Please be informed that the following item/s are ready for your inspection Inspection point:
DATE OF INSPECTION: 27/02/2020 TIME: 14:00 LOCATION: PAP (as per ITP)
H
Attachment Required: Inspection Checklist Calibration Certificate W
Drawing ITP SW
Survey Report Others AP
Material Test Report R
RD
Item Description :
INSTALLATION- PRE CONCRETING & CONCRETING WORK FOR METERING STATION FOUNDATION
Remarks:
Name : Ahmad Zuwairisyazwan Bin Mohammad Najib Name : En.Ezani B othman Reject
Date : Date :
Sign : Sign :
H: Hold W: Witness SW: Spot Witness AP: Approval R:Review RD:Random Inspection