :aTic sMBaFsþaTic 90 eTA 120 8 eTA 12 dg 15 eTA 20 65 eTA 97
TajedayRtak;T½r 450 8 eTA 12 dg 30 eTA 35 135 eTA 202
r:ULÚbgðab;edayeCIg sMBaFsþaTic 60 8 eTA 12 dg 18 eTA 20 64 eTA 96
r::ULÚmanbnøa 140 8 eTA 12 dg 20 eTA 30 74 eTA 110
bnÞHrMjr½
FunRsal sMBaFsþaTic 5 eTA 7 3 eTA 4 dg 40 eTA 50 24 eTA 31
FunF¶n; nig DINamic FMCag 17 3 eTA 4 dg 50 eTA 70 40 eTA 53
r:L:U ÚrMj½r bnÞkú sþaTic nig
Rsal DINamic 12 eTA 23 4 eTA 6 dg 30 36 eTA 54
F¶n; 30 eTA 60 4 eTA 5 dg 40 eTA 50 90 eTA 112
TajFunF¶n; 20 eTA 35 4 eTA 5 dg 40 eTA 50 100 eTA 125
F¶nb; Mput 40 eTA 80 4 eTA 5 dg 50 eTA 60 156 eTA 195
jjÜrbukbgðab; sMBaFsþaTic
m:asuInsamBaØ nig 20 eTA 30 3eTA 4 50eTA 70 23 eTA 31
m:asuInkMlaMgxøaMg karbukbgðab; 20 eTA 30 3eTA 4 50eTA 70 46 eTA 61
jjÜrbukbgðab; 5 3eTA 4 30 eTA 40 14eTA 19
edaybnÞúH 10 3eTA 4 40eTA 50 25eTA 32
page48
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
karbgðab;tamRbePTdI
kMras;RsTab;dIRtUvbgðab;
RbePTm:asiun RbePTdI
xSac; nigRKÜs dIlÆay
kMras;RsTab;dI lTæPaBbgðab; kMras;RsTab;dI lTæPaBbgðab;
3 3
Gtibrimar(M) (M /h)
Gtibrimar(M) (M /h)
bnÞHrMjr½
0.5 – 1 KN 0.15 15 - -
1 –2 KN 0.20 20 - -
4 – 5KN 0.35 35 0.25 25
6 – 9 KN 0.50 60 0.35 40
bnÞHrMjr½
0.75 KN 0.35 10 0.25 8
r:ÚLÚrlIg
8 KN 0.20 50 0.10 25
r:ÚLÚrlIg
12 - 15 KN 0.20 80 0.15 50
page49
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
EdlBiesaFn_)ankñúgmnÞIrBiesaFn_ .
100%
Field
PaKryénkarbgðab; d
d max Labo
karbgðab;KWRtUveFVIeLIg edaykMNt;[)anc,as;nUvkMras;rbs;dIEdlRtUvbgðab;
eTAtamRbePTénRsTab;fñl; nimYy² ³
taragxageRkambBa¢ak;GMBIkarcaM)ac;énkarbgðab;rbs;RsTab;nimYy²
vtßúFatu bJu CMerA - kMras;; karkinbgðab;EdlcaM)ac;
1-dIFmµCatiRKw³fñl; 90% P.M
2-dIcak;RKw³fñl;
90% P. M
page50
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
- karepÞogpÞat;tMél C.B.R
CaTUeTAeKRtUveFVI C.B.R min[ticCag 3 sMrab;kgñú karBiesaFn_nimYy² RbsinebItéM l C.B.R
mankarxusKña xøagM enaHeKRtUvBiPakSadUcxageRkamenH ³
lT§plénkarBiesaFn_ mantMélGacykCakar)anKñaluHRtaNaEt
1- C.B.R < 10 : tMélxusKñaGnuBaØatiKWesµIdl; 3
2- 10 < C.B.R < 30 : tMélxusKñaGnuBaØatiKWesµIdl; 5
page51
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
- karBiesaFn_edIm,IepÞogpÞat;
eKGaceFVIkarsikSadUcteTAenH
1-RbsinebIdIenaHCaRbePTdI\dæEdlykmkkinbgðab;enaHeKGacxYgyksMNakKMrUminxUcRTg;
page52
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page53
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
2.5
Drydensity g/cm3
1.5
0.5
0
0 5 10 15 20 25
CBR
page54
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
brimar eLIy Maximum combination of normal stress and shear stress . enAkñgú qñaM 1776
elak COULOMB )aneGaynUvsmIkarmYy edIm,IKNna rkTMnak;TnM g rvagkMlaMgEkgnigkMlaMgkat;
pþac;dUcxageRkamenH³
tg c
Edl - C (cohesion) Caer:siusþgs; ¥itCab;rbs;dI
- (Internal friction angle) CamMukkitkñúgrbs;dI
- (Normal stress) CakMlaMgEkg
- (Shear strees) CakMlaMgkat;pþac;
smIkarenHeKeGayeQµaH fa c,ab; lkçN½énkarkat;pþac; rbs; elak MOHR-COULOMB(Mohr-
Coulomb Failure Criteria).
page55
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
x
x
bøg;kat;pþac;
-mMuTMertEdlekIteLIgedaykMlaMgkat;pþac;³
Inclination of the plan of failure caused by shear:
tamc,ab; lkçN½énkarkat;pþac; rbs; elak MOHR-COULOMB eyIgGacKNnarkmMuTeM rténbøg;
kat; pþac; tamrUbPaBxageRkam Edl nig CakMlaMgEkg sMxan; tamTisedABIrEkgKña.
1 3
1
3
page56
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
2
C
f 0 3 a 1
eyIgGacsresrTMnak;TnM g 45 2
edayELkeyIg GacmanTMnak;TnM g
ad 1 3
sin , fa = fo+oa = c.cot+
fa 2
1 3
ad
2
1 3
sin 2
1 3
c. cot
2
1 sin cos
1 3 2c
1 sin 1 sin
1 sin cos
eday 1 sin
tan 2 45
2
nig
1 sin
tan 45
2
enaHeyIg)an³
1 3 tan 2 45 2c tan 45
2 2
page57
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-karkat;pþac;RbePTdICaMTwk³
Shear failure law in saturated soil:
Edl Ca kMlaMgEkgsrub
' Ca kMlaMgRbtikmµrbs;RKab;dI
u Ca kMlaMgTwkenAkñúgRKab; dI
page58
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
hab;mFüm 30-35
hab; 35-38
xSac;manRKab;RCúg²
RtsuH 30-35
hab;mFüm 35-40
hab; 40-45
RKYslayxSac; 34-48
dIl,aym:dæ 26-35
page59
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
n ( i i ) i i
tg
n i i
2 2
-n CacMnYnBiesaFn_
page60
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
3
3
2
2
1
1
1 2 3
xSac;RtsuH
bMlas;TIbøg;edk
page61
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-krNIkat;pþac;dICaMTwk³
Drained direct shear test on saturated sand and clay
karBiesaFn¾ kat;pþac;dICaMTWk CatMbUgeyIgRtUvRtaM dIeyIg TukecaleGayvaEq¥tTwk.bnÞab;mk
eyIgsgát;dITal;EtkMlaMgsMBatTwkesµnI wg 0¬TwkRCabecjBIRbehagdI¦ minticCag 24em:ag.bnÞab;mk
eTIbeyIgTajpþac;dIeday el,ÓnyWtCaTIbMput BI 2 eTA 5 éf¶cMeBaH dI\dæ. cMeBaHdIxSac;emKuNCMrab
mantMélFM dUecñHkMlaMgsMBatTwk Kµan\TæBi leTAelIkarBiesaFn¾eLIy.kñgú krNIenHeyIgsegáteXIjfa
mMu sMrab;xSac;s¶ÜtngixSac;esImman tMélesµIKña.
-sMKal; ³ cMeBaHBBYkdI\dæ Tn;RCayEdlsßitenAkñúg lkçN½eRkam sMBatFmµta normaly
consolidated tMél c esµRI bEhlnwg 0. cMeBaHBBYkdI\dæ rwg hab;Edlsßit enAkñúg lkçN½ eRkAsMBat
dIrwg
C
dIRCay
page62
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-segát³
kñúgkrNIEdlkMlaMgkat;pþac; Gtibrma peak FMCag kMlaMgkat;pþac;cugeRkay ultimate
enaH eyIgnwg)an RkaPik2 epSg Kña.EdlRkaPikTI1 sg;tam peak eyIgnwg)an tMélmMu p EdlCa
tMél Gtibrma. RkaPikTI2 sg;tam critical eyIgnwg)an tMélmMu cs EdlCa tMél Gb,rma. Ca TU
eTAkñúgkarKNna RKwHeKeRbI tMélmMu cs EdlCa tMél Gb,rma. dUecñHkñúgkarBiesaFn¾ cMeBaHdIrwg rW
dIhab; eKRtÚvdak;kMlaMg sgát;Ekg eGay FM Edlkñgú krNI enH eyIgnwgTTYl)an peak = ultimate
-krNIkMlaMg sgát; 100KPa
peak
ultimate
p
cs
page63
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
ultimate
peak
cs or p
page64
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-karBiesaFn_kñúgRbB½n§G½kSbI
Triaxial shear test
karBiesaFn_EdleyIg)anerobrab;xagelIKWeyIgGnuBaØatiþeGaydIrbs;eyIgdac;eTAtamTisedA
Edl)ankMNt;. dUecñHRbsinebImanRKYs rW fµmYydueM nAcMefñrRbGb;kEnøgEdl eyIgTajpþac;enaHva bNþal
eGay RbGb;TajdIKaMg eBlenaHeyIgnwgTTYl)aner:suIsþgd; Iman tMélFMEdlvaCaerOg mYyxus karBit .
dUecñHelak BISHOP Alain Wilfrid )an begátI ]bkrN¾ G½kSbI edIm,Ikac;b)M ak;dI Compression triaxial
IenaH)anesckþIfa dIGac)ak;)an RKb;Tis tamcitþEdl vacg; .
page65
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page66
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
Cu
'o o' '1
M1
dI\dæ = 19KN/m3
2.00
M2
page67
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page68
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page69
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page70
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
Uc CakMlaMgsMBaFTwk
3 CakMlaMgbgðab;dI
taragxageRkam bgðajGMBItéM l emKuN B sMrab;RbePTdIepSg² kñúgkrNICaMTwk³
RbePTdI tMél emKuN B
dI\dæRCay Normaly consolidated soft clay 0.9998
3 3
Uc=0 Ud=0
3
3 3 3
3 3
page71
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
Normaly cosolidated
Overconsolidated
1
3='3 1='1
page72
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
1
1 3
1
2
3='3 1='1
page73
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
Rbtikmµsrub rbs;;d I Total stess at failure EdlkñúgkrNIenH kMlaMg sMBaFTwk Pore water pressure
mantMélFMCag 0 (U >0).eyIgGacKNna rk TMnak;TnM g U tamrUbmnþxageRkam³
d d
Ud
A
d
Edl A emKuNCakMlaMgsMBaFTwkEdlesñeI LIgedayelak SkemptonkñúgqñaM1954
edayELk kñúg CU test eyIgman TMnak;TMng³
kMlaMgsgátb; M)ak;dsI rub Major principal stress at failure Total
3+(d)f = 1
kMlaMgsgátb; M)ak;dI Bit² Major principal stress at failure Effective
1- (Ud)f = '1
kMlaMgbgðab;dIsrub Minor principal stress at failure Total
3
kMlaMgbgðab;dI Bit² Minor principal stress at failure Effective
3- (Ud)f = '3
Edl (Ud)f CakMlaMgsMBaFTwk enAkñgú xN³sgát;bM)ak; dUecñHeyIgGacmanTMnak;TMng³
1- 3= '1- 3
karBiesaFn¾ minRtÚveGayticCag3 bnÞab;mkeyIg sg;RkaPikdUcrUbPaBxageRkam
Effective strees failure envelope
f ='tg
cu
f = tgcu
'3 3 '1 1
Udf Udf
page74
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
Normaly cosolidated
Overconsolidated
cu
1cu
Ccu
3 1
page75
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
vas;)an KWCa kMlaMg Rbtikmµsrub rbs;;d I Total stess at failure EdlkñúgkrNIenH kMlaMg sMBaFTwk
Pore water pressure mantMélFMCag 0 (U >0).eyIgGacKNna rk TMnak;TMng U tamrUb
d d
mnþxageRkam³
Ud
A
d
Edl A emKuNCakMlaMgsMBaFTwkEdlesñeI LIgedayelak SkemptonkñúgqñaM1954
RbsinebI U CakMlaMgsMBaFsrubrbs;TwkEdlmankñúgdI KW
U Uc Ud rW U B 3 A ( 1 3)
Cu
page76
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-er:susI þg;dIFn;nwgkarsgát;bM)ak;
Unconfined compression test on saturated clay
1
F
1
2
0 2
1 2 = 3 = 0 I 1
M 1
2
1
page77
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page78
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
rUbTI13 ³]bkrN_BiesaFn_
sgát; bM)ak;dI
page79
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
8-kMlaMgFak;cuHkñúgdI
Stress in soil mass
enAeBlEdleyIgmanRKwH mYyQrelIdI enaHdIEdlenACab;pÞal;nwg)atRKwHrgnUvkMlaMgGtibrimar
EdlbnÞkú ssrrujeTAelIRKwHenaH.b:Eu nþcMeBaHdIEdl enA CMerAeRCA kMlaMgFak;cuHrbs;RKwH RtÚvfycuHtam
CMerA TaMgenHbNþalmkBI mankMlaMgmYyénEpñkxøHFak;eTAxag EdlktþaenHeFVeI Gayman kar)at;bg;kM
laMgEdlFak;Rtg;cuHeRkam. eyIgsegátemIlGMBRI bePTénkMlaMgxøH dUcxageRkamenH³
-kMlaMgeTal ³
q
Z
r
page80
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-kMlaMgrayesµI elImuxkat;mUl
M
-kMlaMgrayesµIelImuxkat;ctuekaN
2a
2b
page81
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
v = K.q
Edl K KWCaemKuNEdleKGacKNna)ankñúgtarag EdlP¢ab;mkCamYy . dUecñHRbsinebIeKcg;rk
kMlaMg EdlzitenARtg;cMNucNak¾edayeRkam)atRKwHenaHeKGaceRbIR)as;karEbgEck RKwHCakUnRKwH
tUc² edayeFVIy:agNaeGaypl bUkkUnRKwHtUc² eGayesµIRKwHFM emIlrUbxageRkam .
I II
V = q. (KI + KII + KIII + KIV)
ss M
MM
III IVIV
I I II
V = q. (KI + KII - KIII - KIV)
III IV
M
lMhat;
sUmeFVIkarKNnakMlaMgEdlenAesssl; Rtg;cMNcu M kñúg CMerA Z=5m tamrUbxageRkam ebIkMlaMg
rayesµI q = 100KPa .
2a=1.5m
I
2b=2m II
V = q. (KI + KII - KIII - KIV)
III IV
0.5
0.5m M
page82
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
kñúgkrNIenH sMrab;RKwHTImYy ³
2b=2.5m
2a=0.5m
naMeGayeyIg)an ba 5 & 2Za 10 dUecñHtamtarag eyIgTTYl)an K1 = 0.020
kñúgkrNIenH sMrab;RKwHTIBIr ³
2b=2.5m
2a=1.00m
naMeGayeyIg)an ba 2.5 & 2Za 5 dUecñHtamtarag eyIgTTYl)an K2 = 0.039
kñúgkrNIenH sMrab;RKwHTIbI ³
2b=0.5m
2a=0.50m
naMeGayeyIg)an ba 1 & 2Za 10 dUecñHtamtarag eyIgTTYl)an K3 = 0.005
kñúgkrNIenH sMrab;RKwHTIbYn ³
2b=0.5m
2a=1.00m
naMeGayeyIg)an ba 0.5 & 2Za 5 dUecñHtamtarag eyIgTTYl)an K4 = 0.009
dUecñH eyIg)an = q. (K + K - K - K )
V I II III IV
V = 4.5 KPa
edayELkkñúgkarKNnaGMBIklM aMgEdlFak;eTAkñúgCMerAdI enAcMGkS½RKwHeyIgGaceRbIrUbmnþxag
eRkamenH³
-rUbmnþTI1³ eyIgKitfa kMlaMgEdlFak;eTAeRkamRKwH EckecjCamM 1 edk 2 Qr. dUecñH ebIRKwH
eyIg man TTwgesµI 2 m nig beNþay esµI 2/50 m rgnUvbnÞkú 500 KN enaHenA CMerA 5 m cMGkS½RKwH
dIeyIgTTYlrgbnÞúk (2 5500 KN
) (2.5 5)m
9.52 KPa
page83
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
1 2mn m 2 n 2 1 m 2 n 2 2 2mn m 2 n 2 1
I2 2 arctg
4 m n 2 m 2 n 2 1 m 2 n 2 1 m 2 n 2 m 2 n 2 1
kñúgkrNIenH sMrab;enAcMEKmRKwH m
B
Z
n nig
L
Z
sMrab;enAcMGkS½RKwH m
B
2Z
n nig
L
2Z
b/a
K 0 0.1 0.2 1/3 0.4 0.5 2/3 1 1.5 2 2.5 3 5 10
0 0.000 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250
0.2 0.000 0.137 0.204 0.234 0.240 0.244 0.247 0.249 0.249 0.249 0.249 0.249 0.249 0.249 0.249
0.4 0.000 0.076 0.136 0.187 0.202 0.218 0.231 0.240 0.243 0.244 0.244 0.244 0.244 0.244 0.244
0.5 0.000 0.061 0.113 0.164 0.181 0.200 0.218 0.232 0.238 0.239 0.240 0.240 0.240 0.240 0.240
0.6 0.000 0.051 0.096 0.143 0.161 0.182 0.204 0.223 0.231 0.233 0.234 0.234 0.234 0.234 0.234
0.8 0.000 0.037 0.071 0.111 0.127 0.148 0.173 0.200 0.214 0.218 0.219 0.220 0.220 0.220 0.220
1 0.000 0.028 0.055 0.087 0.101 0.120 0.145 0.175 0.194 0.200 0.202 0.203 0.204 0.205 0.205
1.2 0.000 0.022 0.043 0.069 0.081 0.098 0.121 0.152 0.173 0.182 0.185 0.187 0.189 0.189 0.189
1.4 0.000 0.018 0.035 0.056 0.066 0.080 0.101 0.131 0.154 0.164 0.169 0.171 0.174 0.174 0.174
1.5 0.000 0.016 0.031 0.051 0.060 0.073 0.092 0.121 0.145 0.156 0.161 0.164 0.166 0.167 0.167
1.6 0.000 0.014 0.028 0.046 0.055 0.067 0.085 0.112 0.136 0.148 0.154 0.157 0.160 0.160 0.160
1.8 0.000 0.012 0.024 0.039 0.046 0.056 0.072 0.097 0.121 0.133 0.140 0.143 0.147 0.148 0.148
2 0.000 0.010 0.020 0.033 0.039 0.048 0.061 0.084 0.107 0.120 0.127 0.131 0.136 0.137 0.137
2.5 0.000 0.007 0.013 0.022 0.027 0.033 0.043 0.060 0.080 0.093 0.101 0.106 0.113 0.115 0.115
3 0.000 0.005 0.010 0.016 0.019 0.024 0.031 0.045 0.061 0.073 0.081 0.087 0.096 0.099 0.099
4 0.000 0.003 0.006 0.009 0.011 0.014 0.019 0.027 0.038 0.048 0.055 0.060 0.071 0.076 0.076
5 0.000 0.002 0.004 0.006 0.007 0.009 0.012 0.018 0.026 0.033 0.039 0.043 0.055 0.061 0.062
10 0.000 0.000 0.001 0.002 0.002 0.002 0.003 0.005 0.007 0.009 0.011 0.013 0.020 0.028 0.032
15 0.000 0.000 0.000 0.001 0.001 0.001 0.001 0.002 0.003 0.004 0.005 0.006 0.010 0.016 0.021
20 0.000 0.000 0.000 0.000 0.000 0.001 0.001 0.001 0.002 0.002 0.003 0.004 0.006 0.010 0.016
50 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.001 0.002 0.006
page84
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-kMlaMgFak;cuHeTAeRkamtameCIgeTr³
Vertical Stress Due to Embankment Loading
kñúgkarsagsg;TMnb;Twk rW fñl; eyIgcaM)ac;RtÚveFVIkarsikSa GMBI kMlaMgEdlFak;cuHeTAkñúgdI edIm,IeFVI
karKNnarksMrutrbs;va.eyIgeFVkI arsikSa dUcxageRkamenH³
B2 B1
qo=H
2
1
q0 B1 B2 B
Z ( 1 2 ) 1 ( 2 )
B2 B2
B B2 B
1 (radians ) arctg 1 arctg 1
Z Z
B1
2 (radians) arctg
Z
page85
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
9-karsikSarGMBIsMrutrbs;dI
Consolidation test
kñúgkareFVIsMNg; RKwHbBaðasMxan;minEmnsßitenARtg;karsikSaGMBIlT§PaBRTRTg;rbs;dI (The
Bearing Capacity) Etb:eu NÑaHeT. eRBaHkarsikSarTamTarnUvsMNg;BMnHu xñat;rbs;RsTab;dI edIm,I
page86
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
hi
Ho Ho ho
ho
rUbTI14³KMnUsbMRBÜjrbs;dI
page87
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
eo =
Vair Vw
Vs
EdlGacKNnatamrUbmnþ ³ e = sdd
ho Ho ho Ho hi
eo = ei =
Ho Ho
- Edl s TMgn;maDxniCdI & d TMgn;maDdIs¶Üt
Gnuvtþn¾tamKMrxU agelI eKbegáIt)annUv]bkrN¾müa:g EdlehAfa GUdUEm:Rt (Oedometer) .
enAeBlEdleKniyayGMBsI Mrtu rbs;dI eKEckvaecjCa3RbePTepSgKña³
-sMrutPøam² Immediate settlment cMeBaHdIxSac;EdlCaRbePTdIman emKuNCMrabFM.dUecñHeBl
EdldIrgnUvkMlaMgsgátP; øamTwkRCabecjBIdIy:agelOn eFVIeGay RKwHRsútcuH y:agelOn ehIyQb;Rsút
Et mþg.EdlehtukarN¾ enH )anbgðajeGayeXIjfa el,Ónénkarbgðab;rbs;dxI Sac;manel,Ón elOn.
dUecñHcMeBaHdIxSac; eyIgsegáteXIjfamanEtsMrutPøam²Etb:ueNÑaH.
-sMrutdMbUg Primary settlment cMeBaHdI\dæEdlCaRbePTdIman emKuNCMrabtUc swgesµnI wg 0.dUecñH
eBl EdldIrgnUvkMlaMgsgátP; øamTwkRCabecjBIdIy:agyWtCaTIbMput eFVIeGay RKwHRsútcuH edayel,Ón d¾
EsnyWtCaTIbMput .EdlehtukarN¾ enH )anbgðajeGayeXIjfael,Ónénkarbgðab;rbs;dI\dæmanel,Ón
yWt.dUecñHcMeBaHdI\dæeyIgsegáteXIjfa eRkABIsMrutPøam²EdlmantMéld¾EsntUc eyIgnwgTTYl)an
sMrut dMbUg EdlmantMél d¾EsnFM kñúgry³eBleRkay BIkarsagsg;rYc 4 rW 10qñaeM Rkaymk.
-sMrutbnÞab; Secondary settlment cMeBaHdICIvsa®sþ Soil organic EdlCaRbePTdIman emKuN
CMrabtUc swgesµInwg 0 niglayLMeTAedaykMeTckMTI rukçCatis¥úyrlYy.dUecñH eBl EdldIrgnUvkMlaMg
sgát;PøamTwkRCabecjBIdIya: gyWtCaTIbMput eFVeI Gay RKwHRsútcuH edayel,Ón d¾ EsnyWtCaTIbMput .
EdlehtukarN¾ enH )anbgðajeGayeXIjfael,Ónénkarbgðab;rbs;dCI Ivsa®sþmanel,Ón yWt.dUecñH
cMeBaHdICIvsa®sþeyIgsegáteXIjfa eRkABIsMrutPøam²EdlmantMéld¾EsntUc eyIgnwgTTYl)an sMrut
dMbUg EdlmantMél d¾EsnFM kñgú ry³eBleRkay BIkarsagsg;rYc 4 rW 10qñaMeRkaymk. edayELk
eBlEdlsarFatuCIvsa®sþ eFVIkarbMElg FatuKImI bMPayeTA Ca ]sµn½enaH vabNþaleGaydI)at;bg;nUv
maDrbs;xøÜnbEnßmeTot begáIt)aneTACasMrutbnÞab; enAkñúgry³eBl 10 eTA 30qñaeM RkayeTot. sMrut
page88
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
Immediate settlement
Primary settlement
Secondary settlment
Settlement (MM)
page89
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
1kgf / cm 2 X 45cm 2
4,5kg
10
-labxøaj;eKaenAelIépÞxagkñúgénkgsuLI aMg.
page90
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-]bkrN¾GUdEU m:RtRtÚvRtaMTwk[esImeCaKsBVsac; .
-dak;kgnigdIcUleTAkñúgGUdUEm:Rt ehIydMeLIg]bkrN¾eRkamRbB½n§ pþl;sMBaF nig
dMeLIgnaLikarvas;sMrut.
eKGacKNnark d edayykdIkñúgkgeRkayBiesaFn¾eTAsMgYtkñúgsItuNðPaB 105 C kñúgryHeBl 24
o
d = m2
eo = s d
V d
-karKNnalT§plBiesaFn¾³
kñgú karKNnasMNg;suIvil karKNnarkm:DU ulkMhUcRTg;RTay E eKeRcInGnuvtþn¾ tMélEdl sßitenA
cenøaHkMlaMg 1 = 1kgf/cm & 2 = 2kgf/cm .
2 2
tarag nig
RbePTdI
(1 eo)
- m:UDlu kMhUcRTg;RTayKNnatamrUbmnþ ³ E=
e
.
page91
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
2 = 2kgf/cm2
page92
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
2-GUdUEm:RtGaRs½ynwgeBl ³
kñúgkareRbIkMlaMgsgát; CaTUeTAeKeRbIkMlaMgsgát; 5 kUnCBa¢Igy:agticbMput . kMlaMgEdl sgát;man dUc
teTAKW ³ 0.5kgf/cm ; 1kgf/cm ; 2kgf/cm ; 4kgf/cm ; 8kgf/cm . ehIyRbsin ebIcaM)ac; kardk
2 2 2 2 2
kUnCBa¢gI mancMnYn 4 dgKW³ 4kgf/cm ; 2kgf/cm ;1kgf/cm 0.5kgf/cm . kñgú eKal bMNgvas;nUvPaB
2 2 2 2
yWtrbs;RKab;dI EdleKehAfaPaBehImrbs;dI .
page93
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
-karvas;sMruttamryH eBl mandUcteTA ³ 6'' ; 15'' ; 30' '; 45'' ; 1' ; 1'30'' ; 2' ; 3' ; 5' ; 7' ;10' ;
15' ; 20' ; 30' ; 45' ; 1h ; 1h30' ; 2h ; 3h ; 4h ; 6h ; 24h .
-karsg;RkaPicénsMrut ³
page94
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page95
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
h – kMBs;sMNakKMrUmuneBlBiesaFn¾ .
o
kMNt;sMKal;
tMél t(50)RtÚvbMElgCavinaTI sin eTIbGacbBa©ÚleTAkñgú karKNna .
enAkñúgemkanicdI karsikSarGMBIsMrutman 3 RbePT KW ³
1-sMrutPøam² ³ EdlsMrutRbePTenHmanEtsMrab;BBYkdIxSac; b:ueNÑaH KW bnÞab; BIeyIg sg;Pøam va
RsutPøamehIyElgRsut .
2-sMrutdMbUg ³ KWCasMrutsMrab;BBYkdI\dæ EdlkñúgkrNIenH sMrt u Pøam²mankrNItUcbMput ebI eFob eTAnwg
sMrutdMbUg . dUecñH sMrab;dI\dæeKminKitsMrutPøam²eT .
3-sMrutbnÞab; ³ vaKWCakrNI sMrab;dI CIvsaRsþ Ed;lkñúgkrNIenHsMrutGUsbnøayKµan Qb;Qr ehIy
page96
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
10-karBiesaFn¾elIkardæanpÞal;
In situ test
karsikSaEdleyIg)aneFVIknøgmk KWeyIg)andkyksMNakKMrU TaMg2 RbePT ykmkmnÞrI
BiesaFn¾ edIm,IeFVIkarBiesaFn¾ . dUecñHkarbBa¢nÚ sMNakKMrBU IkardæanmkmnÞrI BiesaFn¾vaGaceFVIeGay
sMNakKMrU s¶Üt eRbH.l. EdlCaehtueFVIeGaysMNakKMrxU usBIlkç½NÐ FmµCati. dUecñH eKeTomTar
eFVIkar BiesaFn¾ elIkardæanpÞal; . CnCati hULg; )anbegáIt nUv ]bkrN¾ CaeRcIn edIm,Ivas;er:suIsþg;
rbs;dPI øam² .
1-karcak;TMluHdIedaykMlaMgsþaTic Static cone penetration test³
]bkrN¾enHmanBIr RbePT
-RbePTekaNcak;TMluHdIEdlKµanépÞkkitxag ³
KWCakarBiesaFn¾ edaykarcak;TlM uHekaNeday kMlaMg sþaTic ehIyeKvas;nUvkMlaMg cak;TMluH enaH
Pøam² Etmþg . ekaNenaHmanRkLaépÞ 10cm nig 60 karBiesaFn¾ EbbenH eKTTYl)an Et er:suI
2 o
'
nig E = 2q c
0
Edl '0 CaTMgn;dsI gát;tKñadkTwkecj effective vertical stress
page97
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
rUbTI17³karBiesaFn_eb:eNRtUEm:RtsþaTik
2-karbukTMluHdIedaykMlaMg DINamic Dynamic cone penetration test³
KWCakarBiesaFn¾edaykarbukCnøjÜ Edk BenøceTAkñgú dIedayeKvas;nUvCMerAEdllicenaH eFobeTAnwg
cMnYnsMBgrbs;jjÜr . CnCati hULg; )aneGayrUbmnþedIm,IKNnarkkMlaMg DINamic .tamrUbmnþdUc
xageRkamenH ³
qd = M M .H
.
e.( M M ) A
1
page98
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
M – CaTMgn; jjÜrKitCa Kg
M – CaTMgn;dgCnøÜjEdk KitCa Kg
'
rUbTI17³karBiesaFn_eb:eNRtUEm:RtDINamik
page99
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
N = N1 + N2
edayELkeyIgGaceFVIkMENtamCMerAEdleyIgBiesaFn¾ ³
N = N' x CN
page100
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
2000
CN = 0.77log Peck1974
.D
1
C N 9.78 Liao & Whihman 1986
'0
2
CN Skempton1986
1 0.01 ' 0
'
C N 1 1.25 log 0 Seed 1975
95.6
-N KWCatMélEdleRkayBIeFVIkMENrYc
RbsinebIdIeyIgCaxSac;RKab;tcU ehIyCaMTwkeyIgRtÚveFVkI MEN 2 dgKWkEM NTWkpg nig kMENCMerApg.
sMrab;dxI Sac; eyIgGacKNnarkmMukkitkñúgnig m:UDúlPaByWttamTMnak;TMngxageRkam³
20 N 20 Hatanaka & Uchida 1996
27.1 0.3N 0.00054 N 2
Wolff 1989
18N 15 For road and Bridges design sMrab;f;ñl;nigs<an
0.36 N 27 For building design sMrab; GaKar
page101
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
RtsuH 4 10 15 35 28 30 14 18
hab;mFüm 10 30 35 65 30 36 17 20
hab; 30 50 65 85 36 41 17 22
sMrab;dI\dæ
RbePTdI N
er:suIsþg;Fn;nwgkarbM)ak; KPA
RCay <2 < 25
Tn; 24 25 50
page102
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
page103
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
11-bec©keTsbuersnavisVkmµPUKBVsaRsþ
Technical soil investigation
kñúgkarsikSaGMBlI kç½NÐvisVkmµPUKBVsaRsþeKTamTarnUvkarBiesaFn¾ rW karxYgenAelIkardæan pÞal;
edIm,IdkyksMNakKMrUeTAeFVIkarBiesaFn¾kñgú mnÞIrBiesaFn¾edIm,ITajyk)a:ra:Em:Rtrbs;dImkeFVI karKNna
rklT§PaBRTRTg;rbs;RKwH . CaTUeTAeKTamTarnUvsMNakKMrURKb;RsTab;dITaMgGs;Edl sßitenABIeRkam
)atRKwH kñgú CMerAlkç½NÐ. CMerAreNþAxYgvaGaRs½yeTAnwgRbePTsMNg;FunF¶n; rW Fun Rsalnwglkç½NÐ visV
kmµPKU BVsaRsþelITIlanpÞal; ¬ebIRKwHrak;enaHCMerAxYgk¾rak;Edr ebIRKwHCMerAenaH CMerAxYgk¾eRCAtamenaH¦ .
karKNnarkCMerAxYgvamanBak;B½n§ya:geRcIneTAnwgmCÄdæanCuMvij . CaTUeTARbsinebIRKwHeyIgCa ³
RbePTRKwHRTEvgenaHCMerAreNþAxYg Z = 6B Edl B KWCaTTwgrbs;RKwH .
RbePTRKwHeCIgtagenaH CMerAreNþAxYg Z = 1,5B Edl B KWCaTTwgrbs;RKwH .
RbePTRKwHcak;eBjenaH CMerAreNþAxYg Z = 1,5B Edl B KWCaTTwgrbs;GaKar .
edayELkeKGacmanTMnak;TnM gkñúgkarKNnarkCMerAxYgtamviFIxageRkamenH ³
Z = 4,5B ebI C < 2B
B C B
page104
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
2
D
3
D
reNþAxYg
B 1,5B
sMrab;karKNnacMnYnreNþAxYgKWRtÚveFVeI LIgtamkarviPaKtamtaragxageRkamenH ³
cMgayBIreNþAxYgmYyeTAxYgmYy¬Em:Rt¦
KMerag cMnYnreNþAxYg
lkç½NvÐ isVkmµPKU BVsaRsþ
dImanEt dImanBIrbI dImaneRcIn
mYyRsTab; RsTab; RsTab;
pÞHmaneRcInCan; 45 30 15 4
pÞHman1Can;eTA2Can; 60 30 15 3
srsrs<an / b:m - - - 1- 2
sMrab;RKwHnimYy²
fñl; 250 150 30 -
page105
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
sMrab;sMNakKMrUEdlRtÚvdkykecjeTABiesaFn¾manBIrRbePT ³
-sMNakKMrEU dlminxUcRTg;RTay ³ sMNakKMrURbePTenHeyIgyk)ansMrab;EtBBYkdI\dæEdlman
lkçN³BI Tn; eTA rwg . KWCaRbePTdIEdleyIgsgÄwmfaRKwHeyIgnwgQrelIdIenaH .
-sMNakKMrEU dlxYcRTg;RTay ³ sMNakKMrURbePTenHeyIgRtÚvykRKb;RsTab;dITaMgGs;minfaTn; rwg
rW RCayeLIyKWeyIgykTaMgdIxSac;TaMgdI\dæ .
cMnYnsMNakKMrEU dlRtÚvykkñgú mYydu²M manTMgn;RbEhl 1Kg eTA 3Kg ehIykñúgmYyRsTab;²eyIg
yk mineGayticCag bIdMu .
sMrab;BBYkdIxSac;karyksMNakKMrmU antYnaTIminsMxan;CagkarBiesaFn¾enAelIkardæanpÞal;eLIy
(DCP,CPT,SPT ) .
edayELkeyIgRtÚvviPaKFatuKImIEdlmanenAkñúgTWkeRkamdIeRBaHCYnkalTwkeRkamdIGacmanRbti
kmµ eTAelIebtug .
page106
Institute of Technology of Cambodia, Geotechnical and Mine department
Mr. SIENG Peou Mcs. of Geotechnical engineering,Tel.(855) 11 874 974, Email: [email protected]
rUbTI19³rUb]bkrN_xYgdI
page107