10.14 Mva Transformer Foundation: Input Data Rebar Work Footing Size

This document provides input data for designing the foundation of a 10.14 MVA transformer. It specifies dimensions for the footing, wall height, rebar spacing and sizes. It then estimates costs for earth work, concrete casting, rebar work. The total cost for the transformer foundation is estimated to be 151130.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
776 views3 pages

10.14 Mva Transformer Foundation: Input Data Rebar Work Footing Size

This document provides input data for designing the foundation of a 10.14 MVA transformer. It specifies dimensions for the footing, wall height, rebar spacing and sizes. It then estimates costs for earth work, concrete casting, rebar work. The total cost for the transformer foundation is estimated to be 151130.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

10.

14 MVA TRANSFORMER FOUNDATION

INPUT DATA

Depth of foundation 1.7 REBAR WORK


Footing size Footing Rebar
Length 3 Spacing x-direction
Width 3.75 Bottom 0.15
Wall height 1.475 Top 0.15
Footing thickness 0.35
C.C Thickness 0.075 Spacing y-direction
Footing sectional area(X-DIRECTION) 2.23
Top platform sectional area Bottom 0.15
A1 0.188 Top 0.15
A2 0.134
A3 0.118 0.44 Vertical Wall rebar
Spacing
SECTIONAL AREA (Y-DIRECTION) 0.09 Horizontal Rebar
DB10 0.2
DB12
Vertical Rebar
DB10
C.C SECTIONAL AREA(X-direction) 0.237 DB12 0.15

length 3.15

EARTH WORK

Earth cutting 22.7205


Rate of cutting 6
Earth filling 22.7205
Rate of filling 4
COST 227.205

R.C.C CASTING

VOLUME OF CONCRETE

MAIN BODY V1 6.69


V2 1.32
V3 0.3375
Total volume of concrete 8.3475
Rate 12000

Cost for main casting(TK) 100170

C.C WORK

Volume Of C.C work 0.74655

COST 8958.6

REINFORCEMENT WORK

Rebar along X-direction


BOTTOM X Unit wt RATE T.Weight
length of rebar 3.3
No of Rebar 26
DB10 0.666
DB12 0.888 76.1904
DB16 1.456
DB20 2.466 78
COST 5942.851
BOTTOM Y

Length of Rebar 4.05


No of Rebar 21
DB10
DB12 75.5244
DB16
DB20
COST 5890.903

Top X

Length of rebar 3.3


No of rebar 26
DB10
DB12 76.1904
DB16
DB20
COST 5942.851
Top Y-direction

Length of Rebar unit wt 4.05


No of rabar 21
DB10
DB12 75.5244
DB16
DB20
COST 5890.903

REBAR FOR VERTICAL WALL

No of rod Rod length WT


Horizontal rebar
DB10 33.5 3.3 73.6263
DB12
DB16 535.5639
DB20
COST 5742.851
No of rod Rod length WT
Vertical Rebar
DB10
DB12 21 2.125 158.508
DB16
DB20
COST 12363.62

Total Cost for rebar 41773.98

TOTAL COST FOR TRANSFORMER FOUNDATION 151130