Production and Planning Module: Project Identification
Production and Planning Module: Project Identification
REVISION HISTORY
Mr.Thamarai, Mr.Thangaraj
S. Akila Devi
Functional Consultant
Material Issue
Production Completion
No
QC
B
Yes
Stores Acceptance
ASSOCIATED AUTOTEX ANCILLARIES PVT LTD
SAP S/4 HANA IMPLEMENTATION PROJECT
AS IS DOCUMENT
A C
A C B
No
QC (Dispatch Audit)
Yes No
Sales Invoice
No
QC Scrap
Yes
Monthly order can be receive from Marketing Department called sales advice.
QC checking/Stores
Plan the Forecast based on salesAcceptance
advice.
th
Every month on 25 MRP plan can run based on Forecast.
Based on MRP,
We can run the Machine capacity plan.
Procurement of Raw material to purchase Department.
Creating Production order for FG and SFG items.
Man power requirement for production plan quantity.
Work order can be released based on MRP plan.
Release Material requisition to stores department.
Against requisition Material can be transfer from stores to production.
Production confirmation will be done based on log sheet. And goods issue will be
happen against to the production plan component quantity.
After that final inspection will be done for material.
Finally material will be placed in dispatch storage location and if any sale order
received or if any existing sale order available then material will be delivery to
customer along with invoice.
If QC is not accepted (Rejection), Material will be dismantle using dismantle
order.
Dismantle-FG Rework
Dismantle-Process wise rework
Finished and raw material stock will be transfer to stores warehouse.
Against material indent, required material will be transfer to production
warehouse.
Material can be issue from stores to production.
Finally material will be placed in dispatch storage location and if any sale order
received or if any existing sale order available then material will be delivery to
customer along with invoice.
ASSOCIATED AUTOTEX ANCILLARIES PVT LTD
SAP S/4 HANA IMPLEMENTATION PROJECT
AS IS DOCUMENT
Textile Products:
7 types:
1. Bobbin Holder
2. EFS(Easily Fixed Spindle)
3. AutoClean
4. Universal Holder
5. Fluff Protector
6. Magnetic Bag
7. Condenser
Bobbin Holder:
It has both standard and non-standard BOM based on customer requirement.
It consist 5 operations/Process.
Spring Winding-In-House/Subcontracting
Coil Forming-In-House
Plating-In-house/Subcontracting
Die-casting-In-House
Foil Printing-In-House
All Finished, Semi finished and Raw material consider as batch items.
Sub –Child components also will be selling.
Auto Clean:
It has no BOM and CRM.
Raw material can be purchase and sell the product (like trading).
It is a batch Number.
ASSOCIATED AUTOTEX ANCILLARIES PVT LTD
SAP S/4 HANA IMPLEMENTATION PROJECT
AS IS DOCUMENT
Condenser:
It has both standard and non-standard BOM based on customer requirement.
Sub –Child components also will be selling.
It is a batch Number.
Report:
Manpower cost will be calculated on daily basis(Direct and Indirect Cost).
Target vs actual cycle time of man and machine.
Target vs actual cycle time of planned quantity per month.
Gap Analysis:
A
Final Inspection B