Hyundai Excavator Pattern Change Diagrams
Hyundai Excavator Pattern Change Diagrams
4
2
label in the cab to match the
3 RH 3 P
P
FRONT
2
4
Nut(24) new pattern.
T 1 LH
FRONT
Mounting bolt(77)
P
H
1 2 F
D
4 3 3 4 A
LH
2 1
1
Terminal block
H
J
G
J T
F
G
A
E
E
D
B B
R35Z74OP43
4-21
2) PATTERN
ATTERN CHANGE VALVE INSTALL (option)
※ If the machine is equipped with the pattern change valve, the machine operation pattern can be
easily changed.
※ Whenever a change is made to the machine control pattern also exchange the pattern label in
the cab to match the new pattern.
1 1
4 3 4 3
Left RCV lever
2 2
5 5
8 7 8 7
Right RCV lever
6 6
R35Z94OP52
4-22
Hyundai Excavator
Pattern Change Diagram 2
Behind Cab Access
12. RCV LEVER OPERATING PATTERN
1) PATTERN CHANGE VALVE NOT INSTALL (standard)
C Type Terminal
J block
RCV-RH 2 90 (Lever only) H ※ Whenever a change is made
RCV-LH G
F to the machine control pat-
Nut(22) E
D
tern also exchange the pat-
Mounting B tern label in the cab to
bolt(17) A
match the new pattern.
※ The hose modification works
T must be carried out between
1 2 1
4
P
4
RCV lever and ter minal
3
P 2 block (Not between terminal
3 T
1
block and MCV).
140F4OP41
4-26
2) PATTERN
ATTERN CHANGE VALVE INSTALL (option)
※ If the machine is equipped with the pattern change valve, the machine operation pattern can
be easily changed.
※ Whenever a change is made to the machine control pattern also exchange the pattern label
in the cab to match the new pattern.
Operation ISO type A type
1 1
4 3 4 3
Left RCV lever
2 2
5 5
8 7 8 7
Right RCV lever
6 6
Bolt A TYPE(OPT)
(2) Change of operating pattern
2
① Loosen bolt. 1
② Move lever to the "ISO" or "A" position. ISO TYPE(STD)
③ After the lever is set, tighten the bolt in order Lever
to secure the lever. Pattern change valve
·Position ① for "ISO" pattern.
·Position ② for "A" pattern.
180F4OP22
4-27