Control Plan
Control Plan
: 01
CONTROL PLAN Format No.: PPTL/CP/PD/01
Proto Type: Pre-launch: Production: ✘ 28/08/2013
Date (Org.) : --
Core Team : Sonal Jain, Rakesh Pandey, Pramod Rawat,
Uday Pratap Singh Revision Date: 12/10/2013 Date (Review) : 01 08/01/2014
Part Name / Description : Applicable for all tubes
Customer Engineering Approval Date (If Req'd.) : --- N/A
Supplier / Plant Approval Date : --- 28/08/2013 Customer Quality Approval Date ( If Req'd.) : --- N/A
Supplier / Plant / Site : Prem Prakash Tubes Ltd., Pithampur
Supplier Code : Trader Other Approval Date ( If Req'd.) : --- N/A
Characteristics Method
Process
Part Machine, Device, Special
Name, Product / Evaluation Sampling
Process jigs, tools for No. Chara. Responsibili Re-action Plan
Operation Product Process Process Measurement Control Method
No. Manufacturing Class ty
Description Spec. / Tole. Techniques Size Freq
Raw
2 Manganese As per IS 1 coil
material Receiving
Inspection 3 Sulphur As per IS
Chemical
1 coil
Lab Inspection record Reject the material and
(Chemical & analysis Incharge send back to supplier
Mechanical 4 Phosphorus As per IS 1 coil
testing)
Physical Properties 1 coil
4 Spacer size As per m/c shaft Vernier Once start up Operator No Record Do required setting
Tube Mill
5 Weld strength * No visual Cracks
Bend/Flattening
Test
100%
Quality
Inspector
Inspection record
Identify & Keep Seperately.
Reject/reweld if possible.
20 Tube Mill
Rolling Quality Identify & Keep Seperately.
6 pin hole No pin hole Hydrotesting m/c ongoing
Inspector
No Record
Reject/reweld if possible.
Visual/Surface Quality
7 finish
Roll Setting As per standard Visual ongoing
Inspector
Inspection record Identify & Keep Seperately.
9 Voltage * 360 - 440 volts voltmeter once start up Operator Inspection record Reset
10 Ferrite rod setting Below contact Visual 1 set up Operator No Record Reset
Uniform
In appropriate
1 Varnish
Distribution of Visual 1 set up Operator No Record Reset
varnish
Varnish
30 (As per Varnish Machine As per
requirement) 2 Die Size
Requirement
Visual 1 set up Operator No Record Reset
Varnish Quality
3 temprature
50-60 °C Thermameter ongoing
Inspector
No Record Reset
Measurement Quality
1 Length As per IS
Tape
100%
Inspector
No Record Do rework/use for recovery
As per
5 Machine speed
Requirement
Gear system Once setup operator No Record Resetting
As per
6 Feed
Requirement
ongoing Operator No Record Resetting
Clamping As per
3 pressure Requirement
visual 1 Set up No Record Reset
Acid Pickling
Acid During
Water and HCL Inspection
1 Concentration
Content(100- Counting Once replacemen
record
Adjust conc.
120gm/ltr.) t
Acid tank, Water tank 2 Pickling Time 4 to 7 Min. Clock Every lot No Record Adjust timing
& Flux tank
Sp. Gravity 1.5- Inspection
3 Flux Gravity
1.2
Hydrometer 1 lot
record
Adjust
Drying
Dryer
Temperature
1 Temp. 60 -80 °C
Meter
Every lot No Record Adjust
Zinc Platting
Galvanizing Process
60 (As per Supervisor
requirement) Rework . If rework not
1 Uniformity IS : 4736 Lab testing 1 Hr. Inspection record
possible reject
No Zn inside
3 bore
internal die 100% No Record Rework
Zinc Bath
Temperature
5 Temp. 430- 450 °C
Meter
Every lot No Record
Adjust
Zinc Bath
Characteristics Method
Process
Part Machine, Device, Special
Name, Product / Evaluation Sampling
Process jigs, tools for No. Chara. Responsibili Re-action Plan
Operation Product Process Process Measurement Control Method
No. Manufacturing Class ty
Description Spec. / Tole. Techniques Size Freq
Adjust
6 Platting Time 30 sec Clock Every lot No Record
Check while
1 Tool Angle Protactor
replacement
Operator No Record Change the tool
Threading
Quality
2 Length of thread As per IS Vernier 1 Hr.
Inspector
inspection Report Do rework/use for recovery
Threading
Quality
3 Depth of thread As per IS Pitch gauge 1 Hr.
Inspector
inspection Report Do rework/use for recovery
Threading
70 (As per Threading Machine
Threading
requirement) Quality
4 Pitch As per IS Pitch gauge 1 Hr.
Inspector
inspection Report Rework/reject
Threading
Quality
5 No. of threads As per IS Counting 1 Hr.
Inspector
inspection Report Rework/reject
Threading
Major Dia. Go/No go ring Quality
6 As per IS
gauge
1 Hr.
Inspector
inspection Report Rework/reject
As per customer
1 Total Qty
requirement
Counting
Process
80 Packing - 100%
Supervisor
PDI Recheck complete lot
As per customer
2 Total Weight
requirement
Weight scale