15 - Test Format For SCADA Test (OUTGOING)

1. The document provides test procedure details for switchboards at the Midfield Terminal Building of Abu Dhabi International Airport. 2. It records the testing of an outgoing feeder from switchboard EM-MDP-W2-L1.0-1, including checking the EPMCS signals and terminals. 3. The testing was performed using a Fluke 87V multi-meter that was recently calibrated and signatures were provided to verify the test was performed, witnessed and approved.

Uploaded by

Gajendran Sriram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
496 views1 page

15 - Test Format For SCADA Test (OUTGOING)

1. The document provides test procedure details for switchboards at the Midfield Terminal Building of Abu Dhabi International Airport. 2. It records the testing of an outgoing feeder from switchboard EM-MDP-W2-L1.0-1, including checking the EPMCS signals and terminals. 3. The testing was performed using a Fluke 87V multi-meter that was recently calibrated and signatures were provided to verify the test was performed, witnessed and approved.

Uploaded by

Gajendran Sriram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building - Abu Dhabi


International Airport
Test Procedure for Switchboards
Doc No: COM-0401-AN-PR-0006 Rev: 1 Checklist No: TR-ANELSW-FT-06

SWITCHBOARDS EPMCS OUTGOING FEEDER TEST RECORD SHEET


Module Tag Ref.: EM-MDP-W2-L1.0-1

1. General Data & Information:

Sub-System: Switchboard Feeder Designation: EM-DP-W2-L1.0-1


Temperature: 36°C Manufacturer: Schneider Electric
Humidity: 49 % Type: Powerline
Equipment Tested: EM-MDP-W2-L1.0-1 Serial No.: NA
Location / Level: PIER-4/L1.0 Rated Voltage: 400V
Room No.: 1682 Rated Current: 100A
nd
Switchgear: UPS-W2-L1.0-1 Date: 22 JUN 2016

2. EPMCS Signal checking Details:


S.NO TAG No Rating Description Terminal No. SCADA Status Remarks
MCCB ‘ON’ Status X1:1, X1:2 OK
1
Q1 100A MCCB ‘OFF’ Status X1:1, X1:3 OK
MCCB/CB ‘Trip’ Status X1:1, X1:4 OK
MCCB ‘ON’ Status X1:1, X1:2 OK
2
Q2 100A MCCB ‘OFF’ Status X1:1, X1:3 OK
MCCB/CB ‘Trip’ Status X1:1, X1:4 OK

3. Testing Equipment Details:

Type / Calibration Calibration


S. No. Equipment Name Make Serial No.
Model Date Certificate Ref.
1 MULTI METER FLUKE 87V 08.11.2016 84196 20660087

Performed By: ALPHA POWER Witnessed By: ANEL Witnessed By: TCA-JV Approved By: AECOM
Name: JAYAPRAKASH Name: RAMKUMAR Name: A.KARA KAYA Name:

Signature: Signature: Signature: Signature:

Date: Date: Date: Date: