0% found this document useful (0 votes)
444 views9 pages

Auto Usage Decision - SAP Blogs

Uploaded by

keshar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
444 views9 pages

Auto Usage Decision - SAP Blogs

Uploaded by

keshar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Community

Ask a Question Write a Blog Post Login

Vivek Malik
August 26, 2016 2 minute read

Auto Usage Decision


Follow RSS feed Like

4 Likes 6,475 Views 3 Comments

Auto Usage Decision

If the goods in an inspection lot are confirmed to be free of defects in an inspection, the system can complete an
inspection automatically, provided certain prerequisite conditions have been met.

Prerequisite.

The system can only make an automatic usage decision if the following conditions have been met:

No characteristic has been rejected in the inspection lot


All required characteristics have been confirmed and closed
No defect records exist for the inspection lot

Auto UD process is given Below.

Step 1.

SPRO > Quality Management > Maintain Setting at Plant Level.


In Plant dependent QM setting maintain wait time in Automatic usage decision tab as per the business
requirement.

Waiting time :- The number of hours / mins entered here must have expired after creation of the Lot,before the
system makes an automatic usage decision for the corresponding inspection lot.

Step 3.

In material master in QM view activate Automatic UD indicator for the inspection type.
Step 4.

QA01 > Create manual inspection lot for the material.

Inspection lot is created for the material of inspection type 09.


Step 6:-

QE01 > Perform resulting recording .

Result recording is completed for the characteristics.


Result recording is mandatory to perform Auto UD if required char indicator is activated for the characteristic.

Step 7

Execute T-code QA10 to perform Auto UD for the Inspection lot. You can also scheduled job.
Auto UD has been made successfully for the inspection lot.

Alert Moderator

Assigned tags

PLM Quality Management (QM) | MAN Production Planning (PP) | plm | sap erp manufacturing production

planning | sap erp operations quality management |

Related Blog Posts

QM - EWM Partial Decisions for Inspection Lot


By Ismail Hakki Ince , Mar 29, 2019

QM Open Notice – #1 – UD status and QALS table relation (+QAVE)


By Albert Molnar , Jul 29, 2019

Frequently Asked Questions – FAQ QM


By Natalia Machado , Nov 24, 2014

Related Questions
Auto usage decision
By Former Member , Sep 19, 2011

Auto Usage Decision for both ok or not ok results


By Sachin Bangar , Aug 31, 2012

How to con gure Auto UD


By Former Member , Sep 03, 2014

3 Comments

You must be Logged on to comment or reply to a post.

Satish Bhagwat

November 26, 2016 at 1:06 am

Hi,
I have follow the same step however UD code is not getting update into inspection lot, only status of lot is
changed. Please suggest if we need to do something for this as well. 

Like(0)

KAVIYARASAN THANGAPPAN

August 22, 2018 at 4:40 am

Hi,

Kindly check and change the ‘posting proposal UD’ status for the concern ‘selected set code’, which is
available under the node ‘Maintain catalogs for usage decisions’.
T Code: QS51.

Best Regards,

Kavi T

Like(0)

Nitin Jinagal

November 16, 2018 at 10:36 am


Why didn’t you get inspection lot number with series 9 ? And I couldn’t nd the steps 2 and step 5. Did you
miss it

Also it will be nice to have details & screenshotsabout scheduling a background job since that actually
serves the purpose of automatic usage decision without doing anything after the results are recorded.

Like(0)

Find us on

Privacy Terms of Use

Legal Disclosure Copyright

Trademark Cookie Preferences

Newsletter Support

You might also like