Subject: Range of Application: Performance Class G1
Subject: Range of Application: Performance Class G1
Korea 121-720
TEL: 82-2-707-7000 FAX: 82-2-707-7799
www.hyosung.com
The requirement for range of application is that engine in vital service shall be guaranteed by the manufacturer to be able
to accept full load within 10 seconds of receiving the starting signal described in DEP 31.29.80.30-Gen, 2.2.
In general, the following operating limit values are applied as per ISO 8528-5, Table 3 – Operating limit values.
(Reciprocating internal combustion engine driven alternating current generating sets)
In additions, please consider “The maximum time allowed for the emergency generator set to accept the nominal load
after initiation of a start command from cold shall be 25 s described in DEP 33.65.11.32 Gen, 8.2”.
Therefore, offered generating sets are able to accept full load within 20~30 seconds of receiving the starting signal as
following table based on BMEP (Brake Mean Effective Pressure) at COP (site).
Genset Rating kW 150 400 500 750 800 1000 2000 at site, 55 deg.C
Model NTA855G4 VTA28G5 QST30G3 QSK38G2 QSK50G3 QSK60G3 QSK95G4
ISO Rating (COP) kW 272 492 634 893 1,100 1,305 2,579
Diesel Engine Fan loss kW 25 30 45 50 70 80 100 Assumption
Rating Rating after fan loss kW 247 462 589 843 1,030 1,225 2,479
Derating factor % 97.3 97.3 97.3 100.0 82.0 100.0 100.0 at site, 55 deg.C
Net power rating kW 240 449 573 843 845 1,225 2,479
Generator Efficiency % 90.0 94.5 94.5 95.3 96.0 96.0 96.0
Rating kW 216 425 541 803 811 1,176 2,380 at site, 55 deg.C
Genset Gap from required power kW 66 25 41 53 11 176 380
Gap from required power % 44 6 8 7 1 18 19
BMEP at PRP kPa 1,806 1,599 2,117 2,098 1,916 2,144 2,409 Refer to engine data
(rating at PRP) bhp 425 750 1,080 1,326 1,622 2,165 3,847
Diesel Engine
BMEP at COP kPa 1,551 1,407 1,666 1,894 1,742 1,732 2,166
BMEP
(rating at COP) bhp 365 660 850 1,197 1,475 1,749 3,459
BMEP at COP (Site) kPa 866 1,320 1,528 1,759 1,719 1,427 1,755 Considering Gap
Performance Class
Guide values for First power stage % 97 60 53 46 47 54 47
G2 base
maximum
Transient voltage
possible sudden Second power stage % 100 100 88 76 77 91 77
deviation : < - 20%
power
increases Transient frequency
Third power stage % 100 100 100 100 100
deviation : < -10%
Starting time up to rated from receiving the
S 10 10 10 10 10 10 12
voltage and frequency starting signal.
with time delay (3
Input first power stage S 3 3 3 3 3 3 3 seconds) to close
Time to accept circuit breaker
full load Voltage Recovery Time S 6 6 6 6 6 6 6
(100% load) Input second power stage S - - - - - - -
Voltage Recovery Time S - - 6 6 6 6 6
Input thrid power stage S - - - - - - -
Total time to input 100%
S 19 19 25 25 25 25 27
load
Remark Option Option