Quantity of Concrete Take Off: 2.5032: Beam No

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

BEAM NO :

QUANTITY OF CONCRETE TAKE OFF : 2.5032 m^3

WEIGHT OF MAIN BAR:

Steel Quantity Diameter (mm) Weights (kg/m) Bar Length (m)


4 12 0.888 9.4
5 32 6.313 9.4
4 32 6.313 0
5 32 6.313 0
5 32 6.313 0
4 25 3.854 0
5 12 0.888 0
0
0
0
0
0
0
0
0
0

WEIGHT OF LINK:

Link Quantity Diameter (mm) LinkWeights (kg/m) Link Length (m)


45 10 0.616 2.2
45 10 0.616 1.9
0 0 0 0
0 0 0 0
0 0 0 0

Pondage for reinforcement estimate : 177.27380952381 Kg/m^3


LENGTH : 8.94 m
WIDTH : 0.4 m
HEIGHT : 0.7 m

Reference:

Weight (one bar) kg Weight (Total amount of bar) kg


8.3472 33.3888
59.3422 296.711
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
TOTAL WEIGHT: 330.0998 Kg

Weight (one link) Weight (Total amount of link)


1.3552 60.984
1.1704 52.668
0 0
0 0
0 0
Total WEIGHT: 113.652 Kg