Emaar Plot A017 Icon Bay Residential Tower On DCH Island District
Emaar Plot A017 Icon Bay Residential Tower On DCH Island District
Emaar Plot A017 Icon Bay Residential Tower On DCH Island District
A
C
D
GENERAL NOTES
TO 22 / T2 _L02 TO
T1 _ LEVEL-23 (MECHANICAL-01)
T1 _ LEVEL-43 (PENTHOUSE-02)
T1 _ LEVEL-42 (PENTHOUSE-01)
2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
METERS UNLESS NOTED OTHERWISE.
3. DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN
T1 _ UPPER ROOF LEVEL
T1 _ LEVEL-24 TO 41
4. ANY DISCREPANCIES BETWEEN ARCHITECTURAL,
FFL 161.88 SSL 161.600
8.850
4.950
T1 _ ROOF LEVEL
SSL 8.850
SSL 4.950
GROUND FLOOR
ARCHITECTS NOTICE PRIOR TO EXECUTION OF WORK AT
T2 _ LEVEL-02
T2 _ LEVEL-01
T1 _ LEVEL-41
T1 _ LEVEL-40
T1 _ LEVEL-39
T1 _ LEVEL-38
T1 _ LEVEL-37
T1 _ LEVEL-36
T1 _ LEVEL-35
T1 _ LEVEL-34
T1 _ LEVEL-33
T1 _ LEVEL-32
T1 _ LEVEL-31
T1 _ LEVEL-30
T1 _ LEVEL-29
T1 _ LEVEL-28
T1 _ LEVEL-27
T1 _ LEVEL-26
T1 _ LEVEL-25
T1 _ LEVEL-22
T1 _ LEVEL-21
T1 _ LEVEL-20
T1 _ LEVEL-19
T1 _ LEVEL-18
T1 _ LEVEL-17
T1 _ LEVEL-16
T1 _ LEVEL-15
T1 _ LEVEL-14
T1 _ LEVEL-13
T1 _ LEVEL-12
T1 _ LEVEL-11
T1 _ LEVEL-10
T1 _ LEVEL-09
T1 _ LEVEL-08
T1 _ LEVEL-07
T1 _ LEVEL-06
T1 _ LEVEL-05
T1 _ LEVEL-03
_ LEVEL-02
T2_ LEVEL-04
SITE.
SSL
5.00 SSL
LEVEL-1.2M
5. ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND
LEVEL-01
ANY DISCREPANCIES OF ERRORS, SHALL BE INFORMED TO
8.90
T18.90
FFL 5.00
173.60
L03
FFL
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL
FFL
FFL
OTHER RELEVANT DRAWINGS, TOGETHER WITH THE
SPECIFICATION.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRODUCING
11730 6080 4000 4000 4200 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 5500 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3900 3800 1200 A COMPLETE SET OF DETAILED SHOP DRAWINGS FOR
CONSULTANTS APPROVAL.
8. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
11730 6080 8000 62000 5500 71400 3900 3800 1200
UPPER ROOF ROOF PENTHOUSE TIER 2 MECHANICAL FLOOR TIER 1 PODIUM GF FACADE LIGHTING DRAWINGS. CONTRACTOR TO ENSURE THESE
ARE FULLY COORDINATED.
9. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH
FACADE ACCESS DRAWINGS. CONTRACTOR TO ENSURE THESE
ARE FULLY COORDINATED.
T1-1
PROJECT TITLE
CLIENT
T1-3 T1-3.1
DESIGN MANAGEMENT
8050
T1-5
DESIGN ARCHITECT
PERKINS EASTMAN
CONSULTANT
DRAWING TITLE
TOWER 1
CALLOUTS ELEVATION C
1 : 300 01/31/2018 - - -