1) The document is a control plan for Prem Prakash Tubes Ltd. that outlines the key characteristics and processes that will be monitored and controlled for their tube production. 2) Raw material will be inspected for dimensions, chemical composition, and physical properties according to industry standards, with non-conforming material rejected and sent back to the supplier. 3) During slitting, width, thickness, and burrs will be inspected, with any issues addressed through rework, equipment checks, or rejection of material if rework is not possible.

Uploaded by

Rakesh Pandey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
794 views4 pages

Control Plan

1) The document is a control plan for Prem Prakash Tubes Ltd. that outlines the key characteristics and processes that will be monitored and controlled for their tube production. 2) Raw material will be inspected for dimensions, chemical composition, and physical properties according to industry standards, with non-conforming material rejected and sent back to the supplier. 3) During slitting, width, thickness, and burrs will be inspected, with any issues addressed through rework, equipment checks, or rejection of material if rework is not possible.

Uploaded by

Rakesh Pandey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Control Plan No.

: 01
CONTROL PLAN Format No.: PPTL/CP/PD/01
Proto Type: Pre-launch: Production: ✘ 28/08/2013
Date (Org.) : --
Core Team : Sonal Jain, Rakesh Pandey, Pramod Rawat,
Uday Pratap Singh Revision Date: 12/10/2013 Date (Review) : 01 08/01/2014
Part Name / Description : Applicable for all tubes
Customer Engineering Approval Date (If Req'd.) : --- N/A
Supplier / Plant Approval Date : --- 28/08/2013 Customer Quality Approval Date ( If Req'd.) : --- N/A
Supplier / Plant / Site : Prem Prakash Tubes Ltd., Pithampur
Supplier Code : Trader Other Approval Date ( If Req'd.) : --- N/A

Characteristics Method
Process
Part Machine, Device, Special
Name, Product / Evaluation Sampling
Process jigs, tools for No. Chara. Responsibili Re-action Plan
Operation Product Process Process Measurement Control Method
No. Manufacturing Class ty
Description Spec. / Tole. Techniques Size Freq

Dimensions As per IS : 10748 1 coil

1 Width +10 mm Measuring Tape 1 coil

2 Thickness +/- 0.08 mm Micrometer 3 coil

Chemical Composition As per 10748 1 coil

1 Carbon As per IS 1 coil

Raw
2 Manganese As per IS 1 coil
material Receiving
Inspection 3 Sulphur As per IS
Chemical
1 coil
Lab Inspection record Reject the material and
(Chemical & analysis Incharge send back to supplier
Mechanical 4 Phosphorus As per IS 1 coil
testing)
Physical Properties 1 coil

1 Yst As per IS UTM 1 coil

2 T-S As per IS UTM 1 coil

3 E% As per IS UTM 1 coil

4 Bend Test As per IS 1 coil No Record

Identify & Keep Separately for


As per Slitting Measuring Tape, Quality
1 Width
Chart Vernier
2 Coil
Inspector
Inspection record recovery/rework. Use for
recovery.

Identify & Keep Separately for


As per Slitting Quality recovery/rework. Use for
2 Thickness
Chart
Micrometer 3 Coil
Inspector
Inspection record
recovery.If recovery not
10 Slitting Slitting Machine possible reject it.

Rework. Check cutter


3 Burr No Burr Visual 2 setup Operator No Record tolrance and sharpness and
correct it if required.
10 Slitting Slitting Machine Characteristics Method
Process
Part Machine, Device, Special
Name, Product / Evaluation Sampling
Process jigs, tools for No. Chara. Responsibili Re-action Plan
Operation Product Process Process Measurement Control Method
No. Manufacturing Class ty
Description Spec. / Tole. Techniques Size Freq

4 Spacer size As per m/c shaft Vernier Once start up Operator No Record Do required setting

1 OD * As per IS chart Vernier 1 1 Hr.


Quality
Inspector
Inspection record
Identify & Keep Seperately.
Rework/recovery.

Quality Identify & Keep Seperately.


2 Thickness As per IS chart Micrometer 1 1 Hr.
Inspector
Inspection record
Rework/recovery.

Quality Identify & Keep Seperately.


3 Length As per IS chart measuring tape 1 1 Hr.
Inspector
Inspection record
Rework/recovery.

Quality Identify & Keep Seperately.


4 Stamping As per IS chart Visual 100%
Inspector
Inspection record
Rework/recovery.

Tube Mill
5 Weld strength * No visual Cracks
Bend/Flattening
Test
100%
Quality
Inspector
Inspection record
Identify & Keep Seperately.
Reject/reweld if possible.
20 Tube Mill
Rolling Quality Identify & Keep Seperately.
6 pin hole No pin hole Hydrotesting m/c ongoing
Inspector
No Record
Reject/reweld if possible.

Visual/Surface Quality
7 finish
Roll Setting As per standard Visual ongoing
Inspector
Inspection record Identify & Keep Seperately.

Space between Based upon tube


8 rolls dia
Visual 1 set up Operator No Record Reset

9 Voltage * 360 - 440 volts voltmeter once start up Operator Inspection record Reset

10 Ferrite rod setting Below contact Visual 1 set up Operator No Record Reset

Welding Roll As per


11 profile Requirement
Std gauge 1 set up Operator No Record Reset

Uniform
In appropriate
1 Varnish
Distribution of Visual 1 set up Operator No Record Reset
varnish
Varnish
30 (As per Varnish Machine As per
requirement) 2 Die Size
Requirement
Visual 1 set up Operator No Record Reset

Varnish Quality
3 temprature
50-60 °C Thermameter ongoing
Inspector
No Record Reset

Measurement Quality
1 Length As per IS
Tape
100%
Inspector
No Record Do rework/use for recovery

2 no burr Visually ok Visually 100% Operator No Record Do Rework

3 Damages Visually ok Visually 100% operator No Record Do rework

40 End Facing End facing machine


Clamping As per
4 pressure Requirement
Visually Once setup Operator No Record Resetting
Characteristics Method
Process
Part Machine, Device, Special
40
Process EndName,
Facing Endjigs,
facing machine
tools for No. Chara. Product / Evaluation Sampling
Responsibili Re-action Plan
Operation Product Process Process Measurement Control Method
No. Manufacturing Class ty
Description Spec. / Tole. Techniques Size Freq

As per
5 Machine speed
Requirement
Gear system Once setup operator No Record Resetting

As per
6 Feed
Requirement
ongoing Operator No Record Resetting

Identify & Keep Seperately.


As per IS
1 No leakages
Specification
visual 100% Inspection record Check if rework/recovery
possible.
Hydrotestin
g Hydrotesting Process
50 machine As per IS supervisor
(As per 2 Water pressure
Specification
pressure gage 1 Set up No Record Reset
requirement)

Clamping As per
3 pressure Requirement
visual 1 Set up No Record Reset

Acid Pickling

Acid During
Water and HCL Inspection
1 Concentration
Content(100- Counting Once replacemen
record
Adjust conc.
120gm/ltr.) t

Acid tank, Water tank 2 Pickling Time 4 to 7 Min. Clock Every lot No Record Adjust timing
& Flux tank
Sp. Gravity 1.5- Inspection
3 Flux Gravity
1.2
Hydrometer 1 lot
record
Adjust

Outer surface 100% visual


4 Surface
should be clean
Visually
inspection
No Record Rework

Drying
Dryer
Temperature
1 Temp. 60 -80 °C
Meter
Every lot No Record Adjust

Zinc Platting
Galvanizing Process
60 (As per Supervisor
requirement) Rework . If rework not
1 Uniformity IS : 4736 Lab testing 1 Hr. Inspection record
possible reject

2 Adhesion IS : 4736 Hammer test 1 Hr. Inspection record Rework

No Zn inside
3 bore
internal die 100% No Record Rework
Zinc Bath

Platting Chemical One time during


4 Grade
Zn Lab testing
Replacing Zn
No Record

Temperature
5 Temp. 430- 450 °C
Meter
Every lot No Record
Adjust
Zinc Bath

Characteristics Method
Process
Part Machine, Device, Special
Name, Product / Evaluation Sampling
Process jigs, tools for No. Chara. Responsibili Re-action Plan
Operation Product Process Process Measurement Control Method
No. Manufacturing Class ty
Description Spec. / Tole. Techniques Size Freq
Adjust
6 Platting Time 30 sec Clock Every lot No Record

Ext unit,quenching Quenching tank Temperature


tank 1 temperature
50-60 °C
Meter
Every lot No Record

Check while
1 Tool Angle Protactor
replacement
Operator No Record Change the tool

Threading
Quality
2 Length of thread As per IS Vernier 1 Hr.
Inspector
inspection Report Do rework/use for recovery

Threading
Quality
3 Depth of thread As per IS Pitch gauge 1 Hr.
Inspector
inspection Report Do rework/use for recovery
Threading
70 (As per Threading Machine
Threading
requirement) Quality
4 Pitch As per IS Pitch gauge 1 Hr.
Inspector
inspection Report Rework/reject

Threading
Quality
5 No. of threads As per IS Counting 1 Hr.
Inspector
inspection Report Rework/reject

Threading
Major Dia. Go/No go ring Quality
6 As per IS
gauge
1 Hr.
Inspector
inspection Report Rework/reject

As per customer
1 Total Qty
requirement
Counting

Process
80 Packing - 100%
Supervisor
PDI Recheck complete lot

As per customer
2 Total Weight
requirement
Weight scale

Prepared By :- Mr. Sonal Jain Approved By :- Mr. Pramod Rawat


QC Engineer QC Manager